0937-01-027
|
HOUSTON
|
LUFKIN
|
$5,065,573
|
FM 227
|
STP 2026(660)HES
|
06/03/2026
|
04/01/2026
|
HAZARD ELIM & SAFETY
|
PINTO CONSTRUCTION CO., INC.
($4,462,648)
|
|
|
0190-05-078
|
SMITH
|
TYLER
|
$1,960,952
|
US 69
|
F 2026(646)
|
06/02/2026
|
04/01/2026
|
INTERS IMPRVS WITH RIGHT AND/OR LEFT...
|
ICOS MANAGEMENT, LLC
($2,362,671)
|
|
|
0274-02-032
|
LAMPASAS
|
BROWNWOOD
|
$5,557,277
|
US 183
|
STP 2026(645)HES
|
06/02/2026
|
04/01/2026
|
WIDEN ROAD - ADD SHOULDERS
|
BIG CREEK CONSTRUCTION, LTD.
($4,510,688)
|
|
|
0315-03-070
|
GRIMES
|
BRYAN
|
$1,274,704
|
SH 90
|
F 2026(081)
|
06/02/2026
|
04/01/2026
|
INSTL LEFT AND RIGHT TURN LANES
|
LARRY YOUNG PAVING, INC.
($1,241,183)
|
|
|
6500-39-001
|
HENDERSON
|
TYLER
|
$1,086,902
|
SH0031
|
RMC - A00220775
|
06/02/2026
|
04/22/2026
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($977,218)
|
|
|
6500-40-001
|
SMITH
|
TYLER
|
$5,179,659
|
SH0110
|
RMC - A00220776
|
06/02/2026
|
04/22/2026
|
MILL AND INLAY
|
TEXAS MATERIALS GROUP, INC.
($5,091,894)
|
|
|
0110-01-052
|
WALKER
|
BRYAN
|
$2,628,065
|
SH 75
|
STP 2026(528)HES
|
05/07/2026
|
03/02/2026
|
INSTL SAFETY LIGHTING AND TURN BAY
|
BIG CREEK CONSTRUCTION, LTD.
($2,980,129)
|
|
|
6488-81-001
|
ROBERTSON
|
BRYAN
|
$2,801,463
|
SH0006
|
RMC - A00217203
|
05/07/2026
|
03/28/2026
|
MILL AND INLAY
|
LONE STAR PAVING COMPANY
($2,266,508)
|
|
|
0209-01-076
|
MCLENNAN
|
WACO
|
$9,476,549
|
US 77
|
F 2026(605)
|
05/06/2026
|
03/02/2026
|
RESURF ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($5,957,588)
|
|
|
1186-02-028
|
BASTROP
|
AUSTIN
|
$3,339,794
|
FM 969
|
STP 2026(607)VRU
|
05/06/2026
|
03/02/2026
|
HAZARD ELIM & SAFETY
|
HUNTER INDUSTRIES, LTD.
($3,189,429)
|
|
|
1410-01-026
|
AUSTIN
|
YOAKUM
|
$2,755,374
|
FM 1456
|
STP 2026(573)HES
|
05/06/2026
|
03/02/2026
|
HAZARD ELIM & SAFETY
|
BIG CREEK CONSTRUCTION, LTD.
($2,587,895)
|
|
|
6500-76-001
|
RUSK
|
TYLER
|
$2,414,500
|
US0259
|
MMC - A00220915
|
05/06/2026
|
03/31/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($2,302,000)
|
|
|
6500-78-001
|
HENDERSON
|
TYLER
|
$1,826,000
|
US0175
|
MMC - A00220936
|
05/06/2026
|
03/28/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,561,000)
|
|
|
6499-92-001
|
BROWN
|
BROWNWOOD
|
$276,048
|
US0377
|
MMC - A00220540
|
04/22/2026
|
03/05/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($202,600)
|
|
|
0114-10-108
|
WASHINGTON
|
BRYAN
|
$6,122,429
|
US 290
|
F 2025(700)
|
04/08/2026
|
02/02/2026
|
MILL AND INLAY
|
DURWOOD GREENE CONSTRUCTION CO.
