County: BEXAR Highway: US 281 Date: 09/05/2024 (2 months ago) Engineer's Estimate: $2,107,017 Control Number: 0073-02-084
Project: STP 2025(006)HES District: SAN ANTONIO Time: 98 WORKING DAYS Type: HAZARD ELIMINATION & SAFETY
Bidder's List

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,107,016.96
LCR TOTAL TRANSPORT LLC   $1,732,940.00 1
-17.75% | -$374,076.96
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.   $1,846,933.22 2
-12.34% | -$260,083.74
6.58% | $113,993.22
J3 COMPANY, LLC   $1,874,559.55 3
-11.03% | -$232,457.41
8.17% | $141,619.55
1.50% | $27,626.33
DAN WILLIAMS COMPANY   $1,921,981.90 4
-8.78% | -$185,035.06
10.91% | $189,041.90
2.53% | $47,422.35
DEAN WORD COMPANY, LTD.   $2,021,212.71 5
-4.07% | -$85,804.25
16.63% | $288,272.71
5.16% | $99,230.81
TEXAS MATERIALS GROUP, INC.   $2,031,042.34 6
-3.61% | -$75,974.62
17.2% | $298,102.34
0.49% | $9,829.63
CK NEWBERRY, LLC   $2,418,794.70 7
14.8% | $311,777.74
39.58% | $685,854.70
19.09% | $387,752.36

Bid Items

Items: 96, 0 filtered
BEXAR US 281  |  SAN ANTONIO  |  0073-02-084  |  09/05/2024  |  $2,107,017  |  STP 2025(006)HES  |  HAZARD ELIM & SAFETY  |  98 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate LCR TOTAL TRANSPORT LLC SALINAS CONSTRUCTION TECHNOLOGIES, LTD. J3 COMPANY, LLC DAN WILLIAMS COMPANY DEAN WORD COMPANY, LTD. TEXAS MATERIALS GROUP, INC. CK NEWBERRY, LLC
100 7002 PREPARING ROW STA 32.000 $2,000.000 $1,575.000 $1,540.010 $1,000.000 $3,500.000 $1,643.800 $1,500.000 $1,000.000
104 7005 REMOV CONC (MOWSTRIP) LF 2,339.000 $10.000 $23.500 $5.860 $10.000 $6.500 $7.320 $4.850 $20.000
104 7006 REMOV CONC (RIPRAP) SY 64.000 $18.000 $42.500 $28.530 $30.000 $25.000 $28.450 $28.000 $70.000
104 7008 REMOV CONC (MEDIANS) SY 334.000 $16.000 $40.000 $31.660 $30.000 $20.000 $19.590 $41.000 $40.000
104 7016 REMOV CONC (CURB) LF 380.000 $7.000 $24.000 $9.710 $8.000 $7.000 $10.110 $7.700 $17.000
105 7121 RMV (12"-30") TRT/UNTRT BASE & ASPH PAV SY 3,496.000 $5.000 $13.000 $19.280 $12.000 $10.000 $22.060 $42.000 $22.000
110 7001 EXCAV (ROADWAY) CY 696.000 $25.000 $24.000 $29.410 $25.000 $30.000 $30.010 $26.000 $50.000
132 7005 EMBANK (FNL)(OC)(TY C) CY 2,774.000 $30.000 $40.500 $12.590 $35.000 $30.000 $56.650 $30.000 $50.000
161 7002 COMPOST MANUF TOPSOIL (4") SY 12,841.000 $7.000 $1.350 $3.810 $3.000 $3.500 $1.400 $3.000 $1.250
164 7009 DRILL SEED (PERM_RURAL_SAND) SY 12,841.000 $0.350 $0.350 $0.360 $1.000 $0.290 $0.310 $0.300 $0.400
164 7015 DRILL SEED (TEMP_WARM_COOL) SY 12,841.000 $0.300 $0.250 $0.310 $1.000 $0.290 $0.260 $0.250 $0.300
168 7001 VEGETATIVE WATERING TGL 302.000 $40.000 $68.000 $31.060 $33.000 $5.000 $35.630 $26.000 $20.000
169 7003 SOIL RET BLKT(SL_MOD_SAND_SHORT) SY 12,841.000 $3.000 $1.250 $1.300 $1.500 $1.750 $1.310 $1.150 $2.000
216 7001 PROOF ROLLING HR 12.000 $115.000 $122.000 $80.670 $80.000 $50.000 $78.080 $150.000 $100.000
341 7001 D-GR HMA TY-B PG64-22 TON 3,332.000 $130.000 $97.000 $100.710 $125.000 $105.000 $107.060 $120.000 $120.000
341 7051 D-GR HMA TY-D PG70-22 (LEVEL-UP) TON 748.000 $140.000 $111.000 $141.980 $145.000 $145.000 $143.860 $130.000 $175.000
