MIDLAND CS (0906-32-057)

Items: 58

County: MIDLAND
Length: N/A
Highway: CS
District: ODESSA
Control Number: 0906-32-057
DBE Goal: N/A
Project: STP 2019(481)TAPS
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $767,307.59
Date: 06/05/2019 (7 years ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$767,307.59
$834,326.50
Over/Under Est: 8.73% $67,018.91
$1,164,156.00
Over/Under Est: 51.72% $396,848.41
Amt Left: 39.53% $329,829.50
Over/Under Est: 146.72% $1,125,816.62
Amt Left: 126.9% $1,058,797.71
Delta: -62.62% -$728,968.21

Bid Items & Bid Tabulations

58 Total 0 of 58
MIDLAND  |  CS  |  ODESSA  |  0906-32-057  |  06/05/2019  |  $767,307.59  |  STP 2019(481)TAPS  |  BICYCLE AND PEDESTRIAN IMPRVS  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
REMOVING CONC (PAV)
SY 2,499.000 $25.000 $12.000 $20.000 $104.610
REMOVING CONC (CURB OR CURB & GUTTER)
LF 667.000 $7.000 $10.000 $20.000 $28.880
REMOVING CONC (SIDEWALK OR RAMP)
SY 578.000 $14.000 $20.000 $20.000 $34.190
REMOVING STAB BASE & ASPH PAV (8"-14")
SY 136.000 $4.000 $12.000 $20.000 $84.040
FL BS (CMP IN PLC)(TY A GR 4) (6")
SY 2,064.000 $12.000 $15.000 $30.000 $42.670
CONC PVMT (CONT REINF - CRCP) (8")
SY 1,919.000 $85.000 $120.000 $110.000 $212.990
CURB (TYPE II)
LF 1,005.000 $50.000 $15.000 $25.000 $57.960
RIPRAP (MOW STRIP)(6 IN)
CY 1.250 $500.000 $1,200.000 $2,000.000 $3,178.840
RAIL (HANDRAIL)(TY B)
LF 34.000 $155.000 $150.000 $185.000 $230.850
CAST-IN-PLACE TRENCH DRAIN
LF 464.000 $280.000 $250.000 $300.000 $375.400
ADJUSTING MANHOLES
EA 4.000 $600.000 $800.000 $2,500.000 $2,881.860
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $525.000 $500.000 $1,000.000 $1,176.340
ADJUSTING MANHOLES (ELECTRIC BOX)
EA 7.000 $650.000 $600.000 $650.000 $2,400.090
MOBILIZATION
LS 1.000 $34,950.840 $50,000.000 $110,000.000 $357,616.450
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $2,500.000 $10,000.000 $8,500.000 $6,054.900
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 154.000 $6.000 $4.000 $18.000 $14.300
BIODEG EROSN CONT LOGS (REMOVE)
LF 154.000 $2.500 $1.000 $9.000 $3.300
COLORED TEXTURED CONC (4")
SY 275.000 $95.000 $120.000 $200.000 $171.380
DRIVEWAYS (CONC)
SY 61.000 $95.000 $80.000 $100.000 $259.430
CONC SIDEWALKS (4")
SY 625.000 $80.000 $80.000 $70.000 $120.400
CURB RAMPS (TY 1)
EA 3.000 $1,850.000 $1,400.000 $2,500.000 $3,278.560
CURB RAMPS (TY 6)
EA 1.000 $1,800.000 $1,500.000 $2,500.000 $3,316.860
CURB RAMPS (TY 7)
EA 20.000 $1,755.000 $1,500.000 $2,500.000 $2,526.350
CURB RAMPS (TY 21)
EA 1.000 $2,800.000 $2,100.000 $2,500.000 $3,356.330
CONC MEDIAN(MONO NOSE)
SY 2.000 $250.000 $400.000 $200.000 $1,898.790
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $775.000 $700.000 $850.000 $679.580
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 2.000 $150.000 $150.000 $650.000 $731.970
REMOVE SM RD SN SUP&AM
EA 1.000 $80.000 $100.000 $150.000 $181.970
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 9.000 $100.000 $100.000 $450.000 $101.350
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 141.000 $1.100 $1.000 $1.000 $2.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,060.000 $0.800 $1.000 $6.000 $1.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,622.000 $14.000 $6.000 $20.000 $6.700
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 45.000 $200.000 $150.000 $250.000 $168.770
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 24.000 $36.000 $50.000 $250.000 $48.710
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
EA 53.000 $125.000 $150.000 $250.000 $142.020
REFL PAV MRK TY I(W)(BIKE SYML)(100MIL)
EA 53.000 $250.000 $100.000 $250.000 $307.020
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 109.000 $3.200 $3.000 $6.000 $4.860
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 450.000 $0.400 $0.500 $1.000 $1.150
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 7,261.000 $0.400 $0.500 $1.000 $0.790
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,320.000 $0.300 $0.500 $1.000 $0.900
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,230.000 $0.350 $0.500 $1.000 $0.800
REFL PAV MRKR TY I-C
EA 28.000 $3.000 $3.000 $15.000 $17.060
REFL PAV MRKR TY II-A-A
EA 5.000 $2.750 $3.000 $15.000 $44.940
PAV SURF PREP FOR MRK (4")
LF 15,261.000 $0.100 $0.500 $1.000 $0.560
PAV SURF PREP FOR MRK (8")
LF 1,060.000 $0.150 $0.500 $1.000 $1.260
PAV SURF PREP FOR MRK (12")
LF 109.000 $0.400 $0.500 $1.000 $3.210
PAV SURF PREP FOR MRK (24")
LF 1,622.000 $1.250 $1.000 $1.000 $3.400
PAV SURF PREP FOR MRK (ARROW)
EA 45.000 $17.500 $15.000 $100.000 $31.270
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 24.000 $3.500 $20.000 $100.000 $12.570
PAV SURF PREP FOR MRK (BIKE ARROW)
EA 53.000 $12.500 $5.000 $100.000 $25.200
PAV SURF PREP FOR MRK (BIKE SYMBOL)
EA 53.000 $9.000 $5.000 $100.000 $30.700
TREE PROTECTION
EA 12.000 $265.000 $250.000 $500.000 $548.290
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 2.500 $300.000 $400.000 $1,000.000 $1,159.970
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 2.500 $300.000 $400.000 $1,000.000 $1,159.970
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 240.000 $60.000 $90.000 $150.000 $92.140
TMA (STATIONARY)
DAY 120.000 $140.000 $200.000 $550.000 $470.720
TMA (MOBILE OPERATION)
HR 32.000 $120.000 $50.000 $85.000 $109.300
FIRE HYDRANT RELOCATE & RECONNECT
EA 1.000 $2,600.000 $15,000.000 $10,000.000 $5,952.500
Totals: $767,307.590 $834,326.500 $1,164,156.000 $1,893,124.220