0911-00-096
|
ANGELINA
|
LUFKIN
|
$3,579,497
|
VA
|
C 911-00-96
|
02/02/2024
|
12/22/2023
|
HWY IMPRV
|
STRIPE-A-ZONE, LLC
($2,621,784)
|
|
|
6462-57-001
|
ANGELINA
|
LUFKIN
|
$1,565,500
|
SH0007
|
RMC - 646257001
|
02/02/2024
|
12/22/2023
|
TRAF CONTROL SERVICES
|
PROFESSIONAL TRAFFIC CONTROL LLC
($1,289,920)
|
|
|
0913-20-092
|
AUSTIN
|
YOAKUM
|
$3,275,625
|
CR
|
BR 1802(834)
|
02/01/2024
|
12/21/2023
|
BRIDGE REPL
|
TEXAS MATERIALS GROUP, INC.
($4,031,921)
|
|
|
6461-10-001
|
AUSTIN
|
YOAKUM
|
$364,000
|
IH0010
|
MMC - 646110001
|
02/01/2024
|
12/21/2023
|
HOT MIX
|
JAMES CONSTRUCTION GROUP, LLC
($374,000)
|
|
|
6405-68-001
|
BASTROP
|
AUSTIN
|
$584,570
|
SH0071
|
RMC - 640568001
|
02/01/2024
|
12/21/2023
|
MOW HWY RIGHT OF WAY
|
ICOS MANAGEMENT, LLC
($439,334)
|
|
|
0320-06-008
|
BELL
|
WACO
|
$65,858,239
|
SL 363
|
F 2024(849)
|
02/02/2024
|
12/22/2023
|
CONSTRUCT NEW ROAD
|
JAMES CONSTRUCTION GROUP, LLC
($53,775,775)
|
|
|
6443-84-001
|
BELL
|
WACO
|
$1,510,250
|
US0190
|
MMC - 644384001
|
02/01/2024
|
12/21/2023
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,467,750)
|
|
|
0915-00-259
|
BEXAR
|
SAN ANTONIO
|
$1,497,531
|
VA
|
C 915-00-259
|
02/01/2024
|
12/21/2023
|
TRAF SIGNAL IMPRVS
|
E-Z BEL CONSTRUCTION, LLC
($1,607,455)
|
|
|
6439-08-001
|
BEXAR
|
SAN ANTONIO
|
$181,175
|
SH0016
|
BPM - 643908001
|
02/21/2024
|
01/10/2024
|
EROSION REPAIR
|
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC
($152,352)
|
|
|
6460-23-001
|
BEXAR
|
SAN ANTONIO
|
$68,605
|
IH0410
|
RMC - 646023001
|
02/21/2024
|
01/17/2024
|
BRIDGE RAIL REPAIR
|
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC
($67,613)
|
|
|
6457-11-001
|
BORDEN
|
ABILENE
|
$120,148
|
US0180
|
RMC - 645711001
|
02/20/2024
|
11/21/2023
|
MOW HWY RIGHT OF WAY
|
THE ROLLING GROUP LLC
($99,736)
|
|
|
0085-02-054
|
BOWIE
|
ATLANTA
|
$24,948,822
|
US 259
|
C 85-2-54
|
02/01/2024
|
12/21/2023
|
REHAB EXIST ROADWAY
|
LONGVIEW BRIDGE AND ROAD, LTD.
($26,827,890)
|
|
|
0218-02-055
|
BOWIE
|
ATLANTA
|
$6,981,684
|
IH 369
|
F 2024(669)
|
02/02/2024
|
12/22/2023
|
RESURF ROADWAY
|
EAST TEXAS BRIDGE, INC.
($10,246,641)
|
|
|
6462-18-001
|
BOWIE
|
ATLANTA
|
$698,800
|
IH0030
|
RMC - 646218001
|
02/02/2024
|
12/25/2023
|
CABLE BARRIER REPAIR
|
ROSS SA ENTERPRISE LLC
($667,815)
|
|
|
6462-12-001
|
BRAZOS
|
BRYAN
|
$501,538
|
SH0006
|
RMC - 646212001
|
02/01/2024
|
12/21/2023
|
PAVMT MRK
|
REPUBLIC TRAFFIC SAFETY, INC.
($491,400)
|
|
|
0923-00-070
|
BROWN
|
BROWNWOOD
|
$6,844,438
|
VA
|
C 923-00-70
|
02/01/2024
|
12/21/2023
|
PREVENT MAINT
|
L&L COMPANY
($5,120,672)
|
|
|
6462-10-001
|
BURLESON
|
BRYAN
|
$333,750
|
SH0036
|
RMC - 646210001
|
02/02/2024
|
12/08/2023
|
TREE RMVL
|
ICOS MANAGEMENT, LLC
($285,360)
|
|
|
0252-02-064
|
BURNET
|
AUSTIN
|
$6,510,509
|
US 281
|
C 252-2-64
|
02/01/2024
|
12/21/2023
|
RESURF ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($5,701,426)
|
|
|
0515-03-055
|
CALHOUN
|
YOAKUM
|
$906,481
|
FM 1090
|
F 2024(765)
|
02/01/2024
|
12/21/2023
|
REHAB EXIST ROADWAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($1,007,462)
|
|
|
6457-41-001
|
CALLAHAN
|
ABILENE
|
$417,308
|
IH0020
|
RMC - 645741001
|
02/02/2024
|
11/27/2023
|
MOW HWY RIGHT OF WAY
|
JOSE ERNESTO SALAZAR, LLC
($391,555)
|
|
|
6459-67-001
|
CAMERON
|
PHARR
|
$3,014,573
|
BU0077X
|
RMC - 645967001
|
02/01/2024
|
12/27/2023
|
REHAB OF EXIST ROADWAY
|
IOC COMPANY, LLC
($3,308,463)
|
|
|
0218-03-086
|
CASS
|
ATLANTA
|
$9,881,473
|
US 59
|
C 218-3-86
|
02/02/2024
|
12/22/2023
|
SURF/ROADWAY RESTOR
|
RK HALL, LLC
($9,573,841)
|
|
|
0226-06-036
|
CASTRO
|
LUBBOCK
|
$47,743,990
|
US 385
|
C 226-6-36
|
02/01/2024
|
12/21/2023
|
SUPER 2
|
DUININCK, INC.