341 7082 TACK COAT GAL 1,154.000 $4.000 $6.000 $7.400 $4.000 $3.500 $4.620 $3.650 $10.000
344 7031 SP MIXES SP-C SAC-B PG76-22 TON 1,683.000 $150.000 $116.000 $127.920 $145.000 $120.000 $130.720 $140.000 $175.000
344 7077 TACK COAT GAL 2,933.000 $4.200 $6.000 $5.980 $4.000 $3.500 $4.620 $3.650 $6.000
354 7066 PLANE CONC PAV(0" TO 2") SY 4,788.000 $5.000 $2.000 $4.380 $3.000 $4.500 $5.870 $3.400 $10.000
354 7068 PLANE CONC PAV(0" TO 4") SY 4,126.000 $12.000 $3.000 $4.740 $3.000 $4.500 $5.870 $4.300 $12.000
401 7001 FLOWABLE BACKFILL CY 40.000 $265.000 $270.000 $243.320 $200.000 $255.000 $213.710 $224.000 $400.000
432 7003 RIPRAP (CONC)(6 IN) CY 28.000 $600.000 $770.000 $738.300 $600.000 $575.000 $739.760 $630.000 $750.000
432 7004 RIPRAP (CONC)(CL A) CY 111.000 $400.000 $640.000 $644.870 $650.000 $475.000 $778.110 $549.000 $600.000
464 7003 RC PIPE (CL III)(18 IN) LF 123.000 $105.000 $100.000 $65.960 $120.000 $105.000 $120.560 $97.500 $125.000
464 7005 RC PIPE (CL III)(24 IN) LF 124.000 $120.000 $123.000 $78.040 $150.000 $115.000 $151.240 $129.000 $130.000
467 7308 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 2.000 $1,500.000 $2,765.000 $1,186.440 $2,000.000 $3,500.000 $2,246.660 $2,099.000 $4,000.000
467 7328 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 $2,000.000 $3,205.000 $1,441.440 $2,000.000 $3,500.000 $2,706.960 $2,349.000 $4,000.000
480 7001 CLEAN EXIST CULVERTS EA 1.000 $2,350.000 $2,500.000 $3,305.100 $1,200.000 $3,500.000 $1,615.410 $3,500.000 $3,500.000
496 7004 REMOV STR (SET) EA 2.000 $670.000 $863.000 $636.590 $800.000 $1,000.000 $770.440 $790.000 $1,000.000
496 7007 REMOV STR (PIPE) LF 4.000 $800.000 $40.000 $72.240 $250.000 $100.000 $131.510 $3,000.000 $1,000.000
500 7001 MOBILIZATION LS 1.000 $224,835.260 $165,000.000 $179,953.930 $170,000.000 $190,000.000 $203,180.350 $200,000.000 $240,000.000
502 7001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $12,000.000 $1,825.000 $2,673.300 $7,500.000 $17,000.000 $10,106.390 $18,900.000 $37,500.000
503 7002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $15,000.000 $8,800.000 $12,073.900 $5,400.000 $13,000.000 $8,219.520 $5,700.000 $10,000.000
505 7001 TMA (STATIONARY) DAY 87.000 $250.000 $250.000 $308.170 $325.000 $140.000 $383.580 $250.000 $400.000
505 7003 TMA (MOBILE OPERATION) DAY 12.000 $250.000 $375.000 $803.940 $850.000 $650.000 $657.560 $600.000 $400.000
506 7001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 160.000 $40.000 $40.000 $42.410 $35.000 $35.000 $36.600 $38.000 $50.000
506 7002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 40.000 $40.000 $54.750 $59.620 $45.000 $45.000 $47.050 $52.000 $70.000
506 7011 ROCK FILTER DAMS (REMOVE) LF 200.000 $12.000 $10.550 $11.480 $5.000 $5.000 $5.230 $10.000 $20.000
506 7021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 312.000 $50.000 $76.000 $79.510 $70.000 $68.000 $71.470 $72.000 $25.000
506 7024 CONSTRUCTION EXITS (REMOVE) SY 312.000 $8.000 $10.550 $11.620 $20.000 $20.000 $20.030 $10.000 $10.000
506 7039 TEMP SEDMT CONT FENCE (INSTALL) LF 600.000 $4.000 $3.750 $4.010 $4.000 $4.000 $4.180 $3.500 $10.000
506 7041 TEMP SEDMT CONT FENCE (REMOVE) LF 600.000 $0.800 $0.850 $1.040 $0.500 $1.000 $0.520 $0.800 $5.000
