0073-03-071
|
ATASCOSA
|
SAN ANTONIO
|
$1,177,535
|
US 281
|
STP 2026(701)VRU
|
06/03/2026
|
04/01/2026
|
HAZARD ELIM & SAFETY
|
E-Z BEL CONSTRUCTION, LLC
($1,035,228)
|
|
|
6481-15-001
|
ATASCOSA
|
SAN ANTONIO
|
$103,320
|
FM3175
|
BPM - A00214342
|
03/18/2026
|
09/01/2025
|
EROSION REPAIR
|
DIAMOND R CONTRACTING, LLC
($72,204)
|
|
|
6493-96-001
|
GUADALUPE
|
SAN ANTONIO
|
$48,908
|
FM2438
|
BPM - A00218464
|
03/18/2026
|
01/09/2026
|
EROSION REPAIR
|
BK FIELD OPERATIONS LLC
($48,346)
|
|
|
0074-05-104
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$2,366,695
|
IH 37
|
F 2025(281)
|
03/04/2026
|
01/09/2026
|
REHAB EXIST ROADWAY
|
ANDERSON COLUMBIA CO., INC.
($2,258,368)
|
|
|
0421-02-034
|
MEDINA
|
SAN ANTONIO
|
$1,990,896
|
SH 173
|
F 2026(464)
|
03/04/2026
|
01/09/2026
|
RESURF ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($1,524,647)
|
|
|
2883-01-004
|
MEDINA
|
SAN ANTONIO
|
$16,198,822
|
FM 2790
|
STP 2026(404)HES
|
03/04/2026
|
01/09/2026
|
REHAB EXIST ROADWAY
|
DEAN WORD COMPANY, LTD.
($11,778,114)
|
|
|
0101-04-130
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$1,908,595
|
US 181
|
BR 2026(158)
|
02/05/2026
|
12/01/2025
|
BRIDGE REPL
|
LISKA CONSTRUCTION COMPANY, INC.
($1,812,290)
|
|
|
0922-20-031
|
LA SALLE
|
LAREDO
|
$966,017
|
VARIOUS
|
C 922-20-31
|
01/07/2026
|
11/01/2025
|
STATE PARK IMPRVS
|
ACME BRIDGE COMPANY, INC.
($714,669)
|
|
|
6494-42-001
|
WILSON
|
SAN ANTONIO
|
$2,037,436
|
US0181
|
RMC - A00218600
|
01/06/2026
|
12/01/2025
|
BASE REPAIR WITH SEAL COAT AND/OR OV...
|
TEXAS MATERIALS GROUP, INC.
($1,893,846)
|
|
|
6491-45-001
|
WILSON
|
SAN ANTONIO
|
$85,284
|
FM0775
|
BPM - A00217857
|
12/17/2025
|
10/28/2025
|
BRIDGE SCOUR REPAIR
|
BK FIELD OPERATIONS LLC
($53,716)
|
|
|
0100-03-094
|
WILSON
|
SAN ANTONIO
|
$163,512
|
US 181
|
STP 2B25(170)HES
|
12/03/2025
|
10/01/2025
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($184,258)
|
|
|
1122-04-017
|
WILSON
|
SAN ANTONIO
|
$11,652,395
|
FM 1344
|
C 1122-4-17
|
12/02/2025
|
10/01/2025
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($9,689,291)
|
|
|
0613-01-072
|
BEXAR
|
SAN ANTONIO
|
$1,730,372
|
SH 16
|
STP 2026(121)HES
|
11/05/2025
|
09/01/2025
|
HAZARD ELIM & SAFETY
|
GRATIOT CONSTRUCTION, LTD.
($1,129,626)
|
|
|
1500-01-028
|
FRIO
|
SAN ANTONIO
|
$3,688,493
|
FM 1582
|
C 1500-1-28
|
09/05/2025
|
07/01/2025
|
RESURF ROADWAY
|
HUNTER INDUSTRIES, LTD.
($2,460,101)
|
|
|
0916-35-253
|
NUECES
|
CORPUS CHRISTI
|
$1,674,356
|
CR 18
|
BR 2B24(444)
|
09/04/2025
|
07/01/2025
|
BRIDGE REPL
|
PRESIDIO CONTRACTING, LLC
($1,410,757)
|
|
|
6483-27-001
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$1,888,980
|
IH0037
|
RMC - A00215070
|
09/04/2025
|
04/01/2025
|
REHAB OF EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,459,019)
|
|
|
6481-11-001
|
COMAL
|
SAN ANTONIO
|
$114,479
|
FM0306
|
BPM - A00214338
|
08/20/2025
|
06/27/2025
|
EROSION REPAIR
|
BK FIELD OPERATIONS LLC
($82,602)
|
|
|
6481-16-001
|
GUADALUPE
|
SAN ANTONIO
|
$103,346
|
US0090
|
BPM - A00214343
|
08/20/2025
|
06/20/2025
|
EROSION REPAIR
|
BK FIELD OPERATIONS LLC
($61,036)
|
|
|
6369-25-001
|
BEXAR
|
SAN ANTONIO
|
$251,787
|
FM1535
|
BPM - A00155357
|
01/16/2025
|
12/05/2024
|
BRIDGE PREVENT MAINT
|
DIAMOND R CONTRACTING, LLC
($218,588)
|
|
|
6462-36-001
|
MEDINA
|
SAN ANTONIO
|
$198,876
|
FM2200
|
BPM - A00206347
|
01/16/2025
|
01/05/2025
|
EROSION REPAIR
|
DIAMOND R CONTRACTING, LLC
($149,921)
|
|
|
6476-84-001
|
LIVE OAK
|
CORPUS CHRISTI
|
$537,422
|
US0059
|
BPM - A00212884
|
01/14/2025
|
01/05/2025
|
BRIDGE PREVENT MAINT
|
RHINO EQUITY, LLC
($456,790)
|
|
|
6477-65-001
|
KLEBERG
|
CORPUS CHRISTI
|
$960,596
|
FM1356
|
RMC - A00213086
|
01/14/2025
|
01/05/2025
|
FLEXIBLE PAVMT STRUCT REPAIR
|
ANDERSON COLUMBIA CO., INC.
($898,358)
|
|
|
0517-01-048
|
ATASCOSA
|
SAN ANTONIO
|
$2,547,613
|
SH 16
|
C 517-1-48
|
09/06/2024
|
07/26/2024
|
CONSTRUCT PEDESTRIAN INFRASTRUCT
|
E-Z BEL CONSTRUCTION, LLC
($2,484,607)
|
|
|
0073-02-084
|
BEXAR
|
SAN ANTONIO
|
$2,107,017
|
US 281
|
STP 2025(006)HES
|
09/05/2024
|
07/25/2024
|
HAZARD ELIM & SAFETY
|
LCR TOTAL TRANSPORT LLC
($1,732,940)
|
|
|
0375-03-017
|
MAVERICK
|
LAREDO
|
$2,174,751
|
SH 131
|
STP 2B24(153)HES
|
06/05/2024
|
04/24/2024
|
WIDEN SHLDRS, FL BS, SURF TREAT, SET...
|
J. CARROLL WEAVER, INC.
($1,757,674)
|
|
|
0073-13-012
|
ATASCOSA
|
SAN ANTONIO
|
$5,427,205
|
UA 281
|
BR 2024(971)
|
05/03/2024
|
03/22/2024
|
BRIDGE REPL
|
RELMCO, INC.
