Job Info for 0218-03-086

County: CASS Highway: US 59 Date: 02/02/2024 (9 months ago) Engineer's Estimate: $9,881,473 Control Number: 0218-03-086
Project: C 218-3-86 District: ATLANTA Time: 93 WORKING DAYS Type: SURFACING/ROADWAY RESTORATION
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $9,881,472.85
RK HALL, LLC   $9,573,840.81 1
-3.11% | -$307,632.04
EAST TEXAS BRIDGE, INC.   $10,201,214.66 2
3.24% | $319,741.81
6.55% | $627,373.85
LONGVIEW BRIDGE AND ROAD, LTD.   $10,954,147.31 3
10.86% | $1,072,674.46
14.42% | $1,380,306.50
7.38% | $752,932.65
Subcontractor Percentage Amount
TEXOP CONSTRUCTION 7.58% $725,697.13
SOUTHWEST ENVIRONMENT SERVICES LLC 2.12% $202,965.43
TRAFFIC HIGHWAY MAINTENANCE, LLC 1.93% $184,775.13
BAHENA CONSTRUCTION CO.,INC. 1.43% $136,905.92
WITHERS CONSTRUCTION, LLC 0.75% $71,803.81
PANOLA SIGN & BARRICADE, INC. 0.41% $39,252.75
DUSTIN ALLEN, INC. 0.41% $39,252.75
PROFESSIONAL TRAFFIC CONTROL LLC 0.08% $7,659.07
Total: 14.71% $1,408,311.99