506 7045 BIODEG EROSN CONT LOGS (INSTL) (18") LF 105.000 $10.000 $13.750 $15.220 $9.500 $10.000 $9.940 $13.000 $15.000
506 7046 BIODEG EROSN CONT LOGS (REMOVE) LF 105.000 $1.600 $3.150 $4.220 $1.000 $1.000 $1.050 $3.000 $5.000
536 7002 CONC MEDIAN SY 155.000 $110.000 $125.000 $129.070 $95.000 $125.000 $137.000 $135.000 $150.000
543 7001 CABLE BARRIER SYSTEM (INSTALL)(TL-3) LF 2,696.000 $25.000 $18.500 $20.690 $22.000 $19.500 $18.300 $23.340 $20.000
543 7017 CABLE BARRIER TERM SEC (INSTL)(TL-3) EA 10.000 $3,750.000 $3,525.000 $3,762.560 $3,500.000 $4,000.000 $3,502.970 $3,000.000 $4,000.000
543 7037 CABLE BARRIER (REMOVE) LF 2,339.000 $6.000 $5.250 $5.910 $5.000 $7.000 $5.230 $5.000 $6.000
543 7038 CABLE BARRIER TERMINAL SECTION (REMOVE) EA 6.000 $800.000 $342.000 $389.820 $350.000 $1,500.000 $339.840 $1,300.000 $375.000
644 7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 18.000 $750.000 $711.000 $785.190 $705.000 $850.000 $862.680 $725.000 $1,000.000
644 7004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 3.000 $900.000 $816.000 $1,038.190 $935.000 $900.000 $914.960 $875.000 $1,000.000
644 7073 REMOVE SM RD SN SUP&AM EA 33.000 $120.000 $111.000 $149.250 $125.000 $100.000 $104.570 $125.000 $100.000
658 7058 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 4.000 $100.000 $80.000 $141.690 $120.000 $100.000 $104.570 $54.000 $100.000
658 7078 REMOVE DELIN & OBJECT MARKER ASSMS EA 6.000 $20.000 $20.000 $26.190 $15.000 $15.000 $15.690 $15.000 $20.000
662 7065 WK ZN PAV MRK REMOV (W)6"(BRK) LF 984.000 $1.700 $1.400 $1.750 $1.300 $1.500 $1.570 $1.300 $1.500
662 7068 WK ZN PAV MRK REMOV (W)6"(SLD) LF 17,111.000 $1.700 $1.000 $1.420 $0.950 $1.500 $1.570 $0.950 $1.000
662 7072 WK ZN PAV MRK REMOV (W)8"(SLD) LF 2,154.000 $2.000 $2.050 $1.420 $1.950 $2.500 $2.610 $1.950 $2.000
662 7077 WK ZN PAV MRK REMOV (W)24"(SLD) LF 121.000 $12.000 $10.600 $29.100 $10.000 $10.000 $10.460 $10.000 $10.000
662 7100 WK ZN PAV MRK REMOV (Y)6"(SLD) LF 23,833.000 $1.500 $1.000 $1.420 $0.950 $1.500 $1.570 $0.950 $1.000
666 7009 REFL PAV MRK TY I (W)6"(DOT)(100MIL) LF 399.000 $1.600 $2.650 $2.550 $2.500 $2.500 $2.610 $2.500 $2.500
666 7018 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 106.000 $4.000 $3.150 $3.390 $3.000 $3.500 $3.660 $3.000 $3.000
666 7024 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 2,068.000 $1.200 $1.350 $2.300 $1.250 $1.750 $1.830 $1.250 $1.250
666 7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 177.000 $11.000 $10.500 $17.050 $10.000 $12.000 $12.550 $10.000 $10.000
666 7042 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 11.000 $190.000 $237.000 $200.250 $225.000 $200.000 $259.400 $225.000 $225.000
666 7045 REFL PAV MRK TY I(W)(DBL ARROW)(100MIL) EA 2.000 $220.000 $237.000 $433.470 $225.000 $300.000 $259.400 $225.000 $225.000
666 7051 REFL PAV MRK TY I(W)(UTURN ARW)(100MIL) EA 2.000 $210.000 $237.000 $433.470 $225.000 $400.000 $453.960 $225.000 $225.000
666 7066 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 13.000 $210.000 $237.000 $277.330 $225.000 $250.000 $259.400 $225.000 $225.000
666 7266 RE PROFILE PM TY I(W)6"(SLD)(100MIL) LF 13,111.000 $1.400 $1.300 $2.120 $1.250 $1.750 $1.830 $1.250 $1.500
