PREPARING ROW
|
STA
|
150.000
|
$3,000.000
|
$515.580
|
$250.000
|
$284.780
|
$416.250
|
$1,750.000
|
$2,300.000
|
$410.320
|
|
|
REMOVING STAB BASE AND ASPH PAV(4"-16")
|
SY
|
3,058.000
|
$4.000
|
$4.560
|
$6.500
|
$6.920
|
$9.220
|
$5.000
|
$18.000
|
$9.460
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
2,685.000
|
$6.000
|
$4.560
|
$2.000
|
$5.510
|
$9.220
|
$6.000
|
$2.000
|
$6.460
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
31,764.000
|
$9.000
|
$7.890
|
$10.000
|
$10.180
|
$12.030
|
$12.000
|
$10.000
|
$12.250
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
22,328.000
|
$8.000
|
$7.890
|
$8.000
|
$9.860
|
$21.520
|
$10.000
|
$8.000
|
$6.910
|
|
|
BLADING
|
HR
|
48.000
|
$100.000
|
$91.200
|
$75.000
|
$97.250
|
$83.250
|
$125.000
|
$100.000
|
$140.650
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
151,600.000
|
$0.400
|
$0.320
|
$0.350
|
$0.320
|
$0.340
|
$0.320
|
$0.280
|
$0.340
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
75,800.000
|
$0.300
|
$0.270
|
$0.250
|
$0.270
|
$0.300
|
$0.270
|
$0.270
|
$0.290
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
75,800.000
|
$0.300
|
$0.270
|
$0.250
|
$0.270
|
$0.300
|
$0.270
|
$0.270
|
$0.290
|
|
|
VEGETATIVE WATERING
|
MG
|
3,764.000
|
$15.000
|
$16.650
|
$12.000
|
$7.480
|
$13.320
|
$28.000
|
$10.000
|
$11.800
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
29,126.000
|
$1.500
|
$0.750
|
$0.800
|
$0.750
|
$2.080
|
$0.750
|
$1.600
|
$0.810
|
|
|
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
|
CY
|
13,835.000
|
$42.000
|
$57.170
|
$59.500
|
$65.600
|
$57.530
|
$76.000
|
$65.000
|
$69.680
|
|
|
CEMENT
|
TON
|
829.000
|
$150.000
|
$147.000
|
$145.000
|
$140.000
|
$158.730
|
$154.000
|
$150.000
|
$164.790
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(9")
|
SY
|
77,181.000
|
$1.600
|
$1.480
|
$1.200
|
$2.610
|
$1.530
|
$3.000
|
$2.700
|
$1.390
|
|
|
CEMENT TREAT(NEW BASE)(9")
|
SY
|
13,599.000
|
$4.000
|
$1.480
|
$1.200
|
$1.790
|
$1.530
|
$3.400
|
$2.500
|
$2.340
|
|
|
ASPH (RC-250)
|
GAL
|
18,156.000
|
$4.500
|
$3.730
|
$3.250
|
$4.000
|
$3.310
|
$3.500
|
$3.500
|
$4.870
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
672.000
|
$72.000
|
$58.460
|
$95.000
|
$78.900
|
$130.520
|
$75.000
|
$100.000
|
$129.550
|
|
|
ASPH(AC-15P, HFRS-2P OR CRS-2P)
|
GAL
|
34,497.000
|
$3.000
|
$3.200
|
$2.750
|
$3.200
|
$2.910
|
$2.900
|
$3.500
|
$4.300
|
|
|
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
|
CY
|
1,067.000
|
$150.000
|
$74.780
|
$79.000
|
$87.160
|
$98.900
|
$100.000
|
$100.000
|
$140.380
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,100.000
|
$35.000
|
$29.640
|
$51.500
|
$35.790
|
$49.950
|
$36.000
|
$41.000
|
$63.070
|
|
|
CEM STABIL BKFL
|
CY
|
242.000
|
$115.000
|
$150.000
|
$90.000
|
$150.000
|
$166.500
|
$140.000
|
$150.000
|
$151.410
|
|
|
FLOWABLE BACKFILL
|
CY
|
6.000
|
$300.000
|
$162.750
|
$285.000
|
$150.000
|
$249.750
|
$155.000
|
$350.000
|
$250.110
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,780.000
|
$15.000
|
$12.550
|
$10.500
|
$25.000
|
$5.550
|
$25.000
|
$25.000
|
$39.800
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
232.000
|
$110.000
|
$74.650
|
$95.000
|
$75.000
|
$66.600
|
$75.000
|
$68.000
|
$116.840
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,264.000
|
$185.000
|
$299.670
|
$225.000
|
$235.000
|
$234.210
|
$235.000
|
$220.000
|
$300.290
|
|
|
CL C CONC (ABUT)
|
CY
|
77.200
|
$800.000
|
$850.000
|
$900.000
|
$732.200
|
$943.500
|
$735.000
|
$900.000
|
$1,039.130
|
|
|
CL C CONC (CAP)
|
CY
|
81.600
|
$1,000.000
|
$850.000
|
$1,275.000
|
$907.760
|
$943.500
|
$920.000
|
$1,000.000
|
$1,064.610
|
|
|
CL C CONC (COLUMN)
|
CY
|
76.300
|
$1,000.000
|
$850.000
|
$1,375.000
|
$784.000
|
$943.500
|
$790.000
|
$900.000
|
$999.540
|
|
|
REINF CONC SLAB
|
SF
|
