County: DALLAS Highway: IH 20 Date: 02/02/2024 (9 months ago) Engineer's Estimate: $15,579,409 Control Number: 2374-04-086
Project: C 2374-4-86 District: DALLAS Time: 306 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
Questions
HCS
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $15,579,409.17
FNH CONSTRUCTION, LLC   $20,092,842.80 1
28.97% | $4,513,433.63
FOUTSCO PAVING COMPANY, LLC   $21,343,137.63 2
37% | $5,763,728.46
6.22% | $1,250,294.83
AUSTIN BRIDGE & ROAD SERVICES, LP   $22,909,861.06 3
47.05% | $7,330,451.89
14.02% | $2,817,018.26
7.34% | $1,566,723.43
TEXAS MATERIALS GROUP, INC.   $23,082,423.94 4
48.16% | $7,503,014.77
14.88% | $2,989,581.14
0.75% | $172,562.88

Bid Items

Items: 76, 0 filtered
DALLAS IH 20  |  DALLAS  |  2374-04-086  |  02/02/2024  |  $15,579,409  |  C 2374-4-86  |  REHAB EXIST ROADWAY  |  306 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate FNH CONSTRUCTION, LLC FOUTSCO PAVING COMPANY, LLC AUSTIN BRIDGE & ROAD SERVICES, LP TEXAS MATERIALS GROUP, INC.
104 6009 REMOVING CONC (RIPRAP) SY 31.000 $35.000 $100.000 $150.000 $208.020 $26.000
104 6054 REMOVING CONCRETE(MOW STRIP) LF 1,738.000 $10.000 $20.000 $25.000 $11.620 $8.000
161 6017 COMPOST MANUF TOPSOIL (4") SY 5,156.000 $1.120 $8.000 $3.000 $2.000 $1.500
162 6002 BLOCK SODDING SY 5,156.000 $3.500 $8.000 $5.000 $7.750 $5.000
168 6001 VEGETATIVE WATERING MG 767.000 $5.000 $50.000 $1.000 $1.250 $30.000
351 6006 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") SY 1,503.000 $75.000 $100.000 $110.000 $150.000 $180.000
354 6020 PLANE ASPH CONC PAV(0" TO 1") SY 43,470.000 $1.750 $2.500 $1.000 $4.000 $2.650
354 6077 PLANE ASPH CONC PAV (0" TO 3/4") SY 1,079,732.000 $1.200 $2.000 $0.750 $2.300 $1.720
361 6004 FULL - DEPTH REPAIR CRCP (10") SY 200.000 $350.000 $185.000 $500.000 $551.750 $600.000
401 6001 FLOWABLE BACKFILL CY 16.000 $550.000 $350.000 $475.000 $1,088.280 $1,050.000
429 6001 CONC STR REPAIR(CLEAN & COAT WTH EPOXY) SF 63.000 $250.000 $200.000 $160.000 $156.000 $156.000
429 6004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) SF 384.000 $75.000 $200.000 $125.000 $120.000 $120.000
429 6006 CONC STR REPR(RAPID DECK REP(FULL DPT)) SF 73.000 $125.000 $250.000 $215.000 $210.000 $210.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 1,039.000 $180.000 $200.000 $190.000 $185.000 $185.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 5.000 $1,000.000 $850.000 $1,000.000 $1,046.600 $900.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 11.000 $800.000 $185.000 $1,000.000 $557.540 $350.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 401.000 $450.000 $500.000 $600.000 $817.020 $650.000
438 6002 CLEANING AND SEALING EXIST JOINTS(CL3) LF 10,082.000 $20.000 $30.000 $40.000 $9.000 $47.000
438 6011 CLEANING AND SEALING JOINTS (FOAM) LF 5,046.000 $40.000 $80.000 $75.000 $76.000 $70.000
446 6028 SPOT CLEAN & PAINT EXT STR(SPL PRT SYS) LS 1.000 $276,000.000 $120,000.000 $90,000.000 $59,340.000 $99,950.000
451 6024 RETROFIT RAIL (TY SSTR) LF 12,868.000 $125.000 $155.000 $155.000 $203.900 $200.000
480 6001 CLEAN EXIST CULVERTS EA 1.000 $2,000.000 $100,000.000 $75,000.000 $95,000.000 $8,500.000
496 6018 REMOVE STR (CONC) EA 1.000 $4,000.000 $8,500.000 $7,000.000 $6,500.000 $7,500.000
499 6001 ADJUST STL SHOES EA 3.000 $3,000.000 $10,000.000 $10,000.000 $8,500.000 $10,000.000
500 6001 MOBILIZATION LS 1.000 $1,352,309.900 $1,900,000.000 $2,000,000.000 $2,290,986.100 $875,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 16.000 $44,000.000 $10,000.000 $82,500.000 $55,000.000 $40,000.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 3,000.000 $2.500 $4.000 $1.000 $4.000 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 3,000.000 $0.750 $2.000 $1.000 $1.000 $1.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 3,000.000 $6.500 $18.000 $1.000 $6.000 $4.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,000.000 $1.500 $9.000 $1.000 $1.000 $1.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 3,840.000 $17.000 $85.000 $29.000 $50.000 $36.000
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 8,010.000 $10.000 $20.000 $29.000 $35.000 $36.000
512 6053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 3,840.000 $8.000 $20.000 $15.000 $5.610 $18.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 229,861.000 $0.200 $0.300 $0.180 $0.190 $0.170
