Job Info for 0915-18-024

County: FRIO Highway: CR Date: 02/05/2019 (5 years ago) Engineer's Estimate: $557,192 Control Number: 0915-18-024
Project: BR 2007(141) District: SAN ANTONIO Time: 72 WORKING DAYS Type: REPLACE BRIDGE AND APPROACHES

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $557,191.70
ENCINO LANDSCAPE, INC.   $572,306.50 1
2.71% | $15,114.80
SB CONTRACTORS LLC   $735,231.50 2
31.95% | $178,039.80
28.47% | $162,925.00
WINTERS CONSTRUCTION, INC.   $782,735.00 3
40.48% | $225,543.30
36.77% | $210,428.50
6.46% | $47,503.50
STATELINE CONSTRUCTION, LLC   $787,381.63 4
41.31% | $230,189.93
37.58% | $215,075.13
0.59% | $4,646.63
FNH CONSTRUCTION, LLC   $788,356.00 5
41.49% | $231,164.30
37.75% | $216,049.50
0.12% | $974.37
ACME BRIDGE COMPANY, INC.   $866,605.70 6
55.53% | $309,414.00
51.42% | $294,299.20
9.93% | $78,249.70
ANGEL BROTHERS HOLDINGS CORP.   $997,031.50 7
78.94% | $439,839.80
74.21% | $424,725.00
15.05% | $130,425.80
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.   $1,017,651.17 8
82.64% | $460,459.47
77.82% | $445,344.67
2.07% | $20,619.67

Bid Items

Items: 56, 0 filtered
FRIO CR  |  SAN ANTONIO  |  0915-18-024  |  02/05/2019  |  $557,192  |  BR 2007(141)  |  REPLACE BRIDGE AND APPROACHES  |  72 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ENCINO LANDSCAPE, INC. SB CONTRACTORS LLC WINTERS CONSTRUCTION, INC. STATELINE CONSTRUCTION, LLC FNH CONSTRUCTION, LLC ACME BRIDGE COMPANY, INC. ANGEL BROTHERS HOLDINGS CORP. SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
100 6002 PREPARING ROW STA 3.800 $3,000.000 $3,500.000 $4,000.000 $2,000.000 $1,626.940 $14,000.000 $7,230.000 $4,500.000 $1,404.480
100 6006 PREP ROW (TREE)(LESS THAN 24" DIA) EA 4.000 $600.000 $800.000 $1,500.000 $750.000 $1,030.390 $1,500.000 $1,310.000 $780.000 $1,536.480
100 6007 PREP ROW (TREE)(GREATER THAN 24" DIA) EA 1.000 $1,400.000 $1,600.000 $3,500.000 $1,500.000 $2,060.790 $3,000.000 $5,050.000 $1,800.000 $6,145.920
105 6037 REMOVING STAB BASE AND ASPH PAV(0"-16") SY 628.000 $8.000 $15.000 $8.000 $30.000 $29.000 $20.000 $7.300 $16.000 $13.150
110 6001 EXCAVATION (ROADWAY) CY 201.000 $10.000 $15.000 $22.000 $25.000 $19.340 $20.000 $50.000 $55.000 $28.930
110 6002 EXCAVATION (CHANNEL) CY 38.000 $15.000 $15.000 $22.000 $25.000 $51.150 $30.000 $72.700 $125.000 $134.770
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 18.000 $12.000 $7.000 $10.000 $25.000 $368.310 $35.000 $102.000 $140.000 $179.360
161 6017 COMPOST MANUF TOPSOIL (4") SY 267.000 $1.400 $2.000 $14.000 $3.000 $13.970 $10.000 $9.400 $18.000 $22.430
164 6023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 267.000 $0.500 $0.350 $4.000 $2.000 $6.750 $5.000 $8.500 $10.500 $4.830
164 6029 CELL FBR MLCH SEED(TEMP)(WARM) SY 134.000 $0.500 $0.350 $8.000 $2.000 $8.000 $5.000 $9.300 $10.500 $9.650
164 6031 CELL FBR MLCH SEED(TEMP)(COOL) SY 134.000 $0.500 $0.350 $8.000 $2.000 $8.000 $5.000 $9.300 $10.500 $9.650