666 7270 RE PROFILE PM TY I(Y)6"(SLD)(100MIL) LF 12,805.000 $1.400 $1.300 $2.130 $1.250 $1.750 $1.830 $1.250 $1.500
666 7290 TY I HIGH PERF PM (W)6"(BRK)(100MIL) LF 3,262.000 $1.400 $0.800 $2.260 $0.750 $1.750 $1.830 $0.750 $1.000
666 7347 PAVEMENT SLER 6" LF 29,577.000 $0.500 $0.450 $0.510 $0.400 $0.500 $0.520 $0.400 $0.500
666 7348 PAVEMENT SLER 8" LF 2,174.000 $1.000 $0.600 $1.200 $0.550 $0.750 $0.780 $0.550 $0.750
666 7352 PAVEMENT SLER 24" LF 177.000 $6.000 $3.150 $4.400 $3.000 $5.000 $5.230 $3.000 $3.000
666 7353 PAVEMENT SLER (ARROW) EA 11.000 $88.000 $79.000 $123.250 $75.000 $100.000 $110.250 $75.000 $75.000
666 7354 PAVEMENT SLER (WORD) EA 13.000 $90.000 $105.250 $128.830 $100.000 $100.000 $110.250 $100.000 $100.000
666 7356 PAVEMENT SLER (DBL ARROW) EA 2.000 $90.000 $105.250 $224.470 $100.000 $125.000 $129.690 $100.000 $100.000
666 7358 PAVEMENT SLER (UTURN ARROW) EA 2.000 $90.000 $105.250 $213.470 $100.000 $150.000 $194.550 $100.000 $100.000
672 7002 REFL PAV MRKR TY I-C EA 104.000 $5.000 $6.850 $7.530 $6.500 $8.000 $8.370 $6.500 $6.500
672 7006 REFL PAV MRKR TY II-C-R EA 173.000 $5.000 $6.850 $7.160 $6.500 $8.000 $8.370 $6.500 $6.500
677 7001 ELIM EXT PM & MRKS (4") LF 16,050.000 $1.300 $0.800 $0.870 $0.750 $1.000 $1.050 $0.750 $0.750
677 7004 ELIM EXT PM & MRKS (8") LF 1,402.000 $2.500 $1.100 $1.600 $1.000 $2.000 $2.090 $1.000 $1.000
677 7008 ELIM EXT PM & MRKS (24") LF 21.000 $5.500 $5.250 $15.620 $5.000 $5.000 $5.230 $5.000 $5.000
677 7030 ELIM EXT PM & MRKS (RUMBLE STRIP) LF 2,455.000 $1.250 $2.000 $2.360 $2.000 $1.000 $1.050 $5.750 $4.500
678 7002 PAV SURF PREP FOR MRK (6") LF 29,577.000 $0.100 $0.050 $0.120 $0.050 $0.010 $0.010 $0.050 $0.050
678 7004 PAV SURF PREP FOR MRK (8") LF 2,174.000 $0.200 $0.150 $0.260 $0.100 $0.020 $0.020 $0.100 $0.100
678 7008 PAV SURF PREP FOR MRK (24") LF 177.000 $2.000 $0.500 $1.650 $0.500 $0.060 $0.060 $0.500 $0.500
678 7009 PAV SURF PREP FOR MRK (ARROW) EA 11.000 $30.000 $21.050 $63.810 $20.000 $5.000 $5.230 $20.000 $20.000
678 7010 PAV SURF PREP FOR MRK (DBL ARROW) EA 2.000 $40.000 $21.050 $158.470 $20.000 $7.000 $35.020 $20.000 $20.000
678 7012 PAV SURF PREP FOR MRK (UTURN ARR) EA 2.000 $40.000 $21.050 $103.470 $20.000 $8.000 $51.880 $20.000 $20.000
678 7016 PAV SURF PREP FOR MRK (WORD) EA 13.000 $40.000 $21.050 $84.830 $20.000 $6.000 $6.270 $20.000 $20.000
730 7019 FULL - WIDTH MOWING CYC 2.000 $2,500.000 $1,600.000 $1,870.730 $3,500.000 $800.000 $2,191.870 $3,500.000 $3,500.000
734 7002 LITTER REMOVAL CYC 6.000 $1,600.000 $2,300.000 $1,158.710 $950.000 $350.000 $1,205.530 $1,500.000 $1,600.000
738 7028 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC 6.000 $1,200.000 $1,925.000 $6,729.850 $900.000 $550.000 $547.970 $1,000.000 $1,000.000
771 7009 CABLE SPLICE / TURNBUCKLE (TL-3) EA 4.000 $300.000 $205.250 $311.450 $250.000 $350.000 $522.830 $350.000 $225.000
771 7017 CHECK / RE-TENSION CABLE (TL-3) EA 4.000 $200.000 $342.000 $381.740 $350.000 $650.000 $522.830 $275.000 $375.000
Totals: $2,107,016.96 $1,732,940.00 $1,846,933.22 $1,874,559.55 $1,921,981.90 $2,021,212.71 $2,031,042.34 $2,418,794.70