Bid Items

Items: 69, 0 filtered
CASS US 59  |  ATLANTA  |  0218-03-086  |  02/02/2024  |  $9,881,473  |  C 218-3-86  |  SURF/ROADWAY RESTOR  |  93 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate RK HALL, LLC EAST TEXAS BRIDGE, INC. LONGVIEW BRIDGE AND ROAD, LTD.
100 6002 PREPARING ROW STA 43.000 $7,500.000 $3,450.000 $10,000.000 $20,000.000
104 6028 REMOVING CONC (MISC) SY 146.000 $85.000 $17.250 $30.000 $50.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 156.000 $50.000 $226.370 $100.000 $50.000
134 6003 BACKFILL (TY C) STA 275.400 $375.000 $924.840 $550.000 $820.000
150 6001 BLADING STA 9.000 $500.000 $214.250 $1,000.000 $200.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 176,228.000 $1.250 $0.630 $0.600 $0.650
164 6071 BROADCAST SEED (TEMP)(WARM OR COOL) SY 176,228.000 $0.450 $0.120 $0.120 $0.120
166 6002 FERTILIZER TON 5.280 $1,075.000 $575.000 $700.000 $2,640.000
168 6001 VEGETATIVE WATERING MG 2,821.000 $50.000 $39.900 $15.000 $25.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 6,599.000 $90.000 $80.100 $75.000 $110.000
354 6065 PLANE ASPH CONC PAV (3 1/2") SY 144,547.000 $4.000 $5.430 $6.000 $6.500
400 6007 CUT & RESTORE CONC PAVING SY 124.000 $230.000 $201.250 $800.000 $130.000
400 6008 CUT & RESTORE ASPH PAVING SY 57.000 $170.000 $172.500 $150.000 $120.000
432 6001 RIPRAP (CONC)(4 IN) CY 20.000 $960.000 $690.000 $600.000 $1,000.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 110.000 $235.000 $717.210 $300.000 $250.000
432 6039 BEDDING MATERIAL (6 IN) CY 36.000 $275.000 $460.000 $300.000 $300.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 42.000 $600.000 $747.500 $700.000 $1,000.000
464 6003 RC PIPE (CL III)(18 IN) LF 315.000 $95.000 $69.000 $75.000 $100.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 18.000 $1,760.000 $1,092.500 $900.000 $1,100.000
467 6580 SET (REMOV & REINSTALL) EA 18.000 $500.000 $575.000 $800.000 $500.000
496 6007 REMOV STR (PIPE) LF 375.000 $75.000 $17.250 $20.000 $40.000
500 6001 MOBILIZATION LS 1.000 $982,000.000 $287,215.220 $1,000,000.000 $1,100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $8,000.000 $35,605.150 $40,000.000 $20,000.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 28,340.000 $0.500 $0.100 $1.000 $0.400
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 637.500 $30.000 $31.910 $28.000 $30.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,650.000 $1,782.500 $2,100.000 $1,700.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 637.500 $4.500 $5.750 $6.000 $2.700
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 3.000 $250.000 $287.500 $600.000 $265.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 3.000 $3,200.000 $3,277.500 $3,600.000 $3,700.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 3.000 $370.000 $402.500 $600.000 $265.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 4.000 $780.000 $862.500 $800.000 $1,000.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 8.000 $900.000 $1,035.000 $900.000 $1,200.000
644 6012 IN SM RD SN SUP&AM TY10BWG(1)SB(T) EA 4.000 $950.000 $1,035.000 $900.000 $1,000.000
644 6017 IN SM RD SN SUP&AM TY10BWG(2)SA(P) EA 1.000 $1,300.000 $1,725.000 $1,600.000 $2,000.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 31.000 $1,000.000 $1,092.500 $1,100.000 $1,400.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 7.000 $1,100.000 $1,150.000 $1,200.000 $1,400.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 59.000 $650.000 $632.500 $500.000 $550.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 6.000 $680.000 $862.500 $600.000 $600.000
644 6076 REMOVE SM RD SN SUP&AM EA 94.000 $145.000 $92.000 $150.000 $130.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 15.000 $40.000 $57.500 $75.000 $60.000
658 6086 INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND EA 30.000 $100.000 $115.000 $180.000 $165.000
658 6094 INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF EA 24.000 $110.000 $115.000 $180.000 $135.000
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 57,830.000 $0.500 $0.400 $0.450 $0.550
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 40,610.000 $0.500 $0.400 $0.450 $0.550
662 6064 WK ZN PAV MRK REMOV (W)6"(BRK) LF 770.000 $1.000 $2.300 $3.300 $4.000
662 6096 WK ZN PAV MRK REMOV (Y)6"(BRK) LF 7,390.000 $4.000 $1.730 $2.000 $2.000
662 6098 WK ZN PAV MRK REMOV (Y)6"(SLD) LF 7,390.000 $1.000 $1.380 $2.000 $2.000
666 6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 120.000 $1.250 $2.300 $3.300 $4.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 2,220.000 $1.200 $1.300 $1.600 $2.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 1,160.000 $17.000 $17.250 $20.000 $20.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 11.000 $230.000 $287.500 $250.000 $278.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 14.000 $270.000 $402.500 $320.000 $370.000
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 270.000 $64.000 $74.750 $60.000 $73.000
668 6108 PREFAB PAV MRK TY C (Y) (24") (SLD) LF 510.000 $15.500 $17.250 $20.000 $20.000
672 6007 REFL PAV MRKR TY I-C EA 66.000 $4.750 $8.050 $6.000 $6.600
672 6009 REFL PAV MRKR TY II-A-A EA 263.000 $5.500 $7.190 $6.000 $6.600
672 6010 REFL PAV MRKR TY II-C-R EA 389.000 $5.500 $6.500 $6.000 $6.600
3077 6064 SP MIXES SP-D PG76-22 TON 22,045.000 $150.000 $184.160 $175.000 $170.000
3077 6075 TACK COAT GAL 20,289.000 $7.000 $6.420 $5.000 $7.000
3080 6007 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 TON 9,418.000 $275.000 $225.660 $215.000 $218.000
3080 6029 TACK COAT GAL 8,803.000 $7.000 $6.480 $5.000 $7.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 3.000 $15,800.000 $13,611.640 $30,000.000 $24,000.000
6056 6001 PREFORMED IN-LANE(TRANS) RUMBLE STRIP LF 200.000 $11.000 $23.000 $20.000 $20.000
6149 6004 REFL PAV MRK AWT (W) 6" (SLD) (100MIL) LF 31,650.000 $1.000 $0.980 $1.100 $1.320
6149 6005 REFL PAV MRK AWT (W) 6" (BRK) (100MIL) LF 7,540.000 $1.000 $1.040 $1.100 $1.320
6149 6010 REFL PAV MRK AWT (Y) 6" (SLD) (100MIL) LF 32,645.000 $1.000 $0.980 $1.100 $1.320
6149 6011 REFL PAV MRK AWT (Y) 6" (BRK) (100MIL) LF 1,290.000 $1.000 $1.040 $1.100 $1.320
6185 6002 TMA (STATIONARY) DAY 83.000 $285.000 $509.400 $300.000 $330.000
6185 6005 TMA (MOBILE OPERATION) DAY 10.000 $325.000 $938.420 $300.000 $330.000
Totals: $9,881,472.85 $9,573,840.83 $10,201,214.66 $10,954,147.31