($6,537,278)
|
|
|
0909-40-081
|
LIMESTONE
|
WACO
|
$2,205,161
|
CR 104
|
BR 2024(452)
|
04/08/2026
|
02/02/2026
|
BRIDGE REPL
|
TUCAN CONTRACTING, LLC
($1,810,423)
|
|
|
1745-01-020
|
WALLER
|
HOUSTON
|
$848,686
|
FM 1887
|
F 2026(394)
|
04/08/2026
|
02/02/2026
|
RESURF ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($1,140,623)
|
|
|
6489-29-001
|
ELLIS
|
DALLAS
|
$1,437,046
|
BU0287S
|
RMC - A00217348
|
04/08/2026
|
01/09/2026
|
FLEXIBLE PAVMT STRUCT REPAIR
|
KNIFE RIVER CORPORATION - SOUTH
($1,143,764)
|
|
|
0181-03-029
|
CALLAHAN
|
ABILENE
|
$10,675,511
|
SH 36
|
F 2026(503)
|
04/07/2026
|
02/02/2026
|
WIDEN ROAD - ADD LANES
|
BIG CREEK CONSTRUCTION, LTD.
($11,487,762)
|
|
|
0909-38-100
|
FALLS
|
WACO
|
$1,388,814
|
CR 325
|
BR 2023(431)
|
04/07/2026
|
02/02/2026
|
BRIDGE REPL
|
BLACKSMITH VENTURES LLC
($1,047,281)
|
|
|
1388-01-010
|
RUSK
|
TYLER
|
$8,986,324
|
FM 1251
|
F 2026(471)
|
04/07/2026
|
02/02/2026
|
ROADWAY REHAB/RECON WITH NO ADDE
|
DRAKE COMPANIES LLC
($8,734,908)
|
|
|
6499-43-001
|
SMITH
|
TYLER
|
$3,173,000
|
US0069
|
MMC - A00220299
|
04/07/2026
|
02/25/2026
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($3,196,200)
|
|
|
6498-46-001
|
LAMPASAS
|
BROWNWOOD
|
$388,000
|
US0281
|
MMC - A00220013
|
03/24/2026
|
02/10/2026
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($193,750)
|
|
|
6491-05-001
|
ROBERTSON
|
BRYAN
|
$2,222,205
|
US0079
|
RMC - A00217747
|
03/05/2026
|
09/01/2025
|
MILL AND INLAY
|
TEXAS MATERIALS GROUP, INC.
($2,329,117)
|
|
|
0419-01-019
|
HILL
|
WACO
|
$4,131,287
|
SH 171
|
F 2026(418)
|
03/04/2026
|
01/09/2026
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($3,387,033)
|
|
|
0724-02-024
|
BOSQUE
|
WACO
|
$17,109,785
|
FM 219
|
BR 2026(416)
|
03/04/2026
|
01/09/2026
|
REPLACE BRIDGE AND APPROACHES
|
KNIFE RIVER CORPORATION - SOUTH
($14,455,829)
|
|
|
6494-46-001
|
AUSTIN
|
YOAKUM
|
$999,750
|
IH0010
|
MMC - A00218604
|
02/17/2026
|
12/01/2025
|
HOT MIX
|
QUALITY HOT MIX, INC.
($967,500)
|
|
|
0048-03-099
|
ELLIS
|
DALLAS
|
$6,141,865
|
US 77
|
F 2024(968)
|
02/05/2026
|
12/01/2025
|
REHAB EXIST ROADWAY
|
PEACHTREE CONSTRUCTION, LTD.
($5,401,081)
|
|
|
0057-05-033
|
FREESTONE
|
BRYAN
|
$1,370,336
|
US 84
|
STP 2026(114)HES
|
02/05/2026
|
12/01/2025
|
INTERS IMPRVS ADDING RIGHT TURN LANE...
|
BIG CREEK CONSTRUCTION, LTD.
($1,716,130)
|
|
|
0450-02-014
|
RUSK
|
TYLER
|
$12,659,927
|
SH 204
|
F 2026(331)
|
02/05/2026
|
12/01/2025
|
HWY IMPRV
|
PINTO CONSTRUCTION CO., INC.