($4,880,363)
|
|
|
0915-14-050
|
WILSON
|
SAN ANTONIO
|
$743,922
|
CS
|
STP 2023(123)TAPS
|
05/02/2024
|
03/21/2024
|
CONSTRUCT PEDESTRIAN INFRASTRUCT
|
DIAMOND R CONTRACTING, LLC
($624,919)
|
|
|
2234-02-009
|
KARNES
|
CORPUS CHRISTI
|
$8,238,067
|
FM 2102
|
C 2234-2-9
|
05/02/2024
|
03/21/2024
|
WIDEN ROAD - ADD SHOULDERS
|
CK NEWBERRY, LLC
($8,073,873)
|
|
|
1133-02-030
|
GONZALES
|
YOAKUM
|
$5,736,832
|
FM 794
|
C 1133-2-30
|
04/05/2024
|
02/23/2024
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($4,879,726)
|
|
|
0017-15-028
|
FRIO
|
SAN ANTONIO
|
$2,330,443
|
BI 35-E
|
STP 2024(938)HES
|
04/04/2024
|
02/22/2024
|
HAZARD ELIM & SAFETY
|
E-Z BEL CONSTRUCTION, LLC
($2,106,851)
|
|
|
6447-53-001
|
BANDERA
|
SAN ANTONIO
|
$74,786
|
PR0037
|
BPM - 644753001
|
03/20/2024
|
02/21/2024
|
BRIDGE SCOUR REPAIR
|
GARRET SHIELDS INFRASTRUCTURE
($74,474)
|
|
|
6447-55-001
|
ATASCOSA
|
SAN ANTONIO
|
$98,243
|
SH0173
|
BPM - 644755001
|
03/20/2024
|
02/21/2024
|
EROSION REPAIR
|
DIAMOND R CONTRACTING, LLC
($75,001)
|
|
|
0073-02-082
|
BEXAR
|
SAN ANTONIO
|
$3,185,771
|
US 281
|
STP 2024(783)HES
|
03/05/2024
|
01/23/2024
|
HAZARD ELIM & SAFETY
|
ELECNOR BELCO ELECTRIC, INC.
($2,399,238)
|
|
|
0915-14-045
|
WILSON
|
SAN ANTONIO
|
$522,802
|
CR
|
BR 2022(415)
|
03/07/2023
|
08/21/2024
|
BRIDGE REPL
|
DELGADO'S CONTRACTORS, LLC
($557,522)
|
|
|
0916-28-071
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$2,407,786
|
PR 25A
|
C 916-28-71
|
03/07/2023
|
08/21/2024
|
STATE PARK IMPRVS
|
J. CARROLL WEAVER, INC.
($2,440,689)
|
|
|
0573-01-041
|
BASTROP
|
AUSTIN
|
$2,836,280
|
SH 304
|
C 573-1-41
|
02/02/2023
|
11/15/2023
|
WIDEN ROAD - ADD SHOULDERS
|
HUNTER INDUSTRIES, LTD.
($2,515,581)
|
|
|
1167-01-011
|
UVALDE
|
SAN ANTONIO
|
$1,102,680
|
FM 1052
|
C 1167-1-11
|
02/02/2023
|
11/15/2023
|
RESURF ROADWAY
|
LONE STAR PAVING COMPANY
($1,021,333)
|
|
|
1553-02-008
|
LIVE OAK
|
CORPUS CHRISTI
|
$8,491,912
|
FM 1545
|
C 1553-2-8
|
02/01/2023
|
11/15/2023
|
REHAB EXIST ROADWAY
|
CK NEWBERRY, LLC
($7,861,814)
|
|
|
6431-87-001
|
LIVE OAK
|
CORPUS CHRISTI
|
$299,785
|
SH0072
|
RMC - 643187001
|
01/24/2023
|
11/15/2023
|
DRAINAGE IMPRV AND/OR REPAIRS
|
3LW CIVIL LLC
($276,347)
|
|
|
6416-47-001
|
GONZALES
|
YOAKUM
|
$2,965,921
|
IH0010
|
RMC - 641647001
|
01/06/2023
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($3,081,398)
|
|
|
6428-74-001
|
GONZALES
|
YOAKUM
|
$987,500
|
UA0090
|
RMC - 642874001
|
01/06/2023
|
11/15/2023
|
SPOT BASE REPAIR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($985,800)
|
|
|
6397-05-001
|
ATASCOSA
|
SAN ANTONIO
|
$124,020
|
IH0037
|
RMC - 639705001
|
12/14/2022
|
11/15/2023
|
EROSION REPAIR
|
GARRET SHIELDS INFRASTRUCTURE
($122,870)
|
|
|
0691-01-044
|
KARNES
|
CORPUS CHRISTI
|
$5,066,217
|
FM 81
|
F 2023(101)
|
09/07/2022
|
11/15/2023
|
REHAB EXIST ROADWAY
|
RELMCO, INC.
($4,887,026)
|
|
|
1741-02-036
|
BEXAR
|
SAN ANTONIO
|
$8,152,269
|
FM 2790
|
F 2023(120)
|
09/07/2022
|
11/15/2023
|
REHAB EXIST ROADWAY
|
CAPITAL EXCAVATION COMPANY
($7,692,727)
|
|
|
0017-13-012
|
ATASCOSA
|
SAN ANTONIO
|
$5,479,624
|
SH 132
|
F 2022(688)
|
06/30/2022
|
11/15/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($6,628,642)
|
|
|
0372-03-010
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$500,311
|
BU 77-T
|
F 2022(783)
|
06/01/2022
|
09/03/2024
|
INTERS IMPRV
|
CK NEWBERRY, LLC
($777,279)
|
|
|
6386-19-001
|
ATASCOSA
|
SAN ANTONIO
|
$405,258
|
IH0037
|
RMC - 638619001
|
06/01/2022
|
09/03/2024
|
SLOPE REPAIR
|
RELMCO, INC.
($361,140)
|
|
|
0915-18-033
|
FRIO
|
SAN ANTONIO
|
$512,793
|
CR
|
BR 2021(141)
|
02/03/2022
|
11/15/2023
|
BRIDGE REPL
|
DELGADO'S CONTRACTORS, LLC
($525,525)
|
|
|
6385-69-001
|
NUECES
|
CORPUS CHRISTI
|
$292,559
|
FM0070
|
RMC - 638569001
|
12/14/2021
|
11/15/2023
|
DRAINAGE IMPRV AND/OR REPAIRS
|
CK NEWBERRY, LLC
($448,600)
|
|
|
6391-53-001
|
NUECES
|
CORPUS CHRISTI
|
$296,925
|
FM3354
|
RMC - 639153001
|
12/14/2021
|
11/15/2023
|
SPOT BASE REPAIR
|
HAAS-ANDERSON CONSTRUCTION, LTD.