($54,353,807)
|
|
|
6452-75-001
|
CHAMBERS
|
BEAUMONT
|
$692,891
|
IH0010
|
RMC - 645275001
|
02/01/2024
|
12/21/2023
|
METAL BEAM GUARD FENCE REPAIR
|
HAZMAT INTERNATIONAL, INC.
($554,027)
|
|
|
0042-12-086
|
CHILDRESS
|
CHILDRESS
|
$11,116,978
|
US 287
|
F 2024(640)
|
02/02/2024
|
12/22/2023
|
REHAB EXIST ROADWAY
|
GILVIN-TERRILL, LTD.
($15,308,760)
|
|
|
0381-01-017
|
CHILDRESS
|
CHILDRESS
|
$6,111,811
|
US 62
|
BR 2024(641)
|
02/01/2024
|
12/21/2023
|
BRIDGE REPL
|
ALTUS CONSTRUCTION LLC
($6,310,486)
|
|
|
0224-02-052
|
CLAY
|
WICHITA FALLS
|
$5,923,336
|
US 287
|
C 224-2-52
|
02/02/2024
|
12/22/2023
|
RESURF ROADWAY
|
JAGOE-PUBLIC COMPANY
($5,372,832)
|
|
|
6460-27-001
|
COLEMAN
|
BROWNWOOD
|
$1,841,495
|
US0084
|
RMC - 646027001
|
02/02/2024
|
12/22/2023
|
MILL AND INLAY
|
ALLEN KELLER COMPANY
($1,840,800)
|
|
|
0918-24-267
|
COLLIN
|
DALLAS
|
$4,285,867
|
CS
|
STP 2024(742)HESG
|
02/02/2024
|
12/22/2023
|
TRAF SIGNAL IMPRVS
|
FNH CONSTRUCTION, LLC
($4,872,333)
|
|
|
6451-09-001
|
COLLIN
|
DALLAS
|
$375,869
|
FM0455
|
RMC - 645109001
|
02/02/2024
|
12/25/2023
|
CULVERT EXTENSION & CROSS DRAINAGE
|
AAD CONTRACTING INC.
($397,772)
|
|
|
6456-95-001
|
COLLIN
|
DALLAS
|
$565,625
|
US0075
|
RMC - 645695001
|
02/01/2024
|
12/21/2023
|
ON CALL TRAF CONTROL SERVICES
|
SUPERIOR TRAFFIC CONTROL, LLC
($428,320)
|
|
|
0449-01-024
|
COLLINGSWORTH
|
CHILDRESS
|
$4,283,347
|
FM 338
|
STP 2024(639)HES
|
02/01/2024
|
12/21/2023
|
WIDEN ROAD - ADD LANES AND SHOULDERS
|
J. LEE MILLIGAN, INC.
($4,695,146)
|
|
|
6461-03-001
|
COLORADO
|
YOAKUM
|
$364,000
|
SH0071
|
MMC - 646103001
|
02/01/2024
|
12/21/2023
|
HOT MIX
|
BRAUNTEX MATERIALS, INC.
($340,000)
|
|
|
3212-05-013
|
COMAL
|
SAN ANTONIO
|
$15,685,045
|
FM 3351
|
STP 2024(729)MM
|
02/02/2024
|
12/22/2023
|
BRIDGE REPL
|
DAN WILLIAMS COMPANY
($12,558,078)
|
|
|
0035-02-039
|
CONCHO
|
SAN ANGELO
|
$5,040,942
|
US 83
|
BR 2024(719)
|
02/01/2024
|
12/21/2023
|
BRIDGE MAINT
|
RELMCO, INC.
($4,356,503)
|
|
|
2374-03-099
|
DALLAS
|
DALLAS
|
$6,512,344
|
IH 20
|
BR 2024(745)
|
02/01/2024
|
12/21/2023
|
BRIDGE MAINT
|
ALTUS CONSTRUCTION LLC
($5,746,217)
|
|
|
2374-04-086
|
DALLAS
|
DALLAS
|
$15,579,409
|
IH 20
|
C 2374-4-86
|
02/02/2024
|
08/25/2024
|
REHAB EXIST ROADWAY
|
FNH CONSTRUCTION, LLC
($20,092,843)
|
|
|
2374-07-077
|
DALLAS
|
DALLAS
|
$4,207,192
|
IH 635
|
BR 2024(746)
|
02/01/2024
|
12/21/2023
|
BRIDGE MAINT
|
RAGLE CONSTRUCTION, INC.
($3,487,275)
|
|
|
6452-25-001
|
DALLAS
|
DALLAS
|
$29,002,050
|
IH0030
|
RMC - 645225001
|
02/02/2024
|
01/01/2024
|
BUNDLED BID
|
FIREMAN EXCAVATING, INC.
($24,325,136)
|
|
|
0196-01-117
|
DENTON
|
DALLAS
|
$3,525,061
|
US 77
|
C 196-1-117
|
02/02/2024
|
12/22/2023
|
REHAB EXIST ROADWAY
|
JAGOE-PUBLIC COMPANY
($3,803,760)
|
|
|
6448-41-001
|
DENTON
|
DALLAS
|
$567,907
|
IH0035
|
RMC - 644841001
|
02/02/2024
|
12/21/2023
|
MOW HWY RIGHT OF WAY
|
ICOS MANAGEMENT, LLC
($423,832)
|
|
|
6448-43-001
|
DENTON
|
DALLAS
|
$309,338
|
FM0156
|
RMC - 644843001
|
02/02/2024
|
12/21/2023
|
MOW HWY RIGHT OF WAY
|
ANTHONY SERVICES
($229,893)
|
|
|
1113-01-030
|
DEWITT
|
YOAKUM
|
$12,877,332
|
FM 766
|
C 1113-1-30
|
02/01/2024
|
12/21/2023
|
REHAB EXIST ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($11,601,489)
|
|
|
6422-12-001
|
DEWITT
|
YOAKUM
|
$1,931,346
|
UA0077
|
RMC - 642212001
|
02/01/2024
|
12/21/2023
|
ASPH PAVMT REPAIR
|
HUNTER INDUSTRIES, LTD.
