REMOVING CONC (DRIVEWAYS)
|
SY
|
678.000
|
$23.000
|
$35.000
|
$100.000
|
$136.020
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
141,451.000
|
$5.000
|
$9.200
|
$9.310
|
$5.710
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
86,677.000
|
$14.000
|
$16.500
|
$21.220
|
$23.410
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
31,837.000
|
$19.000
|
$20.500
|
$16.470
|
$32.990
|
|
|
BACKFILL (TY B)
|
STA
|
69.000
|
$300.000
|
$183.000
|
$250.000
|
$1,463.560
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
297,176.000
|
$0.290
|
$0.200
|
$0.210
|
$0.190
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
250,360.000
|
$20.000
|
$15.500
|
$17.030
|
$12.510
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
2,957.000
|
$300.000
|
$415.000
|
$521.820
|
$520.130
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
250,360.000
|
$4.150
|
$4.950
|
$5.590
|
$3.910
|
|
|
PRIME COAT (MC-30)
|
GAL
|
61,294.000
|
$4.800
|
$5.650
|
$6.360
|
$6.580
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
28,963.000
|
$4.090
|
$5.350
|
$5.600
|
$4.320
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
2,500.000
|
$10.000
|
$51.350
|
$45.000
|
$38.220
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,430.000
|
$4.560
|
$10.750
|
$12.370
|
$8.270
|
|
|
CEM STABIL BKFL
|
CY
|
211.000
|
$240.000
|
$413.000
|
$357.290
|
$356.950
|
|
|
CUT & RESTORING PAV
|
SY
|
2,589.000
|
$159.000
|
$93.450
|
$145.000
|
$71.390
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
207.000
|
$5.000
|
$25.000
|
$19.490
|
$19.470
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
6.000
|
$800.000
|
$1,315.000
|
$974.430
|
$973.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
25.000
|
$800.000
|
$1,060.000
|
$1,299.240
|
$1,005.950
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
72.000
|
$600.000
|
$220.000
|
$324.810
|
$324.500
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
93.000
|
$1,100.000
|
$1,155.000
|
$1,624.040
|
$1,622.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,475.000
|
$145.000
|
$123.500
|
$168.900
|
$168.740
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
240.000
|
$300.000
|
$320.000
|
$487.210
|
$486.750
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$16,000.000
|
$36,150.000
|
$37,677.830
|
$37,642.000
|
|
|
SET (TY I) (48 IN) (4: 1) (C)
|
EA
|
3.000
|
$9,180.000
|
$22,550.000
|
$12,992.360
|
$12,980.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
6.000
|
$14,300.000
|
$19,765.000
|
$16,890.060
|
$16,874.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,600.000
|
$3,920.000
|
$2,598.470
|
$2,596.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
88.000
|
$2,080.000
|
$3,675.000
|
$2,923.280
|
$2,920.500
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,200.000
|
$4,225.000
|
$6,496.180
|
$4,543.000
|
|
|
REMOV STR (SET)
|
EA
|
24.000
|
$2,150.000
|
$910.000
|
$649.620
|
$649.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,022.000
|
$60.000
|
$68.000
|
$15.590
|
$15.580
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
78.000
|
$162.000
|
$115.000
|
$129.920
|
$129.800
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,038,000.000
|
$4,100,000.000
|
$6,633,626.830
|
$4,884,061.400
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$30,000.000
|
$36,100.000
|
$106,863.280
|
$41,662.380
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
279.000
|
$30.000
|
$58.000
|
$310.570
|
$282.070
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
279.000
|
$14.650
|
$20.000
|
$18.310
|
$16.570
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,545.000
|
$3.950
|
$8.500
|
$12.240
|
$11.120
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,545.000
|
$2.760
|
$3.000
|
$1.750
|
$1.590
|
|
|
CONSTRUCTING DETOURS
|
SY
|
96,312.000
|
$72.000
|
$86.150
|
$110.000
|
$92.550
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
24.000
|
$50.000
|
$195.000
|
$600.000
|
$198.580
|
|
|
DRIVEWAYS (CONC)
|
SY
|
726.000
|
$125.000
|
$195.000
|
$368.830
|
$208.340
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,050.000
|
$63.000
|
$46.500
|
$125.000
|
$88.490
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
96,380.000
|
$0.200
|
$0.250
|
$0.210
|
$0.060