($343,476)
|
|
|
0488-01-017
|
NOLAN
|
ABILENE
|
$1,419,697
|
FM 1856
|
CC 488-1-17
|
09/01/2021
|
11/15/2023
|
REHAB ROADWAY
|
J. H. STRAIN & SONS, INC.
($1,166,773)
|
|
|
1122-04-012
|
WILSON
|
SAN ANTONIO
|
$5,354,351
|
FM 1344
|
SSW 1122-4-12
|
09/01/2021
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($6,200,914)
|
|
|
0024-07-063
|
BEXAR
|
SAN ANTONIO
|
$2,508,773
|
US 90
|
F 2021(778)
|
08/05/2021
|
11/15/2023
|
INTERS IMPRV
|
DAN WILLIAMS COMPANY
($2,885,971)
|
|
|
6383-53-001
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$1,731,086
|
IH0037
|
RMC - 638353001
|
08/05/2021
|
11/15/2023
|
REHAB OF EXIST ROADWAY
|
J. CARROLL WEAVER, INC.
($1,301,899)
|
|
|
0152-03-062
|
CALDWELL
|
AUSTIN
|
$759,881
|
US 183
|
STP 2021(682)FRS
|
07/02/2021
|
11/15/2023
|
TRAF SIGNAL IMPRVS
|
ANGEL BROTHERS HOLDINGS CORP.
($1,315,225)
|
|
|
0915-14-046
|
WILSON
|
SAN ANTONIO
|
$581,756
|
CR
|
BR 2021(062)
|
07/02/2021
|
11/15/2023
|
BRIDGE REPL
|
TASCOSA BRIDGE CO., LC
($522,736)
|
|
|
0915-14-047
|
WILSON
|
SAN ANTONIO
|
$661,915
|
CR
|
BR 2021(063)
|
07/02/2021
|
11/15/2023
|
BRIDGE REPL
|
HARPER BROTHERS CONSTRUCTION LLC
($577,070)
|
|
|
0113-07-075
|
HAYS
|
AUSTIN
|
$1,294,299
|
US 290
|
CC 113-7-75
|
07/01/2021
|
11/15/2023
|
INTERS IMPRVS WITH RIGHT AND/OR LEFT...
|
RELMCO, INC.
($1,353,925)
|
|
|
0530-01-007
|
BASTROP
|
AUSTIN
|
$1,021,630
|
PR 1A
|
C 530-1-7
|
07/01/2021
|
11/15/2023
|
STATE PARK IMPRVS
|
BECK-REIT & SONS, LTD.
($941,091)
|
|
|
0955-01-027
|
BURLESON
|
BRYAN
|
$1,368,257
|
FM 166
|
STP 2021(719)HES
|
07/01/2021
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
ENCINO LANDSCAPE, INC.
($1,378,418)
|
|
|
0916-29-015
|
LIVE OAK
|
CORPUS CHRISTI
|
$734,945
|
VA
|
STP 2021(632)TAPS
|
06/04/2021
|
11/15/2023
|
CONSTRUCT PEDESTRIAN INFRASTRUCT
|
TI-ZACK CONCRETE, INC.
($587,838)
|
|
|
2373-01-022
|
LA SALLE
|
LAREDO
|
$5,754,069
|
FM 624
|
STP 2020(936)HES
|
06/04/2021
|
11/15/2023
|
WIDEN SHLDR, SEALCOAT, PROF MRK ON E...
|
BRANNAN PAVING CO., LTD.
($5,569,436)
|
|
|
0907-20-005
|
KIMBLE
|
SAN ANGELO
|
$1,099,860
|
PW
|
C 907-20-5
|
06/03/2021
|
11/15/2023
|
CONSTRUCT ACCESS ROADS AND PARKING
|
DIAMOND X CONTRACTING, INC
($1,196,978)
|
|
|
1557-01-043
|
NUECES
|
CORPUS CHRISTI
|
$4,386,361
|
FM 43
|
C 1557-1-43
|
06/03/2021
|
11/15/2023
|
SURF/ROADWAY RESTOR
|
HAAS-ANDERSON CONSTRUCTION, LTD.
($5,154,966)
|
|
|
0830-01-021
|
EDWARDS
|
SAN ANGELO
|
$1,762,404
|
RM 335
|
C 830-1-21
|
05/06/2021
|
11/15/2023
|
REPAIR ROADWAY
|
RELMCO, INC.
($1,670,792)
|
|
|
0908-33-100
|
TAYLOR
|
ABILENE
|
$197,805
|
VA
|
C 908-33-100
|
05/06/2021
|
11/15/2023
|
DRAINAGE IMPRVS
|
TALBRAN ENTERPRISES LLC
($174,853)
|
|
|
0032-07-036
|
STONEWALL
|
ABILENE
|
$3,752,489
|
US 83
|
F 2021(521)
|
05/05/2021
|
11/15/2023
|
INTERS IMPRV
|
FOUTSCO PAVING COMPANY, LLC
($3,582,033)
|
|
|
0887-01-039
|
MIDLAND
|
ODESSA
|
$5,451,297
|
FM 307
|
STP 2021(172)HES
|
05/05/2021
|
11/15/2023
|
INTERS IMPRVS & SAFETY LIGHTING
|
RAGLE CONSTRUCTION, INC.
($4,744,172)
|
|
|
0915-45-055
|
MEDINA
|
SAN ANTONIO
|
$442,828
|
CR
|
BR 2021(142)
|
05/05/2021
|
11/15/2023
|
BRIDGE REPL
|
DELGADO'S CONTRACTORS, LLC
($419,500)
|
|
|
0033-05-095
|
JONES
|
ABILENE
|
$264,888
|
US 83
|
C 33-5-95
|
04/07/2021
|
11/15/2023
|
CONC PAVMT
|
O. TREVINO CONSTRUCTION, LLC
($251,560)
|
|
|
0907-14-009
|
COKE
|
SAN ANGELO
|
$364,847
|
CR
|
BR 2021(023)
|
04/07/2021
|
11/15/2023
|
BRIDGE REPL
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($398,585)
|
|
|
0914-26-009
|
MASON
|
AUSTIN
|
$209,008
|
CS
|
BR 2017(195)
|
04/07/2021
|
11/15/2023
|
REHAB BRIDGE
|
BLACKSMITH VENTURES LLC
($173,539)
|
|
|
6375-91-001
|
NUECES
|
CORPUS CHRISTI
|
$289,027
|
US0181
|
RMC - 637591001
|
03/23/2021
|
11/15/2023
|
DRAINAGE IMPRV AND/OR REPAIRS
|
BECK-REIT & SONS, LTD.
($278,753)
|
|
|
6377-46-001
|
NUECES
|
CORPUS CHRISTI
|
$292,587
|
SH0044
|
BPM - 637746001
|
03/23/2021
|
11/15/2023
|
EROSION REPAIR
|
PATHFIELD INVESTMENTS LLC
($275,822)
|
|
|
6376-05-001
|
ATASCOSA
|
SAN ANTONIO
|
$63,412
|
SH0016
|
BPM - 637605001
|
03/17/2021
|
11/15/2023
|
BRIDGE SUBSTRUCT REPAIR
|
SJ&J CONSTRUCTION, LLC
($60,160)
|
|
|
6376-06-001
|
ATASCOSA
|
SAN ANTONIO
|
$109,614
|
US0281
|
BPM - 637606001
|
03/17/2021
|
11/15/2023
|
RIPRAP REPAIR
|
DBI SERVICES, LLC
($99,804)
|
|
|
0104-07-025
|
PRESIDIO
|
EL PASO
|
$2,202,315
|
US 67
|
STP 2021(412)HES
|
03/04/2021
|
11/15/2023
|
HAZARD ELIM & SAFETY
|
DAN WILLIAMS COMPANY
($2,763,015)
|
|
|
0916-38-014
|
ARANSAS
|
CORPUS CHRISTI
|
$3,982,909
|
CS
|
BR 1902(249)
|
03/04/2021
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
LUCANIA CONSTRUCTION LLC
($4,582,972)
|
|
|
0516-02-029
|
GOLIAD
|
CORPUS CHRISTI
|
$7,795,715
|
SH 239
|
STP 2021(377)
|
02/04/2021
|
11/15/2023
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($7,455,640)
|
|
|
2690-01-036
|
WILLIAMSON
|
AUSTIN
|
$8,755,739
|
FM 971
|
STP 2021(366)
|
02/04/2021
|
11/15/2023
|
ADDING SHOULDERS WITH NO ADDED CAPAC...