($10,286,588)
|
|
|
6494-87-001
|
BROWN
|
BROWNWOOD
|
$1,499,179
|
US0377
|
RMC - A00218660
|
02/05/2026
|
12/04/2025
|
MILL AND INLAY
|
ALLEN KELLER COMPANY
($1,025,505)
|
|
|
0150-05-051
|
BURNET
|
AUSTIN
|
$3,213,452
|
SH 29
|
F 2026(153)
|
02/04/2026
|
12/01/2025
|
PREVENT MAINT
|
LONE STAR PAVING COMPANY
($2,897,632)
|
|
|
6491-79-001
|
MCLENNAN
|
WACO
|
$661,759
|
SH0006
|
RMC - A00217948
|
01/14/2026
|
10/01/2025
|
BASE FAILURE PAVMT REPAIR
|
TEXAS MATERIALS GROUP, INC.
($669,246)
|
|
|
6491-80-001
|
HILL
|
WACO
|
$820,761
|
FM0308
|
RMC - A00217949
|
01/14/2026
|
10/01/2025
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($734,700)
|
|
|
6492-19-001
|
BELL
|
WACO
|
$671,014
|
US0190
|
RMC - A00218027
|
01/14/2026
|
10/01/2025
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($527,000)
|
|
|
6492-20-001
|
CORYELL
|
WACO
|
$736,525
|
US0084
|
RMC - A00218028
|
01/14/2026
|
11/01/2025
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($555,360)
|
|
|
6493-72-001
|
BELL
|
WACO
|
$788,902
|
US0190
|
MMC - A00218381
|
01/14/2026
|
11/19/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($761,450)
|
|
|
6489-61-001
|
NAVARRO
|
DALLAS
|
$537,800
|
SH0031
|
MMC - A00217504
|
01/14/2026
|
11/01/2025
|
ASPH
|
KNIFE RIVER CORPORATION - SOUTH
($527,900)
|
|
|
0890-05-009
|
ANDERSON
|
TYLER
|
$1,940,375
|
FM 3309
|
F 2026(218)
|
01/07/2026
|
11/01/2025
|
REHAB EXIST ROADWAY
|
BAKER & COMPANY CONSTRUCTION, LLC
($1,861,683)
|
|
|
6491-85-001
|
FALLS
|
WACO
|
$1,743,375
|
SH0014
|
MMC - A00217955
|
01/07/2026
|
10/01/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,531,500)
|
|
|
0054-06-114
|
BROWN
|
BROWNWOOD
|
$1,977,368
|
US 67
|
F 2026(208)
|
01/06/2026
|
11/01/2025
|
RESURF ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($1,931,829)
|
|
|
0211-06-068
|
FAYETTE
|
YOAKUM
|
$4,163,925
|
US 77
|
C 211-6-68
|
01/06/2026
|
11/01/2025
|
REHAB EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($4,335,114)
|
|
|
0492-04-047
|
SMITH
|
TYLER
|
$2,636,546
|
FM 756
|
F 2026(219)
|
01/06/2026
|
11/01/2025
|
RESURF ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($3,056,756)
|
|
|
6491-83-001
|
MCLENNAN
|
WACO
|
$2,968,650
|
SH0006
|
MMC - A00217953
|
01/06/2026
|
10/01/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($2,710,700)
|
|
|
6493-71-001
|
BOSQUE
|
WACO
|
$1,585,950
|
SH0022
|
MMC - A00218380
|
01/06/2026
|
11/19/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,416,100)
|
|
|
6493-42-001
|
GRIMES
|
BRYAN
|
$350,200
|
SH0006
|
MMC - A00218326
|
12/10/2025
|
10/14/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($297,600)
|
|
|
6493-75-001
|
WASHINGTON
|
BRYAN
|
$652,800
|
SH0036
|
MMC - A00218387
|
12/10/2025
|
10/21/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($581,200)
|
|
|
2682-01-024
|
NAVARRO
|
DALLAS
|
$2,046,631
|
FM 2555
|
C 2682-1-24
|
12/03/2025
|
10/01/2025
|
REHAB EXIST ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($1,627,075)
|
|
|
0574-02-023
|
NAVARRO
|
DALLAS
|
$7,745,075
|
FM 636
|
C 574-2-23
|
12/02/2025
|
10/01/2025
|
REHAB EXSISITNG ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($6,087,367)
|
|
|
6488-62-001
|
SMITH
|
TYLER
|
$2,298,778
|
US0069
|
RMC - A00217157
|
12/02/2025
|
10/01/2025
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($1,933,465)
|
|
|
6492-01-001
|
HOUSTON
|
LUFKIN
|
$752,900
|
SL0304
|
MMC - A00217985
|
11/20/2025
|
09/18/2025
|
HOT MIX/TY C, D/PATCH/HMCL/FB/RIPRAP...
