Job Info for 0924-06-700

County: EL PASO Highway: VA Date: 02/01/2024 (9 months ago) Engineer's Estimate: $413,160 Control Number: 0924-06-700
Project: C 924-6-700 District: EL PASO Time: 83 WORKING DAYS Type: PREVENTIVE MAINTENANCE
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $413,160.00
HJC FARMS, INC.   $458,260.00 1
10.92% | $45,100.00
DEL MAR CONTRACTING, INC.   $461,140.00 2
11.61% | $47,980.00
0.63% | $2,880.00
HAWK CONSTRUCTION   $474,606.00 3
14.87% | $61,446.00
3.57% | $16,346.00
2.92% | $13,466.00
3LW CIVIL LLC   $559,489.07 4
35.42% | $146,329.07
22.09% | $101,229.07
17.88% | $84,883.07
Subcontractor Percentage Amount
FC TRAFFIC CONTROL, INC. 2.76% $12,647.98
Total: 2.76% $12,647.98

Bid Items

Items: 20, 0 filtered
EL PASO VA  |  EL PASO  |  0924-06-700  |  02/01/2024  |  $413,160  |  C 924-6-700  |  PREVENT MAINT  |  83 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HJC FARMS, INC. DEL MAR CONTRACTING, INC. HAWK CONSTRUCTION 3LW CIVIL LLC
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 69.000 $615.000 $700.000 $400.000 $715.000 $900.000
500 6001 MOBILIZATION LS 1.000 $25,000.000 $100,000.000 $23,000.000 $65,000.000 $50,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $10,000.000 $2,000.000 $7,500.000 $7,600.000 $22,500.000
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 720.000 $5.000 $10.000 $4.000 $16.500 $7.040
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 720.000 $2.500 $2.000 $2.000 $7.500 $2.700
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 3,650.000 $35.000 $40.000 $48.000 $34.500 $40.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $3,500.000 $3,100.000 $3,700.000 $3,150.000 $2,338.200
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 9.000 $1,700.000 $1,475.000 $2,000.000 $2,100.000 $1,665.830
542 6001 REMOVE METAL BEAM GUARD FENCE LF 3,670.000 $5.000 $4.000 $4.000 $6.000 $10.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 10.000 $250.000 $400.000 $400.000 $375.000 $320.590
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 1.000 $300.000 $400.000 $400.000 $375.000 $238.650
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 10.000 $300.000 $400.000 $500.000 $375.000 $347.950
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 17.000 $3,500.000 $3,750.000 $4,300.000 $3,250.000 $3,425.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 17.000 $450.000 $400.000 $400.000 $375.000 $389.390
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 16.000 $25.000 $25.000 $36.000 $27.000 $61.550
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 16.000 $25.000 $25.000 $36.000 $27.000 $74.630
658 6060 REMOVE DELIN & OBJECT MARKER ASSMS EA 37.000 $25.000 $20.000 $24.000 $11.000 $34.970
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 143.000 $30.000 $45.000 $36.000 $25.000 $56.610
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 32.000 $30.000 $45.000 $36.000 $25.000 $70.870
6185 6002 TMA (STATIONARY) DAY 84.000 $250.000 $50.000 $400.000 $450.000 $308.020
Totals: $413,160.00 $458,260.00 $461,140.00 $474,606.00 $559,489.07