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
48,300.000
|
$0.210
|
$0.250
|
$0.210
|
$0.060
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,050.000
|
$33.290
|
$35.000
|
$42.550
|
$38.650
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
775.000
|
$3.220
|
$3.200
|
$3.900
|
$3.540
|
|
|
MTL BM GD FEN (REMOVE & REINSTALL)
|
LF
|
275.000
|
$46.000
|
$18.000
|
$22.090
|
$20.060
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,660.000
|
$3,540.000
|
$4,352.440
|
$3,953.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
2.000
|
$500.000
|
$2,115.000
|
$2,598.470
|
$2,360.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$322.000
|
$317.000
|
$389.770
|
$354.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
5.000
|
$300.000
|
$425.000
|
$389.770
|
$472.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$712.000
|
$845.000
|
$909.460
|
$944.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
14.000
|
$775.000
|
$950.000
|
$1,169.310
|
$1,062.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
10.000
|
$8,785.000
|
$1,200.000
|
$1,429.160
|
$1,268.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
18.000
|
$990.000
|
$1,135.000
|
$1,429.160
|
$1,268.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
4.000
|
$1,000.000
|
$1,190.000
|
$1,429.160
|
$1,327.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,000.000
|
$1,295.000
|
$1,948.850
|
$1,445.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$917.000
|
$1,460.000
|
$1,948.850
|
$1,628.400
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$1,430.000
|
$1,785.000
|
$1,948.850
|
$1,994.200
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
43.000
|
$405.000
|
$115.000
|
$103.940
|
$129.800
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
46.000
|
$5.000
|
$16.000
|
$24.000
|
$17.700
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND(BI)
|
EA
|
22.000
|
$70.000
|
$160.000
|
$129.920
|
$177.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
12.000
|
$132.000
|
$160.000
|
$129.920
|
$177.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
296,190.000
|
$0.340
|
$0.260
|
$0.320
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
300,090.000
|
$0.340
|
$0.260
|
$0.320
|
$0.300
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
416.000
|
$1.740
|
$1.700
|
$2.600
|
$3.460
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,834.000
|
$1.740
|
$1.750
|
$2.600
|
$3.460
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
255.000
|
$4.250
|
$1.050
|
$1.300
|
$1.180
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
430.000
|
$3.200
|
$1.400
|
$1.690
|
$1.530
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
170.000
|
$1.070
|
$0.800
|
$0.970
|
$0.890
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
106,834.000
|
$1.120
|
$0.700
|
$0.820
|
$0.740
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
12,430.000
|
$1.000
|
$0.700
|
$0.870
|
$0.790
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
20,580.000
|
$1.200
|
$0.700
|
$0.840
|
$0.770
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
629.000
|
$16.000
|
$12.700
|
$15.590
|
$14.160
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$250.000
|
$238.000
|
$292.330
|
$265.500
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$300.000
|
$345.000
|
$422.250
|
$383.500
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
5.000
|
$690.000
|
$685.000
|
$844.500
|
$767.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
32.000
|
$4.000
|
$10.600
|
$12.990
|
$11.800
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,067.000
|
$4.000
|
$5.300
|
$6.500
|
$5.900
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
129,687.000
|
$0.450
|
$0.600
|
$0.710
|
$0.650
|
|
|
SP MIXES SP-D SAC-A PG70-28
|
TON
|
54,239.000
|
$141.000
|
$146.000
|
$160.000
|
$174.520
|
|
|
TACK COAT
|
GAL
|
33,611.000
|
$5.500
|
$7.650
|
$7.830
|
$7.820
|
|
|
EMULSIFIED ASPHALT BASE (PT MX) 6"
|
SY
|
245,084.000
|
$36.000
|
$28.300
|
$41.440
|
$66.880
|
|
|
TMA (STATIONARY)
|
DAY
|
10.000
|
$430.000
|
$525.000
|
$1,000.000
|
$515.990
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$100.000
|
$100.000
|
$250.000
|
$117.540
|
|
Totals: |
$39,780,977.590
|
$41,097,397.100
|
$53,171,995.480
|
$53,788,762.800
|