($1,882,668)
|
|
|
6460-66-001
|
DIMMIT
|
LAREDO
|
$997,525
|
US0083
|
BPM - 646066001
|
02/01/2024
|
12/28/2023
|
BRIDGE PREVENT MAINT
|
RELMCO, INC.
($922,080)
|
|
|
0007-03-111
|
EASTLAND
|
BROWNWOOD
|
$23,118,579
|
IH 20
|
C 7-3-111
|
02/01/2024
|
12/21/2023
|
HAZARD ELIM & SAFETY
|
NORTHEASTERN PAVERS, LLC
($21,627,297)
|
|
|
6460-25-001
|
EASTLAND
|
BROWNWOOD
|
$499,144
|
SH0036
|
RMC - 646025001
|
02/02/2024
|
12/22/2023
|
MILL AND INLAY
|
BLACKSMITH VENTURES LLC
($601,942)
|
|
|
0004-07-138
|
ECTOR
|
ODESSA
|
$18,273,514
|
IH 20
|
C 4-7-138
|
02/01/2024
|
12/21/2023
|
ROADWAY REHAB
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($24,827,053)
|
|
|
6447-42-001
|
ECTOR
|
ODESSA
|
$515,550
|
IH0020
|
RMC - 644742001
|
02/02/2024
|
12/29/2023
|
ILLUM MAINT
|
WILLIS ELECTRIC CO., LP
($614,925)
|
|
|
6462-32-001
|
ECTOR
|
ODESSA
|
$526,000
|
IH0020
|
MMC - 646232001
|
02/01/2024
|
12/21/2023
|
HOT MIX
|
TOUCHSTONE RESOURCES, LLC
($657,500)
|
|
|
0442-03-042
|
ELLIS
|
DALLAS
|
$127,632,941
|
IH 35E
|
F 2024(737)
|
02/01/2024
|
12/21/2023
|
RECON INTERCHANGE
|
FLATIRON CONSTRUCTORS, INC.
($146,081,306)
|
|
|
6459-25-001
|
ELLIS
|
DALLAS
|
$2,031,378
|
US0067
|
RMC - 645925001
|
02/01/2024
|
12/21/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
PEACHTREE CONSTRUCTION, LTD.
($2,418,808)
|
|
|
0924-00-149
|
EL PASO
|
EL PASO
|
$677,150
|
VA
|
C 924-00-149
|
02/02/2024
|
12/22/2023
|
PREVENT MAINT
|
TRI STATE ELECTRIC, LTD.
($793,768)
|
|
|
0924-06-700
|
EL PASO
|
EL PASO
|
$413,160
|
VA
|
C 924-6-700
|
02/01/2024
|
12/21/2023
|
PREVENT MAINT
|
HJC FARMS, INC.
($458,260)
|
|
|
6457-81-001
|
EL PASO
|
EL PASO
|
$1,096,690
|
IH0010
|
RMC - 645781001
|
02/01/2024
|
12/22/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
ALLEN CONCRETE, LLC
($1,140,753)
|
|
|
6460-62-001
|
EL PASO
|
EL PASO
|
$1,144,053
|
IH0010
|
RMC - 646062001
|
02/01/2024
|
12/21/2023
|
MILL AND INLAY
|
INTERNATIONAL EAGLE ENTERPRISES, INC.
($1,141,310)
|
|
|
6456-09-001
|
ERATH
|
FORT WORTH
|
$852,301
|
US0377
|
RMC - 645609001
|
02/01/2024
|
12/21/2023
|
THERMOPLASTIC PAVMT MRK
|
TRP CONSTRUCTION GROUP, LLC
($759,555)
|
|
|
6443-78-001
|
FALLS
|
WACO
|
$1,878,200
|
SH0006
|
MMC - 644378001
|
02/02/2024
|
12/25/2023
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,825,100)
|
|
|
0549-02-034
|
FANNIN
|
PARIS
|
$1,961,462
|
SH 121
|
BR 2024(727)
|
02/02/2024
|
12/22/2023
|
BRIDGE MAINT
|
DCC CONSTRUCTION AND SERVICES, L.L.C.
($2,050,081)
|
|
|
6457-19-001
|
FISHER
|
ABILENE
|
$223,604
|
US0180
|
RMC - 645719001
|
02/20/2024
|
11/21/2023
|
MOW HWY RIGHT OF WAY
|
KENNETH THOMASON
($206,466)
|
|
|
6404-94-001
|
GARZA
|
LUBBOCK
|
$708,976
|
US0084
|
RMC - 640494001
|
02/01/2024
|
12/21/2023
|
REHAB OF EXIST ROADWAY
|
DIGG COMMERCIAL, LLC
($748,761)
|
|
|
0045-18-043
|
GRAYSON
|
PARIS
|
$6,411,197
|
US 82
|
C 45-18-43
|
02/02/2024
|
12/22/2023
|
PREVENT MAINT
|
RK HALL, LLC
($5,645,404)
|
|
|
0901-19-204
|
GRAYSON
|
PARIS
|
$1,574,456
|
CR
|
BR 2022(464)
|
02/01/2024
|
12/21/2023
|
BRIDGE REPL
|
HIGHWAY 19 CONSTRUCTION LLC
($1,590,709)
|
|
|
0027-13-238
|
HARRIS
|
HOUSTON
|
$7,865,784
|
IH 69
|
C 27-13-238
|
02/02/2024
|
12/22/2023
|
SURF/ROADWAY RESTOR
|
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
($7,540,358)
|
|
|
0271-16-167
|
HARRIS
|
HOUSTON
|
$1,734,806
|
IH 610
|
C 271-16-167
|
02/01/2024
|
12/21/2023
|
SURF/ROADWAY RESTOR
|
TEXAS MATERIALS GROUP, INC.
