Show Job Controls
Bid Cobra

KARNES FM0791 (6343-57-001)

Items: 19

County: KARNES
Length: N/A
Highway: FM0791
District: CORPUS CHRISTI
Control Number: 6343-57-001
DBE Goal: N/A
Project: BPM - 634357001
Guaranty: N/A
Time: 68 W
Engineer's Estimate: $293,245.39
Date: 02/19/2020 (6 years ago)
Contract Number: N/A
Type: CONCRETE STRUCTURE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$293,245.39
$836,534.10
Over/Under Est: 185.27% $543,288.71
Over/Under Est: 191.32% $561,022.46
Amt Left: 2.12% $17,733.75
Over/Under Est: 206.54% $605,671.61
Amt Left: 7.46% $62,382.90
Delta: -5.23% -$44,649.15
Over/Under Est: 215.48% $631,893.61
Amt Left: 10.59% $88,604.90
Delta: -2.92% -$26,222.00
Over/Under Est: 224.86% $659,384.61
Amt Left: 13.88% $116,095.90
Delta: -2.97% -$27,491.00
$1,192,592.15
Over/Under Est: 306.69% $899,346.76
Amt Left: 42.56% $356,058.05
Delta: -25.19% -$239,962.15

Bid Items & Bid Tabulations

19 Total 0 of 19
KARNES  |  FM0791  |  CORPUS CHRISTI  |  6343-57-001  |  02/19/2020  |  $293,245.39  |  BPM - 634357001  |  CONC STRUCT REPAIR  |  68 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
CHAMPION INFRASTRUCTURE, LLC
TALBRAN ENTERPRISES LLC
TIERRA LEASE SERVICE, LLC
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 8.870 $1,000.000 $2,500.000 $559.860 $2,100.000 $2,500.000 $5,000.000 $3,945.000
REMOVING CONC (RIPRAP)
CY 34.000 $110.000 $150.000 $452.240 $240.000 $725.000 $100.000 $200.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 165.000 $30.000 $100.000 $38.810 $65.000 $150.000 $100.000 $100.000
FLOWABLE BACKFILL
CY 54.000 $450.000 $350.000 $182.420 $440.000 $150.000 $300.000 $350.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 307.000 $215.000 $225.000 $159.460 $240.000 $127.000 $215.000 $500.000
RIPRAP (CONC)(5 IN)
CY 54.000 $600.000 $500.000 $604.090 $900.000 $200.000 $700.000 $650.000
RIPRAP (STONE TY F)(DRY)(18")
CY 275.000 $200.000 $200.000 $177.050 $230.000 $275.000 $300.000 $220.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 91.000 $40.000 $75.000 $169.910 $65.000 $200.000 $125.000 $100.000
CLEAN & PAINT EXIST STR (SYSTEM III-B)
LS 1.000 $17,700.000 $415,493.100 $425,609.700 $418,000.000 $472,151.000 $425,000.000 $450,000.000
CLEAN & PAINT EXIST PILING(SYS III-B)
LS 1.000 $5,580.000 $60,606.000 $79,723.500 $88,000.000 $79,099.000 $73,500.000 $90,000.000
MOBILIZATION
LS 1.000 $18,268.390 $70,000.000 $91,905.970 $65,000.000 $75,000.000 $80,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,500.000 $7,500.000 $3,508.990 $7,000.000 $3,000.000 $5,000.000 $8,500.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 12.000 $34.000 $125.000 $101.930 $200.000 $125.000 $200.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $8.000 $30.000 $95.150 $200.000 $125.000 $50.000 $100.000
INSTL OM ASSM (OM-3L)(FLX)GND
EA 2.000 $150.000 $30.000 $380.580 $200.000 $125.000 $250.000 $100.000
INSTL OM ASSM (OM-3R)(FLX)GND
EA 2.000 $150.000 $30.000 $380.580 $200.000 $125.000 $250.000 $100.000
TREE REMOVAL (4" - 12" DIA)
EA 52.000 $400.000 $375.000 $623.380 $400.000 $500.000 $1,000.000 $2,000.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 3.000 $200.000 $500.000 $967.280 $400.000 $200.000 $500.000 $1,000.000
TMA (STATIONARY)
DAY 68.000 $240.000 $250.000 $321.270 $300.000 $500.000 $275.000 $350.000
Totals: $293,245.390 $836,534.100 $854,267.858 $898,917.000 $925,139.000 $952,630.000 $1,192,592.150