Job Info for 0046-01-070

County: RED RIVER Highway: BU 82-J Date: 02/02/2024 (9 months ago) Engineer's Estimate: $603,306 Control Number: 0046-01-070
Project: BR 2024(726) District: PARIS Time: 74 WORKING DAYS Type: BRIDGE MAINTENANCE
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $603,306.30
AAD CONTRACTING INC.   $627,372.00 1
3.99% | $24,065.70
GARRET SHIELDS INFRASTRUCTURE   $644,635.00 2
6.85% | $41,328.70
2.75% | $17,263.00
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC   $674,980.70 3
11.88% | $71,674.40
7.59% | $47,608.70
4.71% | $30,345.70
DCC CONSTRUCTION AND SERVICES, L.L.C.   $692,718.00 4
14.82% | $89,411.70
10.42% | $65,346.00
2.63% | $17,737.30
HIGHWAY 19 CONSTRUCTION LLC   $699,506.50 5
15.95% | $96,200.20
11.5% | $72,134.50
0.98% | $6,788.50
SCR CIVIL CONSTRUCTION, LLC   $858,048.50 6
42.22% | $254,742.20
36.77% | $230,676.50
22.66% | $158,542.00
EAST TEXAS BRIDGE, INC.   $999,677.00 7
65.7% | $396,370.70
59.34% | $372,305.00
16.51% | $141,628.50
FNH CONSTRUCTION, LLC   $1,257,802.00 8
108.48% | $654,495.70
100.49% | $630,430.00
25.82% | $258,125.00
Subcontractor Percentage Amount
RICHARD DRAKE CONSTRUCTION COMPANY, L.P. 12.28% $77,041.28
DALLAS LITE AND BARRICADE, INC. 3.16% $19,824.96
STRAIGHT LINE SAWING & SEALING, INC. 3.03% $19,009.37
TEXOP CONSTRUCTION 2.47% $15,496.09
SKIDABRADER GROUP LLC 1.19% $7,465.73
Total: 22.13% $138,837.43

Bid Items

Items: 25, 0 filtered
RED RIVER BU 82-J  |  PARIS  |  0046-01-070  |  02/02/2024  |  $603,306  |  BR 2024(726)  |  BRIDGE MAINT  |  74 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate AAD CONTRACTING INC. GARRET SHIELDS INFRASTRUCTURE BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC DCC CONSTRUCTION AND SERVICES, L.L.C. HIGHWAY 19 CONSTRUCTION LLC SCR CIVIL CONSTRUCTION, LLC EAST TEXAS BRIDGE, INC. FNH CONSTRUCTION, LLC
354 6030 PLANE ASPH CONC PAV(0" TO 8") SY 3,696.000 $5.000 $10.000 $10.000 $10.000 $8.000 $8.500 $11.000 $13.000 $20.000
400 6005 CEM STABIL BKFL CY 10.000 $250.000 $250.000 $200.000 $350.000 $400.000 $275.000 $1,615.000 $600.000 $350.000
401 6001 FLOWABLE BACKFILL CY 3.000 $300.000 $250.000 $600.000 $650.000 $1,000.000 $395.000 $1,615.000 $600.000 $350.000
420 6011 CL B CONC (FLUME) CY 2.000 $638.000 $1,000.000 $1,000.000 $1,200.000 $1,000.000 $650.000 $5,100.000 $2,500.000 $1,000.000
429 6002 CONC STR REPAIR (EPOXY MORTAR) SF 4.000 $2,500.000 $175.000 $200.000 $400.000 $3,000.000 $525.000 $550.000 $500.000 $500.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 658.000 $300.000 $200.000 $250.000 $250.000 $175.000 $265.000 $257.000 $350.000 $300.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 132.000 $200.000 $200.000 $230.000 $300.000 $175.000 $180.000 $385.000 $250.000 $185.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 300.000 $200.000 $250.000 $230.000 $300.000 $200.000 $220.000 $235.000 $250.000 $250.000
438 6002 CLEANING AND SEALING EXIST JOINTS(CL3) LF 880.000 $65.000 $30.000 $60.000 $55.000 $75.000 $55.000 $40.000 $65.000 $100.000
438 6008 CLEANING AND SEALING JOINTS (CL 7) LF 243.000 $65.000 $85.000 $60.000 $45.000 $35.000 $85.000 $60.000 $70.000 $100.000
483 6013 SHOT BLASTING SY 429.000 $6.000 $20.000 $20.000 $10.000 $10.000 $18.500 $8.600 $82.000 $150.000
500 6001 MOBILIZATION LS 1.000 $52,573.300 $135,000.000 $60,000.000 $70,000.000 $50,000.000 $63,000.000 $85,800.000 $85,000.000 $120,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $5,000.000 $10,000.000 $5,000.000 $3,500.000 $3,000.000 $4,500.000 $9,800.000 $12,500.000 $10,000.000
662 6110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 87.000 $2.000 $3.000 $5.000 $0.100 $1.000 $1.500 $6.000 $6.000 $2.000
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 1,584.000 $4.000 $1.500 $5.000 $3.000 $5.000 $5.000 $3.150 $6.000 $1.000
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 200.000 $4.000 $1.500 $5.000 $3.000 $5.000 $5.000 $3.150 $6.000 $1.000
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 550.000 $4.000 $1.500 $5.000 $3.000 $5.000 $5.000 $3.150 $6.000 $1.000
672 6009 REFL PAV MRKR TY II-A-A EA 20.000 $10.000 $5.000 $5.000 $8.000 $10.000 $10.000 $5.750 $12.000 $5.000
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 5.000 $550.000 $150.000 $200.000 $150.000 $75.000 $85.000 $200.000 $600.000 $100.000
3076 6003 D-GR HMA TY-B PG64-22 (EXEMPT) TON 359.000 $160.000 $220.000 $180.000 $255.000 $200.000 $275.000 $245.000 $300.000 $200.000
3084 6001 BONDING COURSE GAL 163.000 $11.000 $15.000 $10.000 $15.000 $10.000 $4.500 $15.000 $25.000 $8.000
4106 6007 POLYESTER POLYMER CONC OVERLAY (1") SY 429.000 $125.000 $10.000 $200.000 $140.000 $467.000 $250.000 $297.000 $400.000 $850.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 15.000 $26.000 $350.000 $100.000 $150.000 $300.000 $250.000 $200.000 $300.000 $150.000
6185 6002 TMA (STATIONARY) DAY 15.000 $300.000 $350.000 $300.000 $275.000 $300.000 $250.000 $700.000 $400.000 $250.000
7000 6002 REML & DISPL DRIFTWOOD & DEBRIS LS 1.000 $3,000.000 $10,000.000 $5,000.000 $15,000.000 $5,000.000 $7,500.000 $65,000.000 $30,000.000 $85,000.000
Totals: $603,306.30 $627,372.00 $644,635.00 $674,980.70 $692,718.00 $699,506.50 $858,048.50 $999,677.00 $1,257,802.00