21,850.000
|
$16.000
|
$18.500
|
$21.000
|
$14.250
|
$20.650
|
$14.500
|
$20.000
|
$22.240
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
2,835.000
|
$140.000
|
$140.000
|
$150.000
|
$135.000
|
$158.730
|
$140.000
|
$160.000
|
$161.780
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
88.000
|
$425.000
|
$456.760
|
$500.000
|
$425.000
|
$543.900
|
$490.000
|
$550.000
|
$473.740
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
116.000
|
$400.000
|
$450.000
|
$500.000
|
$425.000
|
$527.250
|
$490.000
|
$500.000
|
$540.930
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
134.000
|
$150.000
|
$113.620
|
$110.000
|
$135.000
|
$222.000
|
$180.000
|
$200.000
|
$244.650
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
100.000
|
$500.000
|
$504.010
|
$525.000
|
$435.000
|
$543.900
|
$430.000
|
$450.000
|
$580.110
|
|
|
RAIL (TY T223)
|
LF
|
1,022.000
|
$75.000
|
$100.000
|
$90.000
|
$78.400
|
$116.550
|
$82.000
|
$90.000
|
$135.840
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
126.000
|
$100.000
|
$90.000
|
$95.000
|
$82.600
|
$99.900
|
$84.000
|
$120.000
|
$144.310
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
584.000
|
$65.000
|
$63.000
|
$60.000
|
$54.000
|
$83.250
|
$60.000
|
$90.000
|
$65.930
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
166.000
|
$75.000
|
$78.750
|
$75.000
|
$74.550
|
$94.350
|
$75.000
|
$105.000
|
$91.970
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
42.000
|
$125.000
|
$126.000
|
$150.000
|
$133.700
|
$177.600
|
$120.000
|
$200.000
|
$177.280
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
16.000
|
$150.000
|
$241.510
|
$170.000
|
$2,250.000
|
$133.200
|
$230.000
|
$480.000
|
$192.640
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$1,200.000
|
$1,083.630
|
$1,350.000
|
$975.000
|
$1,748.250
|
$1,100.000
|
$1,600.000
|
$1,029.490
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,417.540
|
$1,600.000
|
$1,100.000
|
$1,998.000
|
$1,400.000
|
$1,900.000
|
$1,288.240
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,500.000
|
$2,095.850
|
$1,900.000
|
$1,750.000
|
$2,553.000
|
$2,000.000
|
$2,600.000
|
$1,653.240
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,750.000
|
$3,927.100
|
$2,700.000
|
$2,250.000
|
$4,884.000
|
$3,800.000
|
$4,200.000
|
$2,380.920
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,000.000
|
$1,890.050
|
$800.000
|
$1,200.000
|
$1,221.000
|
$1,800.000
|
$1,200.000
|
$2,056.560
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,500.000
|
$997.530
|
$500.000
|
$900.000
|
$971.250
|
$950.000
|
$2,500.000
|
$1,694.290
|
|
|
REMOV STR (PIPE)
|
LF
|
189.000
|
$20.000
|
$12.600
|
$6.000
|
$20.000
|
$14.430
|
$12.000
|
$100.000
|
$20.240
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$78,000.000
|
$200,000.000
|
$130,000.000
|
$135,000.000
|
$213,120.000
|
$135,000.000
|
$150,000.000
|
$242,970.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$550,000.000
|
$582,038.000
|
$525,000.000
|
$881,476.680
|
$500,000.000
|
$860,000.000
|
$830,000.000
|
$801,356.730
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$6,000.000
|
$3,411.170
|
$2,500.000
|
$3,394.700
|
$4,995.000
|
$1,200.000
|
$15,000.000
|
$3,282.170
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
380.000
|
$30.000
|
$25.500
|
$25.500
|
$25.500
|
$32.190
|
$26.000
|
$35.000
|
$27.030
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
380.000
|
$10.000
|
$7.000
|
$7.000
|
$7.000
|
$16.650
|
$7.000
|
$12.500
|
$7.600
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$20.000
|
$15.000
|
$15.000
|
$15.000
|
$16.650
|
$15.000
|
$30.000
|
$16.050
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$5.000
|
$2.000
|
$2.000
|
$2.000
|
$9.710
|
$2.000
|
$8.000
|
$2.400
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,010.000
|
$4.000
|