($1,439,309)
|
|
|
0508-01-394
|
HARRIS
|
HOUSTON
|
$2,207,938
|
IH 10
|
C 508-1-394
|
02/01/2024
|
12/21/2023
|
LANDSCAPE DEVELOPMENT
|
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
($2,043,682)
|
|
|
3510-06-027
|
HARRIS
|
HOUSTON
|
$57,694,107
|
SH 99
|
C 3510-6-27
|
02/02/2024
|
12/22/2023
|
WIDEN ROAD - ADD LANES
|
BRICE CONSTRUCTION AND DESIGN LLC
($55,689,700)
|
|
|
6459-71-001
|
HARRIS
|
HOUSTON
|
$588,761
|
SL0008
|
RMC - 645971001
|
02/01/2024
|
12/25/2023
|
MOW HWY RIGHT OF WAY
|
YELLOWSTONE LANDSCAPE - CENTRAL, INC.
($620,139)
|
|
|
6460-46-001
|
HARRIS
|
HOUSTON
|
$932,195
|
IH0010
|
RMC - 646046001
|
02/02/2024
|
12/25/2023
|
PAVMT MRK GRAPHICS
|
PROFESSIONAL TRAFFIC CONTROL LLC
($524,860)
|
|
|
6462-19-001
|
HARRISON
|
ATLANTA
|
$510,800
|
IH0020
|
RMC - 646219001
|
02/02/2024
|
12/25/2023
|
CABLE BARRIER REPAIR
|
ROSS SA ENTERPRISE LLC
($478,435)
|
|
|
6457-21-001
|
HASKELL
|
ABILENE
|
$278,258
|
US0380
|
RMC - 645721001
|
02/20/2024
|
11/21/2023
|
MOW HWY RIGHT OF WAY
|
TRIPLE T MAINTENANCE INC.
($241,889)
|
|
|
0286-01-065
|
HAYS
|
AUSTIN
|
$945,008
|
SH 80
|
C 286-1-65
|
02/02/2024
|
12/22/2023
|
PREVENT MAINT
|
DEAN WORD COMPANY, LTD.
($1,035,073)
|
|
|
6456-91-001
|
HENDERSON
|
TYLER
|
$5,233,466
|
SH0019
|
RMC - 645691001
|
02/02/2024
|
12/22/2023
|
PAVMT MRK
|
TRP CONSTRUCTION GROUP, LLC
($4,796,394)
|
|
|
6443-66-001
|
HIDALGO
|
PHARR
|
$5,657,661
|
IH0002
|
RMC - 644366001
|
02/02/2024
|
12/25/2023
|
ASPH PAVMT REPAIR
|
IOC COMPANY, LLC
($5,590,785)
|
|
|
6452-13-001
|
HIDALGO
|
PHARR
|
$3,364,164
|
IH0069C
|
RMC - 645213001
|
02/02/2024
|
12/25/2023
|
PAVMT MRK
|
HIGHWAY BARRICADES AND SERVICES, LLC
($2,538,848)
|
|
|
6457-79-001
|
HOOD
|
FORT WORTH
|
$399,277
|
BU0377H
|
RMC - 645779001
|
02/01/2024
|
12/21/2023
|
MOW HWY RIGHT OF WAY
|
T&L CLEANING SERVICES LLC
($440,020)
|
|
|
0002-07-057
|
HUDSPETH
|
EL PASO
|
$860,190
|
IH 10
|
C 2-7-57
|
02/01/2024
|
12/21/2023
|
INFRASTRUCT IMPRVS
|
TRI STATE ELECTRIC, LTD.
($922,153)
|
|
|
0203-02-052
|
HUNT
|
PARIS
|
$3,891,015
|
US 69
|
C 203-2-52
|
02/01/2024
|
12/21/2023
|
PREVENT MAINT
|
EAST TEXAS BRIDGE, INC.
($4,408,823)
|
|
|
6457-50-001
|
HUNT
|
PARIS
|
$435,190
|
SH0034
|
BPM - 645750001
|
02/02/2024
|
12/22/2023
|
BRIDGE PREVENT MAINT
|
DCC CONSTRUCTION AND SERVICES, L.L.C.
($416,470)
|
|
|
0134-10-020
|
JACK
|
FORT WORTH
|
$17,136,600
|
US 380
|
C 134-10-20
|
02/02/2024
|
12/22/2023
|
CONSTRUCT NEW ROADWAY LANES
|
A. L. HELMCAMP, INC.
($18,488,019)
|
|
|
0306-03-139
|
JEFFERSON
|
BEAUMONT
|
$11,486,994
|
SH 73
|
BR 2024(688)
|
02/01/2024
|
12/21/2023
|
BRIDGE MAINT
|
SOUTHERN ROAD & BRIDGE, LLC
($10,927,788)
|
|
|
0667-02-117
|
JEFFERSON
|
BEAUMONT
|
$3,892,160
|
FM 366
|
C 667-2-117
|
02/02/2024
|
12/22/2023
|
SURF/ROADWAY RESTOR
|
TEXAS MATERIALS GROUP, INC.
($5,074,279)
|
|
|
0920-00-161
|
JEFFERSON
|
BEAUMONT
|
$830,451
|
VA
|
F 2024(720)
|
02/02/2024
|
12/22/2023
|
INSTL/REPLACE SIGNS
|
VACA UNDERGROUND UTILITIES INC
($721,370)
|
|
|
0920-00-165
|
JEFFERSON
|
BEAUMONT
|
$2,211,955
|
VA
|
F 2024(721)
|
02/01/2024
|
12/21/2023
|
HAZARD ELIM & SAFETY
|
INTERSTATE BARRICADES & MARKINGS, INC.
($891,512)
|
|
|
6460-85-001
|
JEFFERSON
|
BEAUMONT
|
$300,165
|
SH0347
|
RMC - 646085001
|
02/01/2024
|
11/20/2023
|
PUMP STATION & DRAINAGE SYSTEM CLEAN...
|
AIMS COMPANIES
($129,046)
|
|
|
6463-93-001
|
JIM WELLS
|
CORPUS CHRISTI
|
$228,600
|
US0281
|
MMC - 646393001
|
02/20/2024
|
01/26/2024
|
EMULSION
|
ERGON ASPHALT & EMULSIONS, INC.
