Job Info for 0014-10-071

County: MCLENNAN Highway: BU 77-L Date: 02/01/2024 (9 months ago) Engineer's Estimate: $1,247,631 Control Number: 0014-10-071
Project: BR 2024(859) District: WACO Time: 30 WORKING DAYS Type: REMOVAL AND DISPOSAL OF BRIDGE
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,247,631.06
KNIFE RIVER CORPORATION - SOUTH   $1,121,180.80 1
-10.14% | -$126,450.26
JAMES CONSTRUCTION GROUP, LLC   $1,307,707.00 2
4.82% | $60,075.94
16.64% | $186,526.20
BIG CREEK CONSTRUCTION, LTD.   $1,531,936.75 3
22.79% | $284,305.69
36.64% | $410,755.95
17.15% | $224,229.75
FNH CONSTRUCTION, LLC   $1,941,568.00 4
55.62% | $693,936.94
73.17% | $820,387.20
26.74% | $409,631.25
Subcontractor Percentage Amount
CND CONTRACTING 29.43% $329,963.51
F & W ELECTRICAL CONTRACTORS, INC. 4.71% $52,807.62
MURRAY CONSTRUCTION 3.11% $34,868.72
WOLFE CONSTRUCTION GROUP, INCORPORATED 3.03% $33,971.78
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.90% $10,090.63
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.85% $9,530.04
WILKO INDUSTRIAL, L.L.C. 0.74% $8,296.74
Total: 42.77% $479,529.04

Bid Items

Items: 41, 0 filtered
MCLENNAN BU 77-L  |  WACO  |  0014-10-071  |  02/01/2024  |  $1,247,631  |  BR 2024(859)  |  RMVL AND DISPOSAL OF BRIDGE  |  30 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate KNIFE RIVER CORPORATION - SOUTH JAMES CONSTRUCTION GROUP, LLC BIG CREEK CONSTRUCTION, LTD. FNH CONSTRUCTION, LLC
104 6001 REMOVING CONC (PAV) SY 10,715.000 $17.500 $15.000 $15.000 $14.500 $20.000
104 6011 REMOVING CONC (MEDIANS) SY 1,027.000 $36.000 $22.000 $7.000 $12.000 $20.000
104 6027 REMOVING CONC (APPR SLAB) SY 348.000 $50.000 $25.000 $19.000 $60.000 $100.000
110 6001 EXCAVATION (ROADWAY) CY 21,514.000 $15.530 $14.000 $16.070 $23.000 $15.000
132 6007 EMBANKMENT (FINAL)(ORD COMP)(TY D) CY 3,343.000 $20.000 $5.000 $13.920 $20.000 $30.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 23,612.000 $1.000 $2.000 $0.320 $3.000 $8.000
162 6008 ROLL SODDING SY 2,633.000 $5.500 $6.500 $5.730 $6.000 $10.000
164 6007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY 20,979.000 $0.760 $0.200 $0.200 $0.250 $1.000
168 6001 VEGETATIVE WATERING MG 190.000 $15.000 $50.000 $31.170 $46.000 $50.000
479 6006 ADJUSTING INLET (CAP) EA 3.000 $2,650.000 $3,800.000 $8,325.570 $4,500.000 $2,500.000
496 6011 REMOV STR (BRIDGE 500 - 999 FT LENGTH) EA 2.000 $150,000.000 $130,000.000 $139,410.000 $175,000.000 $200,000.000
500 6001 MOBILIZATION LS 1.000 $78,191.640 $85,000.000 $131,551.700 $150,000.000 $175,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 2.000 $7,000.000 $3,000.000 $19,227.990 $10,000.000 $15,000.000
506 6035 SANDBAGS FOR EROSION CONTROL EA 3.000 $18.250 $100.000 $61.780 $10.000 $50.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,774.000 $4.000 $4.000 $4.260 $3.500 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,774.000 $2.500 $1.000 $1.140 $1.250 $2.000
512 6021 PORT CTB (DES SOURCE)(LOW PROF)(TY 1) LF 120.000 $12.000 $50.000 $28.530 $32.000 $40.000
512 6022 PORT CTB (DES SOURCE)(LOW PROF)(TY 2) LF 80.000 $13.900 $50.000 $42.800 $20.000 $40.000
512 6045 PORT CTB (STKPL)(LOW PROF)(TY 1) LF 120.000 $12.000 $50.000 $28.530 $32.000 $40.000
512 6046 PORT CTB (STKPL)(LOW PROF)(TY 2) LF 80.000 $12.330 $50.000 $42.800 $20.000 $40.000
529 6008 CONC CURB & GUTTER (TY II) LF 120.000 $45.000 $78.000 $57.740 $90.000 $65.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 555.000 $4.000 $7.500 $5.000 $6.000 $5.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 1.000 $172.210 $500.000 $1,000.000 $250.000 $1,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 1.000 $269.240 $500.000 $1,500.000 $350.000 $2,500.000
610 6009 REMOVE RD IL ASM (TRANS-BASE) EA 12.000 $525.000 $1,350.000 $920.000 $1,000.000 $2,500.000
618 6023 CONDT (PVC) (SCH 40) (2") LF 23.000 $13.500 $75.000 $65.000 $72.000 $50.000
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 88.000 $45.000 $95.000 $85.000 $95.000 $100.000
618 6064 CONDT (RM) (1") LF 30.000 $32.650 $35.000 $30.000 $35.000 $150.000
620 6007 ELEC CONDR (NO.8) BARE LF 156.000 $1.290 $5.500 $2.000 $2.500 $3.000
620 6008 ELEC CONDR (NO.8) INSULATED LF 312.000 $1.900 $6.750 $3.000 $3.500 $3.000
624 6001 GROUND BOX TY A (122311) EA 2.000 $900.000 $1,250.000 $1,100.000 $1,200.000 $1,500.000
628 6009 ELC SRV TY A 120/240 060(NS)SS(E)SP(O) EA 1.000 $7,300.000 $10,000.000 $8,500.000 $9,500.000 $9,500.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 2.000 $950.000 $1,025.000 $900.000 $1,000.000 $1,500.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 9.000 $525.000 $575.000 $390.000 $550.000 $1,500.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 4.000 $585.000 $625.000 $415.000 $600.000 $1,500.000
644 6076 REMOVE SM RD SN SUP&AM EA 24.000 $132.930 $110.000 $80.000 $110.000 $100.000
650 6204 REMOVE OVERHD SIGN SUP EA 2.000 $8,000.000 $6,000.000 $5,000.000 $5,500.000 $2,500.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 380.000 $10.000 $17.000 $16.930 $12.000 $20.000
5132 6001 LEAD CONTAINING COATING MANAGEMENT SF 120.000 $71.000 $100.000 $743.000 $100.000 $1,150.000
6185 6002 TMA (STATIONARY) DAY 14.000 $300.000 $250.000 $410.050 $200.000 $250.000
6368 6001 SOLAR POWERED LED SIGN EA 8.000 $5,500.000 $3,500.000 $4,350.000 $3,150.000 $12,500.000
Totals: $1,247,631.06 $1,121,180.80 $1,307,707.00 $1,531,936.75 $1,941,568.00