Show Job Controls
Bid Cobra

HOWARD US 87 (0069-01-057)

Items: 34

County: HOWARD
Length: N/A
Highway: US 87
District: ABILENE
Control Number: 0069-01-057
DBE Goal: N/A
Project: NH 2019(640)
Guaranty: N/A
Time: 134 WORKING DAYS
Engineer's Estimate: $1,105,870.29
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: DRAINAGE WORK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,105,870.29
$1,866,062.30
Over/Under Est: 68.74% $760,192.01
Over/Under Est: 118.39% $1,309,247.06
Amt Left: 29.42% $549,055.05
$2,547,970.00
Over/Under Est: 130.4% $1,442,099.71
Amt Left: 36.54% $681,907.70
Delta: -5.50% -$132,852.65
$2,591,069.01
Over/Under Est: 134.3% $1,485,198.72
Amt Left: 38.85% $725,006.71
Delta: -1.69% -$43,099.01
$2,992,388.40
Over/Under Est: 170.59% $1,886,518.11
Amt Left: 60.36% $1,126,326.10
Delta: -15.49% -$401,319.39

Bid Items & Bid Tabulations

34 Total 0 of 34
HOWARD  |  US 87  |  ABILENE  |  0069-01-057  |  03/05/2019  |  $1,105,870.29  |  NH 2019(640)  |  DRAINAGE WORK  |  134 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
FNH CONSTRUCTION, LLC
EARTH BUILDERS, L.P.
3LW CIVIL LLC
EXCAVATION (ROADWAY)
CY 3,306.000 $9.000 $8.000 $31.900 $20.000 $25.000 $18.820
EXCAVATION (CHANNEL)
CY 19,834.000 $6.000 $10.000 $31.960 $20.000 $25.000 $24.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 3,785.000 $17.000 $5.000 $1.160 $35.000 $10.000 $18.000
FURNISHING AND PLACING TOPSOIL (4")
SY 90,036.000 $1.500 $3.000 $3.310 $6.000 $7.000 $4.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 43,132.000 $0.600 $0.350 $0.390 $0.500 $0.500 $0.970
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 90,036.000 $0.350 $0.150 $0.200 $0.500 $0.170 $1.050
DRILL SEEDING (TEMP) (WARM)
SY 45,019.000 $0.300 $0.150 $0.180 $0.500 $0.150 $0.490
DRILL SEEDING (TEMP) (COOL)
SY 45,019.000 $0.300 $0.150 $0.180 $0.500 $0.160 $0.470
VEGETATIVE WATERING
MG 4,920.000 $35.000 $9.700 $16.270 $38.000 $62.000 $72.130
TRENCH EXCAVATION PROTECTION
LF 529.000 $18.000 $30.000 $10.470 $4.000 $1.000 $35.000
CL A CONC (PLUG)
EA 2.000 $800.000 $10,000.000 $1,992.980 $1,500.000 $1,000.000 $3,797.500
RIPRAP (CONC)(5 IN)
CY 62.000 $475.000 $1,250.000 $650.850 $650.000 $650.000 $800.000
GABION MATTRESSES (GALV) (24 IN)
SY 1,025.000 $190.000 $150.000 $182.370 $200.000 $180.000 $350.000
CONC BOX CULV (3 FT X 3 FT)
LF 292.000 $175.000 $450.000 $447.480 $450.000 $250.000 $303.000
RC PIPE (CL III)(18 IN)
LF 52.000 $75.000 $250.000 $91.770 $85.000 $70.000 $107.000
RC PIPE (CL III)(30 IN)
LF 53.000 $92.000 $300.000 $156.240 $105.000 $150.000 $160.000
MANH (COMPL)(TY A)
EA 1.000 $3,400.000 $10,000.000 $12,901.460 $5,500.000 $4,000.000 $4,500.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $11,600.000 $50,000.000 $12,928.880 $7,500.000 $10,000.000 $20,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $6,500.000 $30,000.000 $10,802.140 $15,000.000 $5,000.000 $6,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,200.000 $5,000.000 $999.770 $2,000.000 $1,000.000 $1,004.000
SET (TY II) (30 IN) (RCP) (4: 1) (P)
EA 2.000 $1,465.000 $5,500.000 $1,797.770 $4,500.000 $1,800.000 $3,248.000
JACK BOR OR TUN PIPE(30 IN)(RC)(CL III)
LF 115.000 $665.000 $1,200.000 $1,397.810 $1,400.000 $1,400.000 $1,850.000
JACK BOR TUN BOX CULV (3 FT X 3 FT)
LF 70.000 $190.000 $2,100.000 $2,547.000 $2,250.000 $2,500.000 $2,864.000
REMOV STR (WINGWALL)
EA 2.000 $1,700.000 $5,000.000 $2,333.250 $5,000.000 $1,000.000 $1,267.000
MOBILIZATION
LS 1.000 $37,090.090 $185,000.000 $407,665.000 $250,000.000 $250,000.000 $295,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $1,500.000 $20,000.000 $5,394.710 $8,500.000 $4,500.000 $25,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 175.000 $70.000 $65.000 $28.230 $30.000 $35.000 $32.000
ROCK FILTER DAMS (REMOVE)
LF 175.000 $13.000 $25.000 $8.980 $15.000 $12.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 204.000 $24.000 $35.000 $22.630 $30.000 $20.000 $23.000
CONSTRUCTION EXITS (REMOVE)
SY 204.000 $14.000 $15.000 $8.880 $15.000 $8.000 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,010.000 $3.000 $2.500 $2.810 $4.000 $3.200 $3.530
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,010.000 $1.000 $1.500 $0.890 $2.000 $1.100 $1.350
TMA (STATIONARY)
DAY 10.000 $500.000 $3,500.000 $507.810 $550.000 $500.000 $270.000
TMA (MOBILE OPERATION)
DAY 10.000 $300.000 $3,500.000 $492.910 $850.000 $500.000 $280.000
Totals: $1,105,870.290 $1,866,062.300 $2,415,117.350 $2,547,970.000 $2,591,069.010 $2,992,388.400