|
JORDAN FOSTER CONSTRUCTION, LLC
($8,428,385)
|
|
|
0830-03-013
|
EDWARDS
|
SAN ANGELO
|
$1,129,369
|
RM 335
|
C 830-3-13
|
01/08/2021
|
11/15/2023
|
REPAIR ROADWAY
|
INTEGRITY SERVICES, LLC
($999,998)
|
|
|
0463-04-024
|
GLASSCOCK
|
SAN ANGELO
|
$28,510,932
|
SH 158
|
STP 2020(950)
|
01/07/2021
|
11/15/2023
|
CONSTRUCT OVERPASS
|
REECE ALBERT, INC.
($26,934,935)
|
|
|
1526-01-019
|
SCURRY
|
ABILENE
|
$2,904,242
|
FM 1606
|
BR 2021(258)
|
01/07/2021
|
11/15/2023
|
BRIDGE REPL
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($2,902,279)
|
|
|
6366-21-001
|
NUECES
|
CORPUS CHRISTI
|
$249,596
|
FM0665
|
RMC - 636621001
|
12/16/2020
|
11/15/2023
|
PAVING AND STRIPING OF PARKING LOT
|
DOUBLE L CONTRACTING, LLC
($238,830)
|
|
|
0102-03-087
|
NUECES
|
CORPUS CHRISTI
|
$7,927,833
|
US 77
|
C 102-3-87
|
12/02/2020
|
11/15/2023
|
CONSTRUCTION EXIT & ENTRANCE RAMPS
|
HAAS-ANDERSON CONSTRUCTION, LTD.
($7,712,829)
|
|
|
0005-03-079
|
MIDLAND
|
ODESSA
|
$14,084,697
|
BI 20-E
|
NH 2B20(214)
|
10/02/2020
|
11/15/2023
|
ROADWAY REHAB & INTERS IMPRVS
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($11,162,709)
|
|
|
0907-00-175
|
TOM GREEN
|
SAN ANGELO
|
$965,285
|
VA
|
STP 2021(011)
|
09/04/2020
|
11/15/2023
|
GUARD FENCE, SAFETY END TREATMENTS A...
|
DELGADO'S CONTRACTORS, LLC
($933,273)
|
|
|
0006-02-125
|
NOLAN
|
ABILENE
|
$5,322,695
|
IH 20
|
C 62-1-25
|
08/06/2020
|
11/15/2023
|
CONC MEDIAN BARRIER
|
JAMES CONSTRUCTION GROUP, L.L.C.
($4,724,453)
|
|
|
0252-02-060
|
BURNET
|
AUSTIN
|
$5,145,702
|
US 281
|
STP 2B20(128)HES
|
08/06/2020
|
11/15/2023
|
HWY IMPRV
|
BIG CREEK CONSTRUCTION, LTD.
($4,562,497)
|
|
|
0507-04-045
|
ARANSAS
|
CORPUS CHRISTI
|
$1,470,799
|
FM 1069
|
STP 2B20(173)HES
|
08/06/2020
|
11/15/2023
|
SAFETY WIDENING
|
BRANNAN PAVING CO., LTD.
($1,267,487)
|
|
|
0907-00-201
|
TOM GREEN
|
SAN ANGELO
|
$4,359,165
|
VA
|
C 907-00-201
|
08/06/2020
|
11/15/2023
|
SIDEWALKS AND CURB RAMPS
|
SOUTH TEXAS ILLUMINATION, LLC
($3,905,830)
|
|
|
0907-00-224
|
TOM GREEN
|
SAN ANGELO
|
$3,255,282
|
VA
|
STP 2B20(061) HES
|
08/06/2020
|
11/15/2023
|
UPGRADE GUARD FENCE
|
ELITE CASTLE RESOURCES LLC
($2,518,943)
|
|
|
1229-04-015
|
MAVERICK
|
LAREDO
|
$3,473,239
|
FM 375
|
STP 2B20(132)HES
|
08/06/2020
|
11/15/2023
|
CONC RAISED MEDIAN
|
VECTOR UTILITIES LLC
($3,474,240)
|
|
|
0181-02-032
|
CALLAHAN
|
ABILENE
|
$1,441,061
|
SH 36
|
C 181-2-32
|
08/05/2020
|
11/15/2023
|
ADD TURN , ACCEL AND DECEL LANES
|
CONTRACT PAVING CO.
($1,433,561)
|
|
|
0858-03-019
|
BURLESON
|
BRYAN
|
$3,269,568
|
FM 908
|
STP 2B20(106)HES
|
08/05/2020
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
BEAR CREEK CONTRACTING, LLC
($2,973,231)
|
|
|
0907-00-225
|
TOM GREEN
|
SAN ANGELO
|
$2,277,883
|
VA
|
STP 2B20(062)HES
|
08/05/2020
|
11/15/2023
|
UPGRADE GUARD FENCE
|
ELITE CASTLE RESOURCES LLC
($1,595,703)
|
|
|
0915-12-657
|
BEXAR
|
SAN ANTONIO
|
$3,840,003
|
CR
|
STP 2B20(065)HES
|
08/05/2020
|
11/15/2023
|
CONSTRUCT INTERCHANGE
|
DAN WILLIAMS COMPANY
($4,289,597)
|
|
|
0908-19-026
|
SCURRY
|
ABILENE
|
$1,965,458
|
CS
|
BR 1802(837)
|
07/09/2020
|
11/15/2023
|
BRIDGE REPL
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($2,002,574)
|
|
|
6352-22-001
|
ATASCOSA
|
SAN ANTONIO
|
$146,758
|
US0281
|
BPM - 635222001
|
05/13/2020
|
09/26/2024
|
INSTL RIPRAP AND GABION MATTRESSES
|
DELGADO'S CONTRACTORS, LLC
($125,205)
|
|
|
0150-04-049
|
LLANO
|
AUSTIN
|
$5,031,370
|
SH 29
|
C 150-4-49
|
05/07/2020
|
11/15/2023
|
CONSTRUCT SUPER 2 PASSING LANES
|
ACME BRIDGE COMPANY, INC.
($4,653,515)
|
|
|
0908-24-050
|
JONES
|
ABILENE
|
$1,645,976
|
CR
|
BR 1902(092)
|
05/07/2020
|
11/15/2023
|
BRIDGE REPLACMENT
|
J. H. STRAIN & SONS, INC.
($1,790,933)
|
|
|
0915-13-030
|
ATASCOSA
|
SAN ANTONIO
|
$653,847
|
VA
|
STP 2020(791)
|
05/07/2020
|
11/15/2023
|
CONSTRUCT CURB RAMPS, SIDEWALK, PED...
|
DELGADO'S CONTRACTORS, LLC
($584,272)
|
|
|
1534-02-008
|
GILLESPIE
|
AUSTIN
|
$4,412,413
|
RM 1623
|
STP 2020(977)HES
|
05/07/2020
|
11/15/2023
|
SAFETY IMPRV PROJECTS
|
RAY FARIS, INC.
