Job Info for 0004-07-138

County: ECTOR Highway: IH 20 Date: 02/01/2024 (9 months ago) Engineer's Estimate: $18,273,514 Control Number: 0004-07-138
Project: C 4-7-138 District: ODESSA Time: 238 WORKING DAYS Type: ROADWAY REHABILITATION
Bidder's List
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Plans | Revision | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $18,273,514.07
JONES BROS. DIRT & PAVING CONTRACTORS, INC.   $24,827,053.38 1
35.86% | $6,553,539.31
RK HALL, LLC   $28,490,917.79 2
55.91% | $10,217,403.72
14.76% | $3,663,864.41
FNF CONSTRUCTION, INC.   $29,426,896.75 3
61.04% | $11,153,382.68
18.53% | $4,599,843.37
3.29% | $935,978.96
Subcontractor Percentage Amount
O. TREVINO CONSTRUCTION, LLC 14.79% $3,671,921.19
HJC FARMS, INC. 4.57% $1,134,596.34
TEX OP CONSTRUCTION, LP 2.69% $667,847.74
DOUBLE A CONTRACTING, L.P. 1.10% $273,097.59
CONTRACTORS SERVICE, LTD. 0.68% $168,823.96
R.E.B.D. TRUCKING LLC 0.00% $0.00
Total: 23.83% $5,916,286.82