$2.750
|
$2.750
|
$2.750
|
$2.390
|
$2.750
|
$3.500
|
$2.930
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,010.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.560
|
$1.000
|
$0.500
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
440.000
|
$5.000
|
$5.500
|
$5.500
|
$5.500
|
$5.210
|
$5.500
|
$7.000
|
$5.990
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
440.000
|
$1.000
|
$1.500
|
$1.500
|
$1.500
|
$0.560
|
$1.500
|
$1.000
|
$1.790
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
20.000
|
$4,300.000
|
$3,500.000
|
$3,000.000
|
$3,000.000
|
$3,885.000
|
$4,400.000
|
$1,000.000
|
$4,583.910
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,080.000
|
$25.000
|
$25.000
|
$35.000
|
$18.000
|
$19.980
|
$18.000
|
$60.000
|
$25.660
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,080.000
|
$10.000
|
$10.000
|
$15.000
|
$18.000
|
$12.210
|
$18.000
|
$10.000
|
$17.020
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,786.000
|
$30.000
|
$30.660
|
$30.000
|
$39.550
|
$38.850
|
$46.000
|
$40.000
|
$45.220
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
28,400.000
|
$0.150
|
$0.130
|
$0.150
|
$0.130
|
$0.280
|
$0.520
|
$1.750
|
$0.180
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
14,200.000
|
$0.150
|
$0.150
|
$0.200
|
$0.150
|
$0.280
|
$0.550
|
$1.950
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,175.000
|
$25.000
|
$19.000
|
$20.000
|
$19.250
|
$21.090
|
$20.000
|
$23.000
|
$20.030
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,650.000
|
$1,750.000
|
$1,800.000
|
$1,831.500
|
$2,300.000
|
$1,950.000
|
$1,993.590
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,175.000
|
$5.000
|
$1.750
|
$2.000
|
$1.350
|
$1.940
|
$1.400
|
$1.500
|
$1.920
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,000.000
|
$2,350.000
|
$2,500.000
|
$2,430.000
|
$2,608.500
|
$2,500.000
|
$2,500.000
|
$2,479.390
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$250.000
|
$275.000
|
$300.000
|
$115.000
|
$305.250
|
$115.000
|
$150.000
|
$300.640
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,050.000
|
$1,100.000
|
$700.000
|
$1,165.500
|
$700.000
|
$500.000
|
$1,150.080
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$16,200.000
|
$6,800.000
|
$7,500.000
|
$7,500.000
|
$7,548.000
|
$7,500.000
|
$10,000.000
|
$7,187.580
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
5.000
|
$200.000
|
$195.000
|
$225.000
|
$217.500
|
$216.450
|
$200.000
|
$220.000
|
$214.270
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
28.000
|
$450.000
|
$575.000
|
$600.000
|
$561.130
|
$638.250
|
$575.000
|
$600.000
|
$613.950
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
4.000
|
$620.000
|
$750.000
|
$800.000
|
$727.480
|
$832.500
|
$750.000
|
$750.000
|
$797.020
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
23.000
|
$650.000
|
$625.000
|
$650.000
|
$626.120
|
$693.750
|
$625.000
|
$650.000
|
$664.520
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$650.000
|
$850.000
|
$900.000
|
$721.390
|
$832.500
|
$850.000
|
$800.000
|
$902.020
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
3.000
|
$900.000
|
$1,050.000
|
$1,100.000
|
$846.400
|
$1,165.500
|
$1,100.000
|
$900.000
|
$1,112.020
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$460.000
|
$350.000
|
$375.000
|
$564.000
|
$388.500
|
$350.000
|
$610.000
|
$377.020
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
55.000
|
$50.000
|
$75.000
|
$80.000
|
$85.930
|
$83.250
|
$75.000
|
$93.000
|
$87.400
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
46.000
|
$200.000
|
$110.000
|
$125.000
|
$80.000
|
$122.100
|
$110.000
|
$320.000
|
$123.770
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
18.000
|
$15.000
|
$16.000
|
$20.000
|
$11.990
|
$17.760
|
$16.000
|
$13.000
|
$22.090