($4,041,365)
|
|
|
6352-84-001
|
GARZA
|
LUBBOCK
|
$530,939
|
US0084
|
BPM - 635284001
|
05/07/2020
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
BLACKSTONE CONCRETE VENTURES, LLC
($517,185)
|
|
|
6349-75-001
|
BEXAR
|
SAN ANTONIO
|
$292,181
|
MR0681
|
RMC - 634975001
|
04/15/2020
|
11/15/2023
|
ROUTINE MAINT CONTRACT
|
LONE STAR PAVING COMPANY
($195,505)
|
|
|
6352-21-001
|
KERR
|
SAN ANTONIO
|
$181,176
|
SH0027
|
BPM - 635221001
|
04/15/2020
|
11/15/2023
|
BRIDGE PM PROJECT
|
RELMCO, INC.
($126,013)
|
|
|
0917-30-055
|
BURLESON
|
BRYAN
|
$1,521,771
|
CR
|
BR 1702(414)
|
04/09/2020
|
11/15/2023
|
BRIDGE REPL
|
FUQUA CONSTRUCTION CO., INC.
($1,458,198)
|
|
|
1552-01-011
|
KARNES
|
CORPUS CHRISTI
|
$1,940,400
|
FM 1020
|
BR 2020(776)
|
04/09/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
VECTOR UTILITIES LLC
($1,717,294)
|
|
|
0079-01-043
|
BROWN
|
BROWNWOOD
|
$764,279
|
US 67
|
STP 2020(764)HES
|
04/08/2020
|
11/15/2023
|
IMPROVE GUARDRAIL & SAFETY TREAT FIX...
|
3LW CIVIL LLC
($735,534)
|
|
|
6349-50-001
|
WILSON
|
SAN ANTONIO
|
$420,107
|
US0087
|
BPM - 634950001
|
04/08/2020
|
11/15/2023
|
BRIDGE PREVENT MAINT_EROSION CONTROL
|
ACME BRIDGE COMPANY, INC.
($370,338)
|
|
|
0908-20-026
|
NOLAN
|
ABILENE
|
$777,299
|
CR
|
BR 1902(088)
|
03/05/2020
|
11/15/2023
|
BRIDGE REPL
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($830,651)
|
|
|
1206-01-019
|
LIVE OAK
|
CORPUS CHRISTI
|
$1,371,638
|
FM 1358
|
BR 2020(673)
|
03/05/2020
|
11/15/2023
|
REPLACE BRIDGES AND APPROACHES
|
LISKA CONSTRUCTION COMPANY, INC.
($1,425,038)
|
|
|
6343-57-001
|
KARNES
|
CORPUS CHRISTI
|
$293,245
|
FM0791
|
BPM - 634357001
|
02/19/2020
|
11/15/2023
|
CONC STRUCT REPAIR
|
RELMCO, INC.
($836,534)
|
|
|
6343-59-001
|
REFUGIO
|
CORPUS CHRISTI
|
$291,818
|
SH0035
|
BPM - 634359001
|
02/19/2020
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
SJ&J CONSTRUCTION, LLC
($189,060)
|
|
|
6344-17-001
|
KARNES
|
CORPUS CHRISTI
|
$240,006
|
BU0181G
|
RMC - 634417001
|
02/19/2020
|
09/26/2024
|
DRAINAGE IMPRVS AND CUT & RESTORE PA...
|
RELMCO, INC.
($219,205)
|
|
|
6349-49-001
|
COMAL
|
SAN ANTONIO
|
$119,597
|
IH0035
|
BPM - 634949001
|
02/12/2020
|
09/26/2024
|
BRIDGE PREVENT MAINT
|
BECK-REIT & SONS, LTD.
($112,029)
|
|
|
0005-02-118
|
MIDLAND
|
ODESSA
|
$14,628,167
|
BI 20-E
|
NH 2020(570)
|
02/07/2020
|
11/15/2023
|
ROADWAY REHAB
|
REECE ALBERT, INC.
($12,018,225)
|
|
|
0658-01-044
|
BEXAR
|
SAN ANTONIO
|
$5,732,853
|
FM 1535
|
STP 2020(557)MM
|
02/07/2020
|
11/15/2023
|
EXPAND 2 TO 4 LN WITH MEDIAN, TURN L...
|
J3 COMPANY, LLC
($5,683,754)
|
|
|
6354-20-001
|
ZAVALA
|
LAREDO
|
$1,424,893
|
FM0393
|
RMC - 635420001
|
02/07/2020
|
11/15/2023
|
SPOT BASE REPAIR
|
ANDERSON COLUMBIA CO., INC.
($1,349,226)
|
|
|
1422-01-009
|
KARNES
|
CORPUS CHRISTI
|
$1,364,091
|
FM 1354
|
BR 2020(534)
|
02/06/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
HILL COUNTRY BRIDGE, INC.
($1,326,778)
|
|
|
2149-01-010
|
HOWARD
|
ABILENE
|
$6,187,879
|
FM 2230
|
C 2149-1-10
|
02/06/2020
|
11/15/2023
|
EXCAVATION, EMBANKMENT, FLEX BASE, S...
|
TIERRA LEASE SERVICE, LLC
($5,693,175)
|
|
|
6339-30-001
|
TAYLOR
|
ABILENE
|
$198,034
|
IH0020
|
RMC - 633930001
|
01/29/2020
|
11/15/2023
|
INSTL SURVEY TOWER FOUNDATIONS
|
SJ&J CONSTRUCTION, LLC
($255,838)
|
|
|
1119-01-013
|
BEE
|
CORPUS CHRISTI
|
$1,228,040
|
FM 797
|
STP 2020(448)HES
|
01/10/2020
|
09/26/2024
|
WIDEN AND SAFETY TREAT FIXED OBJECTS
|
TIERRA LEASE SERVICE, LLC
($1,364,408)
|
|
|
1742-01-026
|
NUECES
|
CORPUS CHRISTI
|
$125,723
|
FM 1694
|
STP 2020(449)HES
|
01/10/2020
|
09/26/2024
|
ADD LEFT TURN LANE AND SAFETY TREAT...
|
J. CARROLL WEAVER, INC.
($241,172)
|
|
|
0371-05-020
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$791,013
|
FM 2046
|
STP 2020(447)HES
|
01/09/2020
|
09/26/2024
|
SAFETY TREAT FIXED OBJECTS
|
VECTOR UTILITIES LLC
($871,810)
|
|
|
0585-01-016
|
ARANSAS
|
CORPUS CHRISTI
|
$351,312
|
PR 13B
|
ER 1802(687)
|
01/09/2020
|
09/26/2024
|
REPAIR SEA WALL AND DAMAGED ROADWAY
|
LONE STAR SITEWORK, LLC
($540,816)
|
|
|
1086-01-019
|
JIM WELLS
|
CORPUS CHRISTI
|
$664,337
|
FM 2044
|
BR 2020(466)
|
01/09/2020
|
09/26/2024
|
REPLACE BRIDGE AND APPROACHES
|
VECTOR UTILITIES LLC
($750,502)
|
|
|
6346-12-001
|
CROCKETT
|
SAN ANGELO
|
$281,540
|
RM2398
|
BPM - 634612001
|
11/15/2019
|
11/15/2023
|
BRIDGE REPAIRS
|
JAMES CONSTRUCTION GROUP, L.L.C.