($216,180)
|
|
|
0014-04-086
|
JOHNSON
|
FORT WORTH
|
$19,894,217
|
IH 35W
|
F 2024(667)
|
02/01/2024
|
12/21/2023
|
RESURF ROADWAY
|
NORTHEASTERN PAVERS, LLC
($18,713,823)
|
|
|
1122-02-044
|
KARNES
|
CORPUS CHRISTI
|
$17,741,894
|
FM 887
|
C 1122-2-44
|
02/02/2024
|
12/22/2023
|
REHAB EXIST ROADWAY
|
CK NEWBERRY, LLC
($15,967,612)
|
|
|
6464-00-001
|
KARNES
|
CORPUS CHRISTI
|
$162,000
|
US0181
|
MMC - 646400001
|
02/20/2024
|
01/29/2024
|
EMULSION
|
ERGON ASPHALT & EMULSIONS, INC.
($162,000)
|
|
|
1396-01-013
|
KAUFMAN
|
DALLAS
|
$5,890,953
|
FM 1391
|
BR 2024(767)
|
02/02/2024
|
12/22/2023
|
BRIDGE REPL
|
HIGHWAY 19 CONSTRUCTION LLC
($5,443,324)
|
|
|
0916-02-023
|
KLEBERG
|
CORPUS CHRISTI
|
$531,485
|
VA
|
STP 2022(077)TAPS
|
02/02/2024
|
12/22/2023
|
CONSTRUCT PEDESTRIAN INFRASTRUCT
|
LUCANIA CONTRACTORS LLC
($520,422)
|
|
|
6463-94-001
|
KLEBERG
|
CORPUS CHRISTI
|
$292,500
|
US0077
|
MMC - 646394001
|
02/20/2024
|
01/26/2024
|
HOT MIX
|
ANDERSON COLUMBIA CO., INC.
($322,583)
|
|
|
6460-45-001
|
LAMAR
|
PARIS
|
$1,573,053
|
US0082
|
RMC - 646045001
|
02/01/2024
|
12/22/2023
|
REFL PAVMT MRK (LONG LINE)
|
STRIPING TECHNOLOGY, L.P.
($1,127,842)
|
|
|
0905-00-119
|
LUBBOCK
|
LUBBOCK
|
$8,493,395
|
VA
|
C 905-00-119
|
02/02/2024
|
12/22/2023
|
FY 2024 STRIPING
|
L&L COMPANY
($7,117,197)
|
|
|
0905-00-120
|
LUBBOCK
|
LUBBOCK
|
$1,454,629
|
VA
|
C 905-00-120
|
02/01/2024
|
12/21/2023
|
FY 2024 RAISED PAVMT MARKERS
|
FC TRAFFIC CONTROL, INC.
($1,639,160)
|
|
|
0905-06-095
|
LUBBOCK
|
LUBBOCK
|
$17,487,978
|
CS
|
STP 2019(518)MM
|
02/02/2024
|
11/24/2023
|
WIDEN ROAD - ADD LANES
|
LONE STAR DIRT & PAVING, LTD.
($19,074,047)
|
|
|
6451-55-001
|
LUBBOCK
|
LUBBOCK
|
$260,700
|
FM2255
|
RMC - 645155001
|
02/01/2024
|
12/21/2023
|
CULVERT REPAIR
|
DIGG COMMERCIAL, LLC
($258,007)
|
|
|
6461-02-001
|
MATAGORDA
|
YOAKUM
|
$612,000
|
SH0035
|
MMC - 646102001
|
02/02/2024
|
12/22/2023
|
HOT-MIX COLD-LAID
|
QUALITY HOT MIX, INC.
($594,000)
|
|
|
6461-09-001
|
MATAGORDA
|
YOAKUM
|
$368,000
|
SH0035
|
MMC - 646109001
|
02/02/2024
|
12/22/2023
|
HOT MIX
|
QUALITY HOT MIX, INC.
($364,000)
|
|
|
0014-10-068
|
MCLENNAN
|
WACO
|
$620,018
|
BU 77-L
|
STP 2024(723)HES
|
02/01/2024
|
12/21/2023
|
INSTL TRAF SIGNAL
|
E-Z BEL CONSTRUCTION, LLC
($787,787)
|
|
|
0014-10-071
|
MCLENNAN
|
WACO
|
$1,247,631
|
BU 77-L
|
BR 2024(859)
|
02/01/2024
|
12/21/2023
|
RMVL AND DISPOSAL OF BRIDGE
|
KNIFE RIVER CORPORATION - SOUTH
($1,121,181)
|
|
|
0049-01-095
|
MCLENNAN
|
WACO
|
$29,068,891
|
SH 6
|
F 2024(764)
|
02/02/2024
|
12/22/2023
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($22,852,588)
|
|
|
0380-09-102
|
MIDLAND
|
ODESSA
|
$693,679
|
BS 349C
|
C 380-9-102
|
02/02/2024
|
12/22/2023
|
INSTL TRAF SIGNAL
|
WILLIS ELECTRIC CO., LP
($353,315)
|
|
|
6462-31-001
|
MIDLAND
|
ODESSA
|
$435,000
|
IH0020
|
MMC - 646231001
|
02/01/2024
|
12/21/2023
|
HOT MIX
|
RK HALL, LLC
($432,700)
|
|
|
0917-12-090
|
MILAM
|
BRYAN
|
$407,382
|
VA
|
STP 2024(734)HES
|
02/01/2024
|
12/21/2023
|
INSTL REFLECTORIZED BACK PLATES
|
TRAF-TEX, INC.
