EXCAVATION (ROADWAY)
|
CY
|
150.000
|
$55.000
|
$70.000
|
$100.000
|
$65.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
350.000
|
$50.000
|
$95.000
|
$50.000
|
$83.000
|
|
|
BACKFILL (TY B)
|
STA
|
1,411.620
|
$300.000
|
$175.000
|
$130.000
|
$265.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
5,716.000
|
$1.750
|
$0.500
|
$0.430
|
$0.550
|
|
|
VEGETATIVE WATERING
|
MG
|
2,000.400
|
$55.000
|
$45.000
|
$1.000
|
$1.000
|
|
|
WILDFLOWER SEEDING
|
AC
|
1.170
|
$2,500.000
|
$3,500.000
|
$3,000.000
|
$3,650.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")
|
SY
|
2,500.000
|
$160.000
|
$115.000
|
$160.000
|
$148.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
190,937.000
|
$5.000
|
$2.500
|
$2.250
|
$3.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,131.000
|
$700.000
|
$700.000
|
$530.000
|
$675.000
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
2,855.000
|
$45.000
|
$85.000
|
$25.000
|
$72.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
239.000
|
$700.000
|
$600.000
|
$700.000
|
$555.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,784,928.780
|
$1,500,000.000
|
$2,000,000.000
|
$1,789,817.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$20,000.000
|
$10,000.000
|
$50,000.000
|
$58,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
12,703.000
|
$5.000
|
$3.400
|
$1.000
|
$3.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
12,703.000
|
$2.000
|
$1.000
|
$0.500
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
160.000
|
$7.500
|
$6.000
|
$6.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
160.000
|
$2.500
|
$3.000
|
$3.000
|
$3.750
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,360.000
|
$80.000
|
$125.000
|
$75.000
|
$75.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
510.000
|
$25.000
|
$23.000
|
$30.000
|
$28.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,360.000
|
$25.000
|
$28.000
|
$30.000
|
$32.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
182,786.000
|
$0.500
|
$0.200
|
$0.200
|
$0.140
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
64,508.000
|
$2.000
|
$0.500
|
$0.500
|
$0.800
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
16,275.000
|
$25.000
|
$25.000
|
$22.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
68.000
|
$2,500.000
|
$2,100.000
|
$1,800.000
|
$2,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
38.000
|
$5,000.000
|
$1,275.000
|
$1,100.000
|
$1,250.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
15,800.000
|
$5.000
|
$3.500
|
$3.000
|
$3.300
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
22.000
|
$400.000
|
$145.000
|
$125.000
|
$140.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
15.000
|
$500.000
|
$145.000
|
$125.000
|
$140.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
68.000
|
$410.000
|
$275.000
|
$250.000
|
$280.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
57.000
|
$3,450.000
|
$3,325.000
|
$2,852.000
|
$3,275.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
57.000
|
$450.000
|
$275.000
|
$250.000
|
$280.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$7,000.000
|
$3,500.000
|
$2,000.000
|
$2,250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$5,500.000
|
$3,000.000
|
$1,500.000
|
$1,780.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$15,000.000
|
$20,000.000
|
$10,000.000
|
$11,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
96.000
|
$40.000
|
$20.000
|
$20.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
112.000
|
$40.000
|
$20.000
|
$20.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
252.000
|
$40.000
|
$38.000
|
$38.000
|
$42.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
172.000
|
$60.000
|
$38.000
|
$38.000
|
$42.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
38.000
|
$40.000
|
$20.000
|
$20.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
232.000
|
$100.000
|
$70.000
|
$70.000
|
$77.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
31.000
|
$10.000
|
$74.000
|
$74.000
|
$82.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
|
EA
|
37.000
|
$370.000
|
$400.000
|
$400.000
|
$450.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
|
EA
|
37.000
|
$500.000
|
$400.000
|
$400.000
|
$450.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
35,417.000
|
$0.500
|
$0.450
|
$0.160
|
$0.470
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
155,339.000
|
$0.500
|
$0.300
|
$0.160
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
142,699.000
|
$0.500
|
$0.300
|
$0.160
|
$0.310
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
8,855.000
|
$3.000
|
$1.000
|
$1.000
|
$1.450
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
652.000
|
$3.000
|
$1.500
|
$1.000
|
$1.580
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
15,998.000
|
$2.000
|
$1.000
|
$1.100
|
$1.060
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
5,979.000
|
$5.000
|
$4.350
|
$2.450
|
$4.600
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
12.000
|
$355.000
|
$175.000
|
$145.000
|
$184.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
9,691.000
|
$3.000
|
$0.750
|
$0.900
|
$0.790
|
|
|
PAVEMENT SEALER 6"
|
LF
|
95,047.000
|
$0.820
|
$0.250
|
$0.230
|
$0.270
|
|
|
PAVEMENT SEALER 8"
|
LF
|
8,875.000
|
$2.000
|
$0.450
|
$0.250
|
$0.480
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,924.000
|
$2.000
|
$1.000
|
$0.970
|
$1.050
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
4.000
|
$45.000
|
$65.000
|
$31.000
|
$68.550
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
35,392.000
|
$1.150
|
$0.650
|
$0.830
|
$0.690
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
142,705.000
|
$1.000
|
$0.600
|
$0.830
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
145,353.000
|
$1.000
|
$0.600
|
$0.830
|
$0.630
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
24.000
|
$15.000
|
$5.000
|
$4.000
|
$5.270
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,627.000
|
$10.000
|
$4.750
|
$4.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
95,047.000
|
$0.500
|
$0.170
|
$0.100
|
$0.180
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
8,875.000
|
$0.500
|
$0.350
|
$0.150
|
$0.370
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,924.000
|
$0.750
|
$0.950
|
$0.150
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
4.000
|
$20.000
|
$50.000
|
$9.000
|
$53.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
65,750.000
|
$5.000
|
$4.750
|
$5.600
|
$5.400
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
91,541.000
|
$5.000
|
$3.750
|
$3.750
|
$4.070
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-28
|
TON
|
70,112.000
|
$160.000
|
$172.500
|
$195.000
|
$188.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$2,500.000
|
$20,000.000
|
$10,000.000
|
$13,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
570.000
|
$200.000
|
$300.000
|
$1.000
|
$315.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
5,312.000
|
$40.000
|
$0.010
|
$1.000
|
$0.010
|
|
Totals: |
$19,894,216.620
|
$18,713,823.110
|
$20,492,039.520
|
$20,878,161.330
|