($141,455)
|
|
|
6352-49-001
|
CONCHO
|
SAN ANGELO
|
$272,675
|
US0083
|
BPM - 635249001
|
11/15/2019
|
11/15/2023
|
BRIDGE REPAIRS
|
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
($157,962)
|
|
|
0073-07-064
|
LIVE OAK
|
CORPUS CHRISTI
|
$6,900,252
|
IH 37
|
NH 2020(208)
|
11/06/2019
|
11/15/2023
|
REHAB AND OVERLAY WEST AND EAST FRON...
|
HUNTER INDUSTRIES, LTD.
($6,699,673)
|
|
|
6349-14-001
|
KIMBLE
|
SAN ANGELO
|
$973,823
|
FM2169
|
RMC - 634914001
|
11/05/2019
|
11/15/2023
|
FLOOD DAMAGE
|
RELMCO, INC.
($1,068,115)
|
|
|
1009-02-018
|
WILSON
|
SAN ANTONIO
|
$1,805,142
|
FM 537
|
BR 2020(031)
|
09/06/2019
|
11/15/2023
|
BRIDGE REPL
|
ANGEL BROTHERS HOLDINGS CORP.
($2,029,110)
|
|
|
1087-01-014
|
JIM WELLS
|
CORPUS CHRISTI
|
$1,022,958
|
FM 738
|
STP 2020(040)HES
|
09/06/2019
|
11/15/2023
|
PROVIDE ADDITIONAL PAVED SURF WIDTH
|
J. CARROLL WEAVER, INC.
($1,150,495)
|
|
|
0006-03-133
|
NOLAN
|
ABILENE
|
$1,324,105
|
IH 20
|
BR 2020(028)
|
09/05/2019
|
11/15/2023
|
REPLACE DECK AND APPROACHES
|
DCI CONTRACTING, INC.
($1,863,849)
|
|
|
0738-01-001
|
REFUGIO
|
CORPUS CHRISTI
|
$1,149,023
|
FM 136
|
BR 2020(039)
|
09/05/2019
|
11/15/2023
|
BRIDGE MAINT
|
CHAMPION INFRASTRUCTURE, LLC
($1,136,958)
|
|
|
2767-02-004
|
GARZA
|
LUBBOCK
|
$1,306,086
|
FM 3519
|
BR 2020(012)
|
09/05/2019
|
11/15/2023
|
BRIDGE MAINT AND IMPRV
|
BLACKSTONE CONCRETE VENTURES, LLC
($1,306,629)
|
|
|
0922-11-043
|
VAL VERDE
|
LAREDO
|
$4,213,915
|
PW
|
C 922-11-43
|
07/10/2019
|
09/27/2024
|
BASE, SURF TREAT, GRAD, STR, PAV MRK
|
RELMCO, INC.
($3,978,828)
|
|
|
1088-04-025
|
NUECES
|
CORPUS CHRISTI
|
$3,670,136
|
FM 892
|
STP 1902(110)
|
07/10/2019
|
09/27/2024
|
REHAB AND WIDEN ROADWAY
|
J. CARROLL WEAVER, INC.
($3,732,484)
|
|
|
1643-01-016
|
CROCKETT
|
SAN ANGELO
|
$14,208,778
|
SH 137
|
STP 1902(153)
|
07/10/2019
|
09/27/2024
|
RESTOR OF EXIST ROAD
|
REECE ALBERT, INC.
($16,675,320)
|
|
|
0548-01-034
|
ANDREWS
|
ODESSA
|
$10,643,351
|
SH 176
|
STP 2019(944)HES
|
07/09/2019
|
09/27/2024
|
GR,STR,BASE,SURF,SIGN,&ILL
|
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
($14,337,021)
|
|
|
0907-11-006
|
STERLING
|
SAN ANGELO
|
$1,274,064
|
CR
|
BR 1702(584)
|
07/09/2019
|
09/27/2024
|
BRIDGE REPL
|
ACME BRIDGE COMPANY, INC.
($1,323,346)
|
|
|
0908-19-027
|
SCURRY
|
ABILENE
|
$1,038,145
|
VA
|
STP 1902(339)
|
07/09/2019
|
09/27/2024
|
SPOT REPAIR, MILLING. HMAC
|
RK HALL, LLC
($1,138,633)
|
|
|
0158-01-083
|
RUNNELS
|
SAN ANGELO
|
$4,143,679
|
US 67
|
STP 1902(010)HES
|
06/05/2019
|
11/15/2023
|
INSTL CABLE BARRIER
|
GRATIOT CONSTRUCTION, LTD.
($3,312,755)
|
|
|
0906-32-057
|
MIDLAND
|
ODESSA
|
$767,308
|
CS
|
STP 2019(481)TAPS
|
06/05/2019
|
11/15/2023
|
BICYCLE AND PEDESTRIAN IMPRVS
|
ENCINO LANDSCAPE, INC.
($834,327)
|
|
|
0908-19-025
|
SCURRY
|
ABILENE
|
$2,201,960
|
CR
|
BR 2018(378)
|
06/05/2019
|
11/15/2023
|
REMOVE AND REPLACE EXIST BRIDGE AND...
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($2,153,443)
|
|
|
0317-01-037
|
FISHER
|
ABILENE
|
$15,042,021
|
FM 57
|
STP 2019(985)
|
06/04/2019
|
11/15/2023
|
WIDEN NON-FREEWAY & REPLACE BRIDGE A...
|
FNF CONSTRUCTION, INC.
($18,577,371)
|
|
|
6311-81-001
|
KARNES
|
CORPUS CHRISTI
|
$1,577,929
|
FM1354
|
RMC - 631181001
|
06/04/2019
|
11/15/2023
|
REHAB OF AN EXIST ROADWAY
|
TIERRA LEASE SERVICE, LLC
($1,657,478)
|
|
|
0915-13-029
|
ATASCOSA
|
SAN ANTONIO
|
$484,586
|
CR
|
BR 2019(907)
|
05/07/2019
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
SB CONTRACTORS LLC
($619,854)
|
|
|
1558-01-019
|
NUECES
|
CORPUS CHRISTI
|
$4,218,585
|
FM 70
|
C 1558-1-19
|
05/07/2019
|
11/15/2023
|
RESTOR OF EXIST ROADWAY
|
TIERRA LEASE SERVICE, LLC
($4,592,255)
|
|
|
0348-03-030
|
KARNES
|
CORPUS CHRISTI
|
$14,368,033
|
SH 80
|
C 348-3-30
|
04/03/2019
|
11/15/2023
|
REHAB ROADWAY AND ADD PASSING LANES
|
HUNTER INDUSTRIES, LTD.