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 5,325.000 $21.000 $26.500 $20.000 $22.000 $25.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 21.000 $2,500.000 $1,850.000 $1,800.000 $2,833.910 $3,000.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 22.000 $2,000.000 $1,850.000 $1,100.000 $1,100.000 $1,300.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 4,962.500 $2.500 $5.000 $2.500 $2.500 $2.500
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 22.000 $212.000 $500.000 $100.000 $100.000 $125.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 18.000 $245.000 $500.000 $250.000 $250.000 $300.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 28.000 $3,000.000 $3,250.000 $3,000.000 $2,875.000 $3,400.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 28.000 $270.000 $1,500.000 $250.000 $250.000 $300.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 26.000 $285.000 $5,000.000 $3,500.000 $1,101.360 $4,000.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $900.000 $2,500.000 $1,500.000 $1,101.360 $2,000.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000 $12,500.000 $30,000.000 $9,500.000 $14,000.000 $11,000.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 70.000 $17.000 $100.000 $20.000 $10.000 $20.000
658 6026 INSTL DEL ASSM (D-SY)SZ (BRF)CTB EA 70.000 $17.000 $100.000 $20.000 $10.000 $20.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 183.000 $26.000 $100.000 $25.000 $25.500 $25.500
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 105,470.000 $0.400 $0.850 $0.300 $0.220 $0.320
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 136,433.000 $0.400 $0.850 $0.300 $0.220 $0.300
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 135,983.000 $0.400 $0.850 $0.300 $0.220 $0.300
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 30,960.000 $1.200 $2.000 $1.000 $0.500 $0.850
666 6039 REFL PAV MRK TY I (W)12"(LNDP)(100MIL) LF 1,502.000 $3.000 $5.000 $2.400 $2.730 $2.400
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 1,418.000 $3.100 $5.000 $2.400 $2.730 $2.400
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 11.000 $150.000 $250.000 $140.000 $72.000 $140.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 11.000 $165.000 $250.000 $150.000 $85.000 $150.000
666 6081 REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) EA 24.000 $800.000 $1,000.000 $1,000.000 $965.000 $980.000
666 6084 REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) EA 20.000 $800.000 $1,650.000 $1,600.000 $1,580.000 $1,600.000
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 105,760.000 $0.700 $0.900 $0.600 $0.770 $0.580
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 136,433.000 $0.500 $0.900 $0.600 $0.770 $0.580
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 135,983.000 $0.500 $0.900 $0.600 $0.770 $0.580
672 6010 REFL PAV MRKR TY II-C-R EA 5,084.000 $4.000 $4.000 $4.000 $4.450 $4.000
721 6002 FIBER REINFORCED POLYMER PATCHING MATLS LB 1,750.000 $5.000 $25.000 $12.000 $7.400 $9.000
778 6001 CONCRETE RAIL REPAIR (IN-KIND) LF 33.000 $825.000 $2,000.000 $1,500.000 $1,400.000 $1,700.000
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 791.000 $120.000 $60.000 $45.000 $40.500 $45.000
780 6004 CONC CRCK REPR(DISCRETE)(ROUT AND SEAL) LF 1,910.000 $60.000 $60.000 $35.000 $34.500 $40.000
785 6004 BRIDGE JOINT REPAIR (ARMOR) LF 430.000 $170.000 $850.000 $600.000 $710.000 $750.000
785 6009 BRIDGE JOINT REPAIR (PARTIAL DEPTH) LF 3.000 $75.000 $2,000.000 $750.000 $750.000 $800.000
788 6002 CONCRETE BEAM REPAIR (CFRP) EA 1.000 $5,000.000 $25,000.000 $25,000.000 $21,500.000 $22,000.000
3082 6004 TBWC (MEMBRANE) GAL 245,678.000 $3.500 $4.000 $3.000 $3.850 $4.000
3082 6005 TBWC PG76-22 SAC-A TY C TON 46,930.000 $140.000 $160.000 $225.000 $200.000 $225.000
4002 6001 REPLACE ELASTOMERIC BEARING PADS EA 12.000 $6,500.000 $17,500.000 $12,000.000 $15,000.000 $18,000.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $10,000.000 $16,500.000 $40,000.000 $21,450.000 $20,000.000
6185 6002 TMA (STATIONARY) DAY 612.000 $225.000 $250.000 $1.000 $187.500 $1,800.000
6185 6005 TMA (MOBILE OPERATION) DAY 306.000 $200.000 $385.000 $1.000 $556.370 $300.000
7000 6002 REML & DISPL DRIFTWOOD & DEBRIS LS 1.000 $40,000.000 $80,000.000 $10,000.000 $15,000.000 $20,000.000
Totals: $15,579,409.17 $20,092,842.80 $21,343,137.63 $22,909,861.06 $23,082,423.94