($289,823)
|
|
|
6459-29-001
|
MILAM
|
BRYAN
|
$291,250
|
US0079
|
RMC - 645929001
|
02/27/2024
|
11/15/2023
|
TREE RMVL
|
ICOS MANAGEMENT, LLC
($243,100)
|
|
|
6457-13-001
|
MITCHELL
|
ABILENE
|
$266,890
|
IH0020
|
RMC - 645713001
|
02/20/2024
|
11/21/2023
|
MOW HWY RIGHT OF WAY
|
ABESCAPE LANDSCAPING, LLC
($263,065)
|
|
|
0044-04-048
|
MONTAGUE
|
WICHITA FALLS
|
$32,009,121
|
US 82
|
F 2024(766)
|
02/01/2024
|
08/25/2024
|
WIDEN ROAD - ADD LANES
|
JAGOE-PUBLIC COMPANY
($41,745,757)
|
|
|
6421-35-001
|
MONTAGUE
|
WICHITA FALLS
|
$1,086,234
|
US0287
|
RMC - 642135001
|
02/02/2024
|
12/22/2023
|
METAL BEAM GUARD FENCE REPAIR
|
3LW CIVIL LLC
($841,927)
|
|
|
0675-08-120
|
MONTGOMERY
|
HOUSTON
|
$2,917,360
|
IH 45
|
CC 675-8-120
|
02/02/2024
|
12/22/2023
|
HWY IMPRV
|
JAMES CONSTRUCTION GROUP, LLC
($3,167,866)
|
|
|
0912-37-246
|
MONTGOMERY
|
HOUSTON
|
$1,652,211
|
VA
|
C 912-37-246
|
02/01/2024
|
12/21/2023
|
INSTL/REPLACE SIGNS
|
CREACOM, INC.
($1,406,505)
|
|
|
6457-33-001
|
MONTGOMERY
|
HOUSTON
|
$1,663,547
|
IH0045
|
RMC - 645733001
|
02/01/2024
|
12/25/2023
|
METAL BEAM GUARD FENCE REPAIR
|
HAZMAT INTERNATIONAL, INC.
($1,336,286)
|
|
|
6457-37-001
|
MONTGOMERY
|
HOUSTON
|
$711,292
|
IH0045
|
RMC - 645737001
|
02/02/2024
|
11/21/2023
|
CLEANING AND SWEEPING HWYS
|
PROFESSIONAL TRAFFIC CONTROL LLC
($659,840)
|
|
|
1727-02-024
|
MOORE
|
AMARILLO
|
$39,780,978
|
FM 281
|
C 1727-2-24
|
02/02/2024
|
12/22/2023
|
REHAB EXIST ROADWAY
|
J. LEE MILLIGAN, INC.
($41,097,397)
|
|
|
6462-69-001
|
MOORE
|
AMARILLO
|
$348,315
|
US0087
|
RMC - 646269001
|
02/02/2024
|
12/25/2023
|
METAL BEAM GUARD FENCE REPAIR
|
E.V.G. ENTERPRISE
($326,375)
|
|
|
6451-75-001
|
NACOGDOCHES
|
LUFKIN
|
$375,628
|
US0059
|
RMC - 645175001
|
02/01/2024
|
12/21/2023
|
MOW HWY RIGHT OF WAY - NACOGDOCHES
|
R&M INCORPORATED
($272,318)
|
|
|
6462-96-001
|
NACOGDOCHES
|
LUFKIN
|
$172,866
|
SH0007
|
RMC - 646296001
|
02/28/2024
|
02/05/2024
|
METAL BEAM GUARD FENCE REPAIR
|
ACE CONTRACTORS, INC.
($161,130)
|
|
|
6462-97-001
|
NACOGDOCHES
|
LUFKIN
|
$101,295
|
US0059
|
RMC - 646297001
|
02/28/2024
|
02/05/2024
|
TREE RMVL
|
K & R CONTRACTORS
($92,775)
|
|
|
6455-95-001
|
NAVARRO
|
DALLAS
|
$389,921
|
SH0031
|
RMC - 645595001
|
02/02/2024
|
12/21/2023
|
RETROREFLECTORIZED PAVMT MRK (LONG L...
|
TRP CONSTRUCTION GROUP, LLC
($236,427)
|
|
|
6457-71-001
|
NAVARRO
|
DALLAS
|
$1,365,672
|
IH0045
|
RMC - 645771001
|
02/01/2024
|
12/21/2023
|
FULL DEPTH CONC REPAIR
|
O. TREVINO CONSTRUCTION, LLC
($1,229,508)
|
|
|
6457-73-001
|
NOLAN
|
ABILENE
|
$305,798
|
IH0020
|
RMC - 645773001
|
02/02/2024
|
11/21/2023
|
MOW HWY RIGHT OF WAY
|
JOSE ERNESTO SALAZAR, LLC
($278,679)
|
|
|
0326-01-069
|
NUECES
|
CORPUS CHRISTI
|
$5,393,936
|
SH 286
|
F 2024(735)
|
02/01/2024
|
12/21/2023
|
RESURF ROADWAY
|
ANDERSON COLUMBIA CO., INC.
($6,335,415)
|
|
|
0617-01-211
|
NUECES
|
CORPUS CHRISTI
|
$5,930,611
|
SH 358
|
F 2024(736)
|
02/01/2024
|
12/21/2023
|
RESURF ROADWAY
|
ANDERSON COLUMBIA CO., INC.
($6,746,377)
|
|
|
3596-01-009
|
NUECES
|
CORPUS CHRISTI
|
$5,563,399
|
SS 3
|
F 2024(750)
|
02/02/2024
|
12/22/2023
|
RESURF ROADWAY
|
ANDERSON COLUMBIA CO., INC.
($6,716,238)
|
|
|
6459-31-001
|
NUECES
|
CORPUS CHRISTI
|
$2,697,134
|
SS0407
|
RMC - 645931001
|
02/02/2024
|
12/25/2023
|
BASE REPAIR WITH SEAL COAT AND/OR OV...
|
CK NEWBERRY, LLC
($3,090,451)
|
|
|
0063-04-068
|
PANOLA
|
ATLANTA
|
$2,360,528
|
US 59
|
STP 2024(670)HES
|
02/01/2024
|
12/21/2023
|
HAZARD ELIM & SAFETY
|
H. V. CAVER, INC.
($1,105,559)
|
|
|
6462-30-001
|
PECOS
|
ODESSA
|
$520,000
|
IH0010
|
MMC - 646230001
|
02/01/2024
|
12/21/2023
|
HOT MIX
|
A. L. HELMCAMP, INC.
($518,500)
|
|
|
0090-05-108
|
POTTER
|
AMARILLO
|
$8,578,402
|
IH 40
|
BR 2024(730)
|
02/01/2024
|
12/21/2023
|
BRIDGE REPL
|
GILVIN-TERRILL, LTD.