($13,738,005)
|
|
|
2825-01-009
|
BURLESON
|
BRYAN
|
$1,225,651
|
FM 2774
|
SSW 2825-1-9
|
04/02/2019
|
11/15/2023
|
WIDEN RDWY, EDGLN, CTRLN PROFL MRK
|
KNIFE RIVER CORPORATION - SOUTH
($1,323,982)
|
|
|
2886-02-017
|
NUECES
|
CORPUS CHRISTI
|
$4,457,303
|
FM 2826
|
C 2886-2-17
|
04/02/2019
|
11/15/2023
|
REHAB ROADWAY AND WIDEN
|
J. CARROLL WEAVER, INC.
($4,689,384)
|
|
|
6335-20-001
|
GARZA
|
LUBBOCK
|
$1,328,083
|
US0084
|
BPM - 633520001
|
04/02/2019
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
EARTH BUILDERS, L.P.
($1,523,850)
|
|
|
0074-01-055
|
LIVE OAK
|
CORPUS CHRISTI
|
$1,927,013
|
IH 37
|
C 74-1-55
|
03/06/2019
|
11/15/2023
|
REHAB AND WIDEN-WEST FRTG LANES ONLY
|
HUNTER INDUSTRIES, LTD.
($1,839,972)
|
|
|
6331-70-001
|
BEXAR
|
SAN ANTONIO
|
$322,033
|
IH0410
|
RMC - 633170001
|
03/06/2019
|
11/15/2023
|
CONSTRUCT RIPRAP
|
RELMCO, INC.
($371,427)
|
|
|
0069-01-057
|
HOWARD
|
ABILENE
|
$1,105,870
|
US 87
|
NH 2019(640)
|
03/05/2019
|
11/15/2023
|
DRAINAGE WORK
|
GILVIN-TERRILL, LTD.
($1,866,062)
|
|
|
0558-06-016
|
GLASSCOCK
|
SAN ANGELO
|
$5,711,544
|
RM 33
|
STP 2019(648)
|
03/05/2019
|
11/15/2023
|
RESTOR OF EXIST ROAD
|
RK HALL, LLC
($6,698,939)
|
|
|
0915-13-028
|
ATASCOSA
|
SAN ANTONIO
|
$637,796
|
CR
|
BR 1702(572)
|
03/05/2019
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
RELMCO, INC.
($823,867)
|
|
|
6335-01-001
|
COMAL
|
SAN ANTONIO
|
$117,154
|
FM0306
|
BPM - 633501001
|
02/13/2019
|
11/15/2023
|
RIPRAP REPAIR
|
DALRYMPLE GRAVEL AND CONTRACTING COMPANY, INC.
($106,177)
|
|
|
0049-14-012
|
ROBERTSON
|
BRYAN
|
$2,034,389
|
FM 46
|
STP 2019(497)
|
02/05/2019
|
11/15/2023
|
GRDG, WDN, STRCS, BASE, SURF, SGNS,...
|
KNIFE RIVER CORPORATION - SOUTH
($1,723,097)
|
|
|
0915-18-024
|
FRIO
|
SAN ANTONIO
|
$557,192
|
CR
|
BR 2007(141)
|
02/05/2019
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
ENCINO LANDSCAPE, INC.
($572,307)
|
|
|
1842-01-016
|
MARTIN
|
ODESSA
|
$1,216,324
|
FM 26
|
C 1842-1-16
|
02/05/2019
|
11/15/2023
|
IMPROVE DRAINAGE
|
RK HALL, LLC
($935,181)
|
|
|
2452-04-016
|
BEXAR
|
SAN ANTONIO
|
$23,174,045
|
SL 1604
|
STP 2019(510)
|
02/05/2019
|
11/15/2023
|
EXPAND FROM 2 LANES TO 4 LANE DIVIDE...
|
MARIO SINACOLA & SONS EXCAVATING, INC.
($20,172,902)
|
|
|
6320-47-001
|
WASHINGTON
|
BRYAN
|
$532,510
|
SH0105
|
BPM - 632047001
|
02/05/2019
|
11/15/2023
|
SCOUR REPAIR
|
SJ&J CONSTRUCTION, LLC
($510,520)
|
|
|
6339-51-001
|
TOM GREEN
|
SAN ANGELO
|
$123,500
|
FM2288
|
BPM - 633951001
|
01/30/2019
|
09/27/2024
|
DEBRIS RMVL
|
FOUR R OILFIELD SERVICES, LLC
($112,050)
|
|
|
0139-05-043
|
REEVES
|
ODESSA
|
$23,840,072
|
US 285
|
STP 2019(387)
|
01/09/2019
|
11/15/2023
|
ROADWAY REHAB
|
FNF CONSTRUCTION, INC.
($18,885,091)
|
|
|
0301-03-026
|
FRIO
|
SAN ANTONIO
|
$1,362,455
|
SH 85
|
C 301-3-26
|
01/09/2019
|
11/15/2023
|
REHAB EXIST ROADWAY
|
ANDERSON COLUMBIA CO., INC.
($1,754,396)
|
|
|
0691-01-042
|
KARNES
|
CORPUS CHRISTI
|
$9,269,755
|
FM 81
|
STP 2019(463)
|
01/08/2019
|
11/15/2023
|
REHAB AND WIDEN ROADWAY
|
RAY FARIS, INC.
($7,894,058)
|
|
|
0915-45-053
|
MEDINA
|
SAN ANTONIO
|
$452,744
|
CR
|
BR 1702(011)
|
01/08/2019
|
11/15/2023
|
REPLACE BRIDGE & APPROACHES
|
RELMCO, INC.
($487,791)
|
|
|
0114-06-029
|
BASTROP
|
AUSTIN
|
$19,616,132
|
US 290
|
NH 2019(298)
|
12/06/2018
|
11/15/2023
|
GR, BASE, STRUCT, HMACP & PVMT MKS
|
ANGEL BROTHERS HOLDINGS CORP.
($18,681,315)
|
|
|
0210-03-025
|
MILAM
|
BRYAN
|
$1,422,518
|
FM 1712
|
SSW 210-3-25
|
12/06/2018
|
11/15/2023
|
WIDEN ROADWAY, EDGLN & CTRLN PROFL M...
|
KNIFE RIVER CORPORATION - SOUTH
($1,262,198)
|
|
|
0073-02-071
|
BEXAR
|
SAN ANTONIO
|
$2,059,166
|
US 281
|
NH 2019(273)
|
12/05/2018
|
11/15/2023
|
INTERS OPERATIONAL IMPRVS
|
ALL IN CONSTRUCTION, L.L.C.
($1,936,000)
|
|
|
1188-02-107
|
MIDLAND
|
ODESSA
|
$5,697,387
|
SL 250
|
NH 2019(107)
|
10/03/2018
|
11/15/2023
|
WIDENING AND REHAB
|
RK HALL, LLC
($6,656,390)
|
|
|
1890-01-046
|
BEXAR
|
SAN ANTONIO
|
$18,393,325
|
FM 1976
|
STP 2019(111)
|
10/03/2018
|
11/15/2023
|
REHAB & WIDEN NARROW ROADWAY TO ADD...
|
CURRAN CONTRACTING COMPANY
($16,483,393)
|
|
|
0748-05-040
|
ATASCOSA
|
SAN ANTONIO
|
$5,263,546
|
FM 140
|
STP 2019(110)
|
10/02/2018
|
11/15/2023
|
GRADE, BASE, SC, SURF, PAVMT MRK
|
HUNTER INDUSTRIES, LTD.