168 6001 VEGETATIVE WATERING MG 6.400 $25.000 $20.000 $55.000 $20.000 $153.310 $200.000 $151.000 $135.000 $183.380
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 15.000 $1.500 $10.000 $10.000 $5.000 $35.080 $10.000 $9.300 $13.000 $20.870
216 6001 PROOF ROLLING HR 2.000 $125.000 $100.000 $55.000 $85.000 $3,314.790 $250.000 $83.500 $106.000 $296.360
247 6475 FL BS (CIP)(TY D GR 1-2, OR 5)FINAL POS CY 152.000 $75.000 $100.000 $100.000 $70.000 $65.660 $65.000 $126.000 $158.000 $125.960
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 171.000 $5.000 $5.000 $12.000 $25.000 $23.150 $10.000 $12.000 $26.000 $12.210
316 6224 AGGR(TY-PB GR-4 SAC-B) CY 8.000 $150.000 $100.000 $1,200.000 $550.000 $335.210 $300.000 $1,170.000 $1,000.000 $828.380
316 6413 ASPH(AC-15P, HFRS-2P OR CRS-2P) GAL 219.000 $5.000 $5.000 $41.000 $25.000 $23.610 $10.000 $42.600 $19.000 $10.590
400 6005 CEM STABIL BKFL CY 58.000 $110.000 $150.000 $155.000 $150.000 $275.000 $250.000 $264.000 $310.000 $133.620
402 6001 TRENCH EXCAVATION PROTECTION LF 126.000 $3.500 $10.000 $14.000 $5.000 $22.270 $5.000 $46.900 $64.000 $33.410
416 6004 DRILL SHAFT (36 IN) LF 402.000 $175.000 $150.000 $375.000 $425.000 $424.860 $330.000 $313.000 $510.000 $414.790
420 6013 CL C CONC (ABUT) CY 33.600 $850.000 $800.000 $1,000.000 $650.000 $1,100.000 $900.000 $1,280.000 $1,400.000 $1,478.470
422 6001 REINF CONC SLAB SF 2,080.000 $15.000 $18.000 $20.000 $20.000 $20.020 $16.000 $39.100 $35.000 $46.360
422 6015 APPROACH SLAB CY 38.500 $500.000 $500.000 $425.000 $500.000 $650.000 $900.000 $922.000 $645.000 $895.010
425 6036 PRESTR CONC GIRDER (TX34) LF 318.000 $150.000 $150.000 $190.000 $265.000 $275.000 $135.000 $277.000 $219.000 $264.480
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 16.000 $500.000 $600.000 $500.000 $500.000 $500.000 $180.000 $935.000 $700.000 $634.100
450 6006 RAIL (TY T223) LF 196.000 $110.000 $150.000 $100.000 $200.000 $84.400 $125.000 $123.000 $140.000 $231.710
454 6001 SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF 52.000 $90.000 $90.000 $80.000 $125.000 $145.940 $10.000 $142.000 $152.000 $185.200
459 6001 GABIONS (GALV) CY 373.000 $300.000 $275.000 $245.000 $375.000 $99.220 $300.000 $317.000 $440.000 $338.730
459 6007 GABION MATTRESSES (GALV)(12 IN) SY 95.000 $90.000 $100.000 $140.000 $75.000 $53.770 $185.000 $208.000 $200.000 $434.730
496 6017 REMOV STR (ABUTMENT) EA 2.000 $5,000.000 $5,000.000 $6,000.000 $3,000.000 $10,000.000 $10,000.000 $4,160.000 $1,000.000 $5,050.300
496 6034 REMOV STR (BENT) EA 2.000 $3,000.000 $5,000.000 $1,200.000 $5,000.000 $6,000.000 $10,000.000 $3,120.000 $3,500.000 $7,542.200
500 6001 MOBILIZATION LS 1.000 $50,000.000 $50,000.000 $73,000.000 $75,000.000 $78,738.160 $70,000.000 $70,000.000 $115,000.000 $130,244.250
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $1,500.000 $7,500.000 $3,500.000 $2,000.000 $1,912.560 $5,000.000 $1,520.000 $600.000 $762.800
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 23.000 $30.000 $50.000 $50.000 $65.000 $311.800 $30.000 $213.000 $55.000 $53.330