($9,782,901)
|
|
|
6462-58-001
|
POTTER
|
AMARILLO
|
$6,491,250
|
IH0040
|
RMC - 646258001
|
02/02/2024
|
12/25/2023
|
TOTAL MAINT
|
J. LEE MILLIGAN, INC.
($6,977,100)
|
|
|
0168-09-083
|
RANDALL
|
AMARILLO
|
$235,609,131
|
IH 27
|
F 2024(864)
|
02/01/2024
|
12/21/2023
|
CONSTRUCT NEW ROAD
|
WEBBER, LLC
($312,507,981)
|
|
|
0046-01-070
|
RED RIVER
|
PARIS
|
$603,306
|
BU 82-J
|
BR 2024(726)
|
02/02/2024
|
12/22/2023
|
BRIDGE MAINT
|
AAD CONTRACTING INC.
($627,372)
|
|
|
0540-02-027
|
ROBERTSON
|
BRYAN
|
$1,878,353
|
FM 46
|
BR 2024(732)
|
02/02/2024
|
12/22/2023
|
BRIDGE REPL
|
KNIFE RIVER CORPORATION - SOUTH
($1,750,130)
|
|
|
0206-06-032
|
RUSK
|
TYLER
|
$6,651,780
|
US 79
|
F 2024(763)
|
02/01/2024
|
12/21/2023
|
PVMNT REPAIR, PLANING, OCST, PFC SUR...
|
REYNOLDS & KAY, LTD.
($4,925,093)
|
|
|
6451-35-001
|
SAN JACINTO
|
LUFKIN
|
$304,241
|
US0059
|
RMC - 645135001
|
02/02/2024
|
12/22/2023
|
SAN JACINTO - MOW HWY RIGHT OF WAY
|
ROY LEE WALKER
($183,650)
|
|
|
6463-95-001
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$296,500
|
US0181
|
MMC - 646395001
|
02/20/2024
|
01/26/2024
|
HYDRAULIC CEMENT
|
AKA-MATERIALS
($293,790)
|
|
|
6392-01-001
|
SCURRY
|
ABILENE
|
$1,538,188
|
US0084
|
RMC - 639201001
|
02/02/2024
|
12/01/2023
|
MILL AND INLAY
|
RK HALL, LLC
($1,567,467)
|
|
|
6457-15-001
|
SCURRY
|
ABILENE
|
$274,252
|
US0084
|
RMC - 645715001
|
02/20/2024
|
11/21/2023
|
MOW HWY RIGHT OF WAY
|
ABESCAPE LANDSCAPING, LLC
($256,481)
|
|
|
6457-17-001
|
SHACKELFORD
|
ABILENE
|
$174,976
|
US0180
|
RMC - 645717001
|
02/20/2024
|
11/21/2023
|
MOW HWY RIGHT OF WAY
|
TRIPLE T MAINTENANCE INC.
($150,396)
|
|
|
6452-61-001
|
SHELBY
|
LUFKIN
|
$352,819
|
US0059
|
RMC - 645261001
|
02/01/2024
|
12/21/2023
|
MOW HWY RIGHT OF WAY - SHELBY COUNTY
|
SERVIN MOWING
($239,608)
|
|
|
0495-04-081
|
SMITH
|
TYLER
|
$12,538,227
|
IH 20
|
F 2024(722)
|
02/02/2024
|
12/22/2023
|
RESURF ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($13,106,221)
|
|
|
6459-45-001
|
SMITH
|
TYLER
|
$84,010
|
SH0031
|
RMC - 645945001
|
02/20/2024
|
01/19/2024
|
CULVERT REPAIR
|
RISE UP CONSTRUCTION LLC
($83,902)
|
|
|
6458-99-001
|
STONEWALL
|
ABILENE
|
$143,214
|
US0380
|
RMC - 645899001
|
02/20/2024
|
11/22/2023
|
MOW HWY RIGHT OF WAY
|
KENNETH THOMASON
($128,826)
|
|
|
6449-15-001
|
TARRANT
|
FORT WORTH
|
$1,754,513
|
IH0020
|
BPM - 644915001
|
02/01/2024
|
12/28/2023
|
BRIDGE JOINT REPAIR
|
12TWELVE ROAD AND BRIDGE LLC
($1,669,965)
|
|
|
6432-54-001
|
TAYLOR
|
ABILENE
|
$215,500
|
FM0089
|
RMC - 643254001
|
02/20/2024
|
11/22/2023
|
MOW HWY RIGHT OF WAY
|
ABESCAPE LANDSCAPING, LLC
($204,000)
|
|
|
6411-71-001
|
TOM GREEN
|
SAN ANGELO
|
$298,120
|
US0067
|
RMC - 641171001
|
02/27/2024
|
01/24/2024
|
PAVMT MRK
|
PAVEMENT MARKINGS INC.
($199,560)
|
|
|
6420-67-001
|
TOM GREEN
|
SAN ANGELO
|
$901,748
|
US0067
|
RMC - 642067001
|
02/01/2024
|
12/05/2023
|
REFLECTORIZED PAVMT MRK & MARKERS
|
L&L COMPANY
($345,145)
|
|
|
0114-20-014
|
TRAVIS
|
AUSTIN
|
$907,083
|
SL 212
|
C 114-20-14
|
02/02/2024
|
12/22/2023
|
PREVENT MAINT
|
TEXAS MATERIALS GROUP, INC.
($799,754)
|
|
|
0914-00-504
|
TRAVIS
|
AUSTIN
|
$2,865,191
|
VA
|
C 914-00-504
|
02/01/2024
|
12/21/2023
|
INSTL TRAF SIGNAL
|
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
($2,626,391)
|
|
|
0914-00-512
|
TRAVIS
|
AUSTIN
|
$4,438,553
|
VA
|
C 914-00-512
|
02/01/2024
|
12/21/2023
|
HWY IMPRV
|
TEXAS MATERIALS GROUP, INC.