Bid Items

Items: 77, 0 filtered
ECTOR IH 20  |  ODESSA  |  0004-07-138  |  02/01/2024  |  $18,273,514  |  C 4-7-138  |  ROADWAY REHAB  |  238 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate JONES BROS. DIRT & PAVING CONTRACTORS, INC. RK HALL, LLC FNF CONSTRUCTION, INC.
105 6005 REMOVING STAB BASE AND ASPH PAV (3") SY 4,018.000 $5.500 $28.300 $23.060 $18.000
105 6022 REMOVING STAB BASE AND ASPH PAV (13") SY 4,184.000 $17.000 $24.440 $17.130 $45.000
105 6033 REMOVING STB BASE AND ASPH PAV(10-14") SY 621.000 $15.000 $63.750 $51.640 $60.000
105 6058 REMOVING STAB BASE & ASPH PAV (10"-12") SY 386.000 $1.450 $75.100 $77.080 $56.000
110 6001 EXCAVATION (ROADWAY) CY 1,000.000 $16.500 $20.000 $30.500 $50.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 1,000.000 $50.000 $20.000 $49.490 $22.000
134 6002 BACKFILL (TY B) STA 483.000 $282.500 $1,036.000 $373.440 $180.000
150 6002 BLADING HR 20.000 $147.000 $450.000 $197.620 $180.000
216 6001 PROOF ROLLING HR 20.000 $101.000 $175.000 $174.780 $130.000
251 6079 REWORK BS MTL (TY D)(SURF)(ORD COMP) SY 85,448.000 $1.850 $1.500 $2.420 $3.000
310 6005 PRIME COAT (AE-P) GAL 16,362.000 $4.500 $7.140 $12.060 $9.000
315 6004 FOG SEAL (CSS-1H) GAL 2,330.000 $7.250 $13.620 $6.580 $4.000
351 6003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(7") SY 300.000 $90.000 $300.000 $194.160 $300.000
354 6020 PLANE ASPH CONC PAV(0" TO 1") SY 390.000 $20.000 $72.360 $59.420 $38.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 192.000 $3.000 $130.000 $102.940 $55.000
354 6064 PLANE ASPH CONC PAV (2 1/2") SY 81,810.000 $1.850 $10.190 $10.530 $7.000
354 6201 PLANE ASPH CONC PAV (7.5") SY 81,810.000 $6.000 $15.020 $11.170 $22.000
354 6224 PLANE ASPH CONC PAV (3" TO 13") SY 182.000 $15.000 $130.000 $119.550 $100.000
360 6072 CONCPVMT(CONT REIN)(FST TRK)(CL P)(13") SY 3,639.000 $155.000 $266.800 $268.200 $360.000
360 6080 CONC PVMT(CRCP)(TRANSITION SLAB) SY 414.000 $250.000 $241.500 $242.400 $410.000
432 6006 RIPRAP (CONC)(CL B) CY 2,019.000 $400.000 $1,500.000 $1,312.800 $1,005.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 411.000 $770.000 $839.500 $876.000 $1,220.000
454 6007 HEADER TYPE EXPANSION JOINT LF 1,040.000 $367.000 $184.000 $192.000 $400.000
500 6001 MOBILIZATION LS 1.000 $1,646,656.000 $1,400,000.000 $1,941,353.230 $3,150,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 $7,500.000 $50,000.000 $29,889.690 $140,400.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 2,840.000 $7.500 $17.000 $9.900 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,840.000 $1.550 $5.500 $4.320 $1.500
533 6001 RUMBLE STRIPS (SHOULDER) LF 61,157.000 $0.150 $0.210 $0.220 $0.250
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 12,386.000 $35.000 $39.100 $34.000 $47.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $3,000.000 $3,248.750 $3,390.000 $4,200.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,930.000 $2,328.750 $2,430.000 $3,000.000
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 4.000 $1,350.000 $1,351.250 $1,410.000 $1,700.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 11,260.000 $3.850 $4.600 $4.800 $6.000
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 4.000 $1,800.000 $460.000 $480.000 $550.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $3,850.000 $4,600.000 $4,800.000 $5,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 8.000 $390.000 $460.000 $480.000 $550.000
636 6007 REPLACE EXISTING ALUMINUM SIGNS(TY A) SF 142.000 $45.000 $35.650 $37.200 $45.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 47.000 $950.000 $1,092.500 $1,140.000 $1,435.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 17.000 $1,000.000 $1,224.750 $1,278.000 $1,610.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 3.000 $1,000.000 $1,265.000 $1,320.000 $1,660.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 52.000 $650.000 $1,437.500 $1,500.000 $1,890.000
644 6033 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 6.000 $1,000.000 $1,512.250 $1,578.000 $1,990.000
644 6076 REMOVE SM RD SN SUP&AM EA 135.000 $140.000 $180.000 $132.000 $165.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 110.000 $35.000 $48.300 $50.400 $60.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 80.000 $35.000 $48.300 $50.400 $60.000
658 6069 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR) EA 18.000 $35.000 $55.200 $57.600 $70.000
658 6070 INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR) EA 75.000 $35.000 $55.200 $57.600 $70.000
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 14,000.000 $0.350 $0.380 $0.400 $0.500
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 75,000.000 $0.350 $0.290 $0.300 $0.500
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 7,018.000 $1.450 $0.380 $0.400 $0.500
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 137,000.000 $0.450 $0.290 $0.300 $0.500
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 6,099.000 $1.120 $1.380 $1.440 $1.500
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 688.000 $5.000 $3.740 $3.900 $4.500
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 14,000.000 $1.050 $0.860 $0.900 $1.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 75,000.000 $0.920 $0.790 $0.830 $1.000
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 7,018.000 $0.780 $0.860 $0.900 $1.000
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 137,000.000 $0.800 $0.790 $0.830 $1.000
666 6350 REFL PAV MRK TY I (W)12"(DOT)(100MIL) LF 920.000 $3.120 $4.030 $4.200 $5.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 150.000 $18.500 $20.700 $21.600 $25.000
668 6087 PREFAB PAV MRK TY C (W) (EXIT GORE) EA 4.000 $850.000 $862.500 $900.000 $1,100.000
668 6089 PREFAB PAV MRK TY C (W) (RR XING) EA 1.000 $750.000 $690.000 $720.000 $900.000
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 24.000 $35.000 $34.500 $36.000 $45.000
672 6007 REFL PAV MRKR TY I-C EA 339.000 $5.050 $5.750 $6.000 $7.000
672 6009 REFL PAV MRKR TY II-A-A EA 387.000 $4.880 $5.750 $6.000 $7.000
672 6010 REFL PAV MRKR TY II-C-R EA 763.000 $4.650 $4.600 $4.800 $5.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 3,000.000 $1.750 $1.130 $1.180 $1.500
752 6002 BRUSH REMOVAL MI 0.500 $50,000.000 $280,000.000 $167,789.140 $50,000.000
3077 6007 SP MIXES SP-B SAC-B PG70-22 TON 45,217.000 $145.000 $155.000 $192.170 $170.000
3077 6075 TACK COAT GAL 16,362.000 $4.400 $5.270 $14.580 $10.000
3080 6021 STONE-MTRX-ASPH SMAR-F SAC-A TON 30,689.000 $165.000 $197.000 $273.540 $226.000
3084 6001 BONDING COURSE GAL 27,362.000 $4.820 $4.210 $8.450 $8.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 4.000 $15,000.000 $22,500.000 $31,300.770 $16,000.000
6072 6001 MODULAR GLARE SCREENS (FURN & INSTALL) LF 2,100.000 $36.000 $37.950 $39.600 $50.000
6072 6002 MODULAR GLARE SCREENS (REMOVE) LF 2,100.000 $10.000 $8.050 $8.400 $10.000
6158 6001 TMSP RADAR SPEED CONTROL MONITOR EA 2.000 $13,000.000 $9,375.000 $13,108.000 $10,000.000
6185 6002 TMA (STATIONARY) DAY 89.000 $175.000 $156.250 $445.440 $370.000
6185 6005 TMA (MOBILE OPERATION) DAY 42.000 $280.000 $1,062.500 $964.630 $1,000.000
Totals: $18,273,514.07 $24,827,053.38 $28,490,917.79 $29,426,896.75