506 6011 ROCK FILTER DAMS (REMOVE) LF 23.000 $10.000 $10.000 $10.000 $30.000 $155.900 $15.000 $106.000 $10.000 $15.930
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 112.000 $25.000 $25.000 $15.000 $10.000 $119.260 $40.000 $81.500 $15.000 $15.310
506 6024 CONSTRUCTION EXITS (REMOVE) SY 112.000 $8.000 $10.000 $6.000 $5.000 $56.120 $20.000 $38.300 $7.000 $6.950
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 555.000 $3.000 $3.000 $3.500 $5.000 $10.910 $4.000 $8.000 $3.000 $2.950
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 555.000 $0.750 $0.750 $0.500 $3.000 $5.460 $2.000 $3.750 $0.500 $0.750
506 6040 BIODEG EROSN CONT LOGS (INSTL) (8") LF 399.000 $4.250 $4.000 $6.000 $3.000 $9.950 $15.000 $7.500 $7.000 $6.170
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 399.000 $1.100 $1.000 $1.000 $1.000 $2.830 $9.000 $3.750 $1.000 $1.380
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 175.000 $25.000 $25.000 $28.000 $35.000 $32.740 $25.000 $22.400 $35.000 $33.810
540 6007 MTL BEAM GD FEN TRANS (TL2) EA 2.000 $1,100.000 $1,200.000 $1,000.000 $2,000.000 $1,481.040 $1,850.000 $1,010.000 $1,300.000 $986.240
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $1,200.000 $1,200.000 $925.000 $1,500.000 $1,948.730 $1,850.000 $1,330.000 $1,200.000 $1,387.740
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 2.000 $1,000.000 $1,000.000 $700.000 $1,000.000 $1,130.270 $1,850.000 $772.000 $900.000 $936.740
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 1.000 $250.000 $250.000 $200.000 $250.000 $311.800 $800.000 $213.000 $250.000 $663.480
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 2.000 $2,600.000 $2,500.000 $2,800.000 $2,500.000 $3,741.570 $2,850.000 $2,560.000 $3,500.000 $3,483.240
552 6003 WIRE FENCE (TY C) LF 240.000 $15.000 $14.000 $25.000 $30.000 $30.790 $5.000 $12.800 $30.000 $13.670
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 8.000 $550.000 $400.000 $555.000 $600.000 $779.490 $650.000 $532.000 $735.000 $591.680
644 6076 REMOVE SM RD SN SUP&AM EA 1.000 $100.000 $100.000 $200.000 $200.000 $116.930 $50.000 $79.900 $250.000 $176.350
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 6.000 $25.000 $20.000 $15.000 $30.000 $15.590 $100.000 $10.700 $20.000 $46.410
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 14.000 $25.000 $20.000 $15.000 $30.000 $15.590 $1,000.000 $10.700 $20.000 $35.610
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 14.000 $30.000 $20.000 $15.000 $30.000 $15.590 $100.000 $10.700 $20.000 $43.710
4066 6001 RELOCATE EXISTING TRUSS BRIDGE LS 1.000 $50,000.000 $20,000.000 $60,000.000 $20,000.000 $45,000.000 $35,000.000 $33,300.000 $47,000.000 $58,860.450
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 20.000 $110.000 $200.000 $300.000 $300.000 $253.140 $150.000 $63.900 $100.000 $113.100
Totals: $557,191.70 $572,306.50 $735,231.50 $782,735.00 $787,381.64 $788,356.00 $866,605.70 $997,031.50 $1,017,651.18