($7,676,625)
|
|
|
0914-00-524
|
TRAVIS
|
AUSTIN
|
$1,542,062
|
VA
|
F 2024(758)
|
02/02/2024
|
12/22/2023
|
REPAIR ROADWAY
|
ROY JORGENSEN ASSOCIATES, INC.
($1,284,795)
|
|
|
0914-00-525
|
TRAVIS
|
AUSTIN
|
$2,018,995
|
VA
|
F 2024(759)
|
02/01/2024
|
12/21/2023
|
REPLACE GUARDRAIL
|
HAZMAT INTERNATIONAL, INC.
($1,649,750)
|
|
|
6449-35-001
|
TRAVIS
|
AUSTIN
|
$1,042,846
|
IH0035
|
RMC - 644935001
|
02/01/2024
|
12/27/2023
|
REPAIR/REPLACE TRAF DATA SENSORS
|
LIGHT IT UP ELECTRIC
($1,189,692)
|
|
|
6462-83-001
|
TRINITY
|
LUFKIN
|
$174,825
|
FM0357
|
RMC - 646283001
|
02/28/2024
|
02/05/2024
|
TREE TRIM AND BRUSH RMVL
|
FLORES TREE SERVICE LLC
($168,000)
|
|
|
6447-95-001
|
VICTORIA
|
YOAKUM
|
$369,470
|
US0077
|
BPM - 644795001
|
02/02/2024
|
12/22/2023
|
BRIDGE PREVENT MAINT
|
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC
($323,761)
|
|
|
0213-01-048
|
WALKER
|
BRYAN
|
$1,118,922
|
US 190
|
C 213-1-48
|
02/02/2024
|
12/22/2023
|
INTERS IMPRVS WITH LEFT TURN LANE
|
KNIFE RIVER CORPORATION - SOUTH
($1,036,981)
|
|
|
0018-05-090
|
WEBB
|
LAREDO
|
$3,966,686
|
IH 35
|
C 18-5-90
|
02/01/2024
|
12/21/2023
|
REHAB EXIST ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($3,289,937)
|
|
|
6463-11-001
|
WEBB
|
LAREDO
|
$296,919
|
IH0035
|
RMC - 646311001
|
02/27/2024
|
01/31/2024
|
MOW HWY RIGHT OF WAY
|
R&M INCORPORATED
($356,335)
|
|
|
6461-01-001
|
WHARTON
|
YOAKUM
|
$365,400
|
US0059
|
MMC - 646101001
|
02/01/2024
|
12/21/2023
|
AGGREGATE
|
BRAUNTEX MATERIALS, INC.
($353,100)
|
|
|
6461-08-001
|
WHARTON
|
YOAKUM
|
$450,000
|
US0059
|
MMC - 646108001
|
02/02/2024
|
12/22/2023
|
HOT MIX
|
QUALITY HOT MIX, INC.
($440,000)
|
|
|
6461-12-001
|
WHARTON
|
YOAKUM
|
$390,500
|
US0059
|
MMC - 646112001
|
02/01/2024
|
12/21/2023
|
EMULSION
|
MARTIN RESOURCE MANAGEMENT CORPORATION
($390,995)
|
|
|
6461-14-001
|
WHARTON
|
YOAKUM
|
$444,900
|
US0059
|
MMC - 646114001
|
02/02/2024
|
12/22/2023
|
LIMESTONE ROCK ASPH
|
MARTIN MARIETTA MATERIALS, INC.
($429,750)
|
|
|
0156-04-120
|
WICHITA
|
WICHITA FALLS
|
$2,836,514
|
US 82
|
BR 2024(686)
|
02/02/2024
|
12/22/2023
|
REHAB BRIDGE
|
TALBERT COMPANIES LLC
($2,856,132)
|
|
|
0204-01-074
|
WILLIAMSON
|
AUSTIN
|
$4,943,516
|
US 79
|
STP 2024(756)HES
|
02/02/2024
|
12/22/2023
|
INSTL OF MEDIAN CABLE BARRIER
|
DAN WILLIAMS COMPANY
($3,597,980)
|
|
|
0204-02-036
|
WILLIAMSON
|
AUSTIN
|
$6,015,461
|
US 79
|
C 204-2-36
|
02/02/2024
|
12/22/2023
|
RESURF ROADWAY
|
LONE STAR PAVING COMPANY
($3,840,828)
|
|
|
0914-05-137
|
WILLIAMSON
|
AUSTIN
|
$152,627
|
CR
|
BR 2020(730)
|
02/01/2024
|
12/21/2023
|
BRIDGE REPL
|
ALBECO CONTRACTORS LLC
($125,524)
|
|
|
2103-01-044
|
WILLIAMSON
|
AUSTIN
|
$1,913,692
|
RM 2243
|
C 2103-1-44
|
02/02/2024
|
12/22/2023
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($1,696,964)
|
|
|
2295-01-019
|
WILLIAMSON
|
AUSTIN
|
$1,028,549
|
FM 973
|
C 2295-1-19
|
02/01/2024
|
12/21/2023
|
RESURF ROADWAY
|
LONE STAR PAVING COMPANY
($885,043)
|
|
|
6388-99-001
|
WISE
|
FORT WORTH
|
$155,637
|
SH0114
|
BPM - 638899001
|
02/23/2024
|
01/05/2024
|
BRIDGE PREVENT MAINT
|
SCOUT 5 CONSTRUCTION LLC
($136,896)
|
|
|
6451-69-001
|
WISE
|
FORT WORTH
|
$182,046
|
SH0114
|
BPM - 645169001
|
02/23/2024
|
01/08/2024
|
BRIDGE JOINT REPAIR
|
STRUCTURAL INTEGRITY GROUP LLC
($162,075)
|
|
|
6456-93-001
|
WOOD
|
TYLER
|
$5,233,466
|
US0080
|
RMC - 645693001
|
02/01/2024
|
12/21/2023
|
PAVMT MRK
|
STRIPING TECHNOLOGY, L.P.
($4,729,775)
|