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$75.000
|
$65.000
|
$70.000
|
$42.500
|
$72.150
|
$65.000
|
$45.000
|
$80.140
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
8.000
|
$15.000
|
$15.000
|
$15.000
|
$20.000
|
$16.650
|
$15.000
|
$21.000
|
$27.640
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
38.000
|
$25.000
|
$28.000
|
$30.000
|
$18.250
|
$31.080
|
$28.000
|
$20.000
|
$36.910
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
29,400.000
|
$0.250
|
$0.240
|
$0.350
|
$0.320
|
$0.270
|
$0.330
|
$0.270
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
30,300.000
|
$0.250
|
$0.240
|
$0.350
|
$0.320
|
$0.270
|
$0.330
|
$0.270
|
$0.260
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,800.000
|
$0.600
|
$0.670
|
$0.500
|
$0.480
|
$0.740
|
$0.500
|
$1.330
|
$0.740
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$7.000
|
$8.000
|
$15.500
|
$15.000
|
$8.880
|
$15.000
|
$10.500
|
$12.360
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,800.000
|
$0.750
|
$0.670
|
$0.500
|
$0.480
|
$0.740
|
$0.500
|
$1.330
|
$0.720
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,210.000
|
$1.000
|
$0.690
|
$0.850
|
$0.800
|
$0.770
|
$0.800
|
$1.010
|
$0.770
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
30,170.000
|
$0.300
|
$0.360
|
$0.450
|
$0.400
|
$0.400
|
$0.400
|
$0.370
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,070.000
|
$0.300
|
$0.400
|
$0.450
|
$0.420
|
$0.440
|
$0.400
|
$0.380
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
25,548.000
|
$0.300
|
$0.360
|
$0.450
|
$0.400
|
$0.400
|
$0.400
|
$0.370
|
$0.390
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
232.000
|
$10.000
|
$12.000
|
$13.000
|
$12.000
|
$13.320
|
$12.000
|
$10.000
|
$13.010
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$100.000
|
$193.000
|
$200.000
|
$190.000
|
$214.230
|
$195.000
|
$215.000
|
$210.580
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$200.000
|
$211.000
|
$250.000
|
$255.000
|
$234.210
|
$260.000
|
$241.000
|
$229.480
|
|
REFL PAV MRKR TY I-C
|
EA
|
112.000
|
$3.000
|
$4.000
|
$4.500
|
$4.000
|
$4.440
|
$4.000
|
$5.000
|
$5.050
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,112.000
|
$3.000
|
$3.370
|
$4.000
|
$3.500
|
$3.740
|
$3.600
|
$5.000
|
$16.350
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
6,200.000
|
$1.000
|
$0.470
|
$0.750
|
$0.600
|
$0.520
|
$0.600
|
$0.550
|
$0.510
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
475.000
|
$0.100
|
$0.500
|
$0.250
|
$0.200
|
$0.560
|
$0.200
|
$0.270
|
$0.730
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
2.290
|
$48,000.000
|
$5,250.000
|
$5,500.000
|
$6,000.000
|
$16,650.000
|
$6,000.000
|
$5,500.000
|
$13,379.250
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
24,037.000
|
$70.000
|
$63.650
|
$70.000
|
$69.180
|
$67.560
|
$68.000
|
$65.000
|
$81.770
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
9,246.000
|
$70.000
|
$74.090
|
$81.000
|
$76.480
|
$78.120
|
$81.000
|
$77.000
|
$89.810
|
|
|
TACK COAT
|
GAL
|
13,984.000
|
$3.000
|
$2.960
|
$2.350
|
$2.220
|
$4.240
|
$3.000
|
$2.600
|
$4.320
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$400.000
|
$188.870
|
$2,000.000
|
$800.000
|
$1,665.000
|
$1,020.000
|
$300.000
|
$1,735.780
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,600.000
|
$7,741.640
|
$20,000.000
|
$40,092.430
|
$7,215.000
|
$33,200.000
|
$10,000.000
|
$31,001.240
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$220.000
|
$309.670
|
$200.000
|
$235.000
|
$333.000
|
$186.000
|
$250.000
|
$368.600
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$75.000
|
$77.420
|
$20.000
|
$50.000
|
$166.500
|
$64.000
|
$32.000
|
$174.760
|
|
Totals: |
$7,795,714.500
|
$7,455,639.890
|
$7,667,648.300
|
$8,013,424.336
|
$8,352,953.740
|
$8,607,624.300
|
$8,778,676.810
|
$9,334,997.466
|