($4,730,331)
|
|
|
0143-01-055
|
BEXAR
|
SAN ANTONIO
|
$3,422,190
|
US 87
|
NH 2019(036)
|
09/07/2018
|
11/15/2023
|
RESTORE EXIST ROADWAY
|
JORDAN FOSTER CONSTRUCTION, LLC
($3,451,000)
|
|
|
0025-02-217
|
BEXAR
|
SAN ANTONIO
|
$2,058,727
|
IH 10
|
BR 2019(035)
|
09/06/2018
|
11/15/2023
|
PAINT & REPAIR BRG, SURF, PAV'T MRK
|
RELMCO, INC.
($1,479,046)
|
|
|
0915-45-051
|
MEDINA
|
SAN ANTONIO
|
$417,220
|
CR
|
BR 2016(626)
|
09/06/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
SB CONTRACTORS LLC
($274,730)
|
|
|
1503-02-011
|
HOWARD
|
ABILENE
|
$3,142,591
|
FM 1584
|
STP 1802(505)HES
|
08/08/2018
|
11/15/2023
|
PAVMT WIDENING
|
DELHUR INDUSTRIES, INC.
($3,443,262)
|
|
|
3621-01-014
|
VAL VERDE
|
LAREDO
|
$14,331,589
|
SL 79
|
STP 1802(541)
|
08/08/2018
|
11/15/2023
|
BASE,GRADE,ACP,PAVMRK,ILLUM
|
HUNTER INDUSTRIES, LTD.
($11,318,353)
|
|
|
0005-04-079
|
MARTIN
|
ODESSA
|
$335,835
|
IH 20
|
NH 1802(782)
|
08/07/2018
|
11/15/2023
|
BRIDGE DEMOL
|
NEW WORLD CONTRACTING, LLC
($377,597)
|
|
|
0016-08-036
|
BEXAR
|
SAN ANTONIO
|
$1,390,323
|
SL 368
|
NH 1802(611)
|
08/07/2018
|
11/15/2023
|
INTERS OPERATIONAL IMPRVS
|
E-Z BEL CONSTRUCTION, LLC
($1,345,680)
|
|
|
0540-05-048
|
BRAZOS
|
BRYAN
|
$4,143,105
|
FM 159
|
C 540-5-48
|
08/07/2018
|
11/15/2023
|
REHAB EXIST ROAD
|
GLENN FUQUA, INC.
($2,816,988)
|
|
|
3026-01-026
|
SAN PATRICIO
|
CORPUS CHRISTI
|
$19,105,024
|
FM 2986
|
STP 2018(633)
|
07/11/2018
|
11/15/2023
|
UPGRADE TO 5-LANE URBAN ROADWAY
|
BAY LTD.
($17,126,620)
|
|
|
0383-04-061
|
KLEBERG
|
CORPUS CHRISTI
|
$3,390,740
|
SH 141
|
STP 1802(405)
|
07/10/2018
|
11/15/2023
|
MISCELLANEOUS CONSTRUCTION
|
TI-ZACK CONCRETE, INC.
($3,087,011)
|
|
|
0691-01-035
|
KARNES
|
CORPUS CHRISTI
|
$4,588,436
|
FM 81
|
C 691-1-35
|
07/10/2018
|
11/15/2023
|
WIDEN OR REPLACE STRUCT
|
LISKA CONSTRUCTION COMPANY, INC.
($4,236,891)
|
|
|
0296-02-033
|
FISHER
|
ABILENE
|
$2,051,214
|
US 180
|
BR 2018(951)
|
06/06/2018
|
11/15/2023
|
BRIDGE REPL
|
J. H. STRAIN & SONS, INC.
($1,763,519)
|
|
|
1423-01-034
|
REFUGIO
|
CORPUS CHRISTI
|
$1,294,334
|
FM 1360
|
STP 2018(978)HES
|
06/06/2018
|
11/15/2023
|
SAFETY TRT FIXED OBJ, WIDEN LANES AN...
|
BRANNAN PAVING CO., LTD.
($1,520,496)
|
|
|
0270-04-006
|
KARNES
|
CORPUS CHRISTI
|
$1,856,606
|
BS 72-B
|
STP 2018(977)
|
06/05/2018
|
11/15/2023
|
REHAB ROADWAY
|
HUNTER INDUSTRIES, LTD.
($1,573,310)
|
|
|
0613-02-063
|
ATASCOSA
|
SAN ANTONIO
|
$5,215,910
|
SH 16
|
C 613-2-63
|
05/02/2018
|
11/15/2023
|
REPLACE EXIST BRIDGE
|
HARPER BROTHERS CONSTRUCTION LLC
($5,704,330)
|
|
|
1206-01-018
|
LIVE OAK
|
CORPUS CHRISTI
|
$2,843,075
|
FM 1358
|
BR 1502(580)
|
05/01/2018
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
ANGEL BROTHERS HOLDINGS CORP.
($2,572,495)
|
|
|
0253-03-072
|
COMAL
|
SAN ANTONIO
|
$761,253
|
US 281
|
NH 2018(594)
|
04/04/2018
|
11/15/2023
|
EXPAND 2 LANES TO 4 LANES DIVIDED RU...
|
HUNTER INDUSTRIES, LTD.
($726,396)
|
|
|
6327-84-001
|
BEE
|
CORPUS CHRISTI
|
$473,430
|
US0181
|
BPM - 632784001
|
04/03/2018
|
11/15/2023
|
CONC STRUCT & SCOUR REPAIR
|
BECK-REIT & SONS, LTD.
($385,553)
|
|
|
6329-85-001
|
NUECES
|
CORPUS CHRISTI
|
$1,215,665
|
FM0624
|
RMC - 632985001
|
04/03/2018
|
11/15/2023
|
MILL & OVERLAY
|
HAAS-ANDERSON CONSTRUCTION, LTD.
($893,078)
|
|
|
0006-03-134
|
NOLAN
|
ABILENE
|
$2,124,098
|
IH 20
|
NH 2018(584)
|
03/07/2018
|
11/15/2023
|
TRT BASE,1-CST,4"SPC & LTD C&G
|
NOBLES ROAD CONSTRUCTION, INC.
($1,487,307)
|
|
|
0908-00-085
|
TAYLOR
|
ABILENE
|
$504,145
|
VA
|
NH 2018(587)
|
03/07/2018
|
11/15/2023
|
BRIDGE REPAIR
|
AW&E CONSTRUCTION LLC
($258,870)
|
|
|
6327-01-001
|
BEXAR
|
SAN ANTONIO
|
$534,335
|
SH0016
|
BPM - 632701001
|
03/07/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
RELMCO, INC.
($427,360)
|
|
|
0848-04-046
|
MEDINA
|
SAN ANTONIO
|
$2,386,370
|
FM 462
|
STP 2018(596)
|
03/06/2018
|
11/15/2023
|
REHAB & WIDEN NARROW ROADWAY TO ADD...
|
DEAN WORD COMPANY, LTD.
($1,968,967)
|
|
|
0143-03-044
|
WILSON
|
SAN ANTONIO
|
$4,005,997
|
US 87
|
NH 2018(530)
|
02/02/2018
|
11/15/2023
|
REHABITITATE EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($2,913,595)
|
|
|
0850-04-027
|
WILSON
|
SAN ANTONIO
|
$3,493,740
|
FM 775
|
STP 2018(534)
|
02/02/2018
|
11/15/2023
|
MILL, OVERLAY, PAV MARKS, RECON FM 3...
|
HUNTER INDUSTRIES, LTD.
($2,096,268)
|