|
TEXAS MATERIALS GROUP, INC.
($667,785)
|
|
|
0108-01-030
|
VAN ZANDT
|
TYLER
|
$14,999,624
|
SH 19
|
F 2026(119)
|
11/06/2025
|
09/01/2025
|
HWY IMPRV
|
BIG CREEK CONSTRUCTION, LTD.
($11,187,838)
|
|
|
0117-05-063
|
MADISON
|
BRYAN
|
$2,371,533
|
SH 21
|
STP 2026(122)HES
|
11/06/2025
|
09/01/2025
|
EXTENDING/ADDING A TWLTL
|
BIG CREEK CONSTRUCTION, LTD.
($2,014,433)
|
|
|
6491-57-001
|
ANDERSON
|
TYLER
|
$1,573,500
|
US0079
|
MMC - A00217882
|
11/05/2025
|
09/25/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,572,500)
|
|
|
0252-01-087
|
BURNET
|
AUSTIN
|
$2,387,279
|
US 281
|
C 252-1-87
|
10/09/2025
|
08/01/2025
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($1,537,148)
|
|
|
0272-06-031
|
LAMPASAS
|
BROWNWOOD
|
$71,860,981
|
US 183
|
F 2025(996)
|
10/09/2025
|
08/01/2025
|
WIDEN ROAD - ADD LANES AND SHOULDERS
|
BIG CREEK CONSTRUCTION, LTD.
($54,760,409)
|
|
|
0382-03-038
|
LIMESTONE
|
WACO
|
$18,679,272
|
SH 7
|
C 382-3-38
|
10/09/2025
|
08/01/2025
|
REHAB EXIST ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($13,941,159)
|
|
|
2017-01-010
|
FAYETTE
|
YOAKUM
|
$6,837,358
|
FM 2145
|
BR 2026(013)
|
10/09/2025
|
08/01/2025
|
REHAB EXIST ROADWAY
|
DEAN WORD COMPANY, LTD.
($5,752,555)
|
|
|
0048-06-037
|
HILL
|
WACO
|
$4,084,369
|
SS 579
|
C 48-6-37
|
10/08/2025
|
08/01/2025
|
SURF/ROADWAY RESTOR
|
KNIFE RIVER CORPORATION - SOUTH
($3,553,261)
|
|
|
0172-05-128
|
ELLIS
|
DALLAS
|
$18,123,363
|
US 287
|
C 172-5-128
|
10/08/2025
|
08/01/2025
|
REHAB EXIST ROADWAY
|
FOUTSCO PAVING COMPANY, LLC
($17,308,925)
|
|
|
1073-01-021
|
BASTROP
|
AUSTIN
|
$8,424,891
|
FM 696
|
C 1073-1-21
|
10/08/2025
|
08/01/2025
|
PREVENT MAINT
|
DEAN WORD COMPANY, LTD.
($6,445,912)
|
|
|
1451-02-018
|
ELLIS
|
DALLAS
|
$9,725,831
|
FM 55
|
F 2026(024)
|
10/08/2025
|
08/01/2025
|
RECON EXIST ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($8,523,201)
|
|
|
0289-04-034
|
SAN SABA
|
BROWNWOOD
|
$13,990,091
|
SH 16
|
C 289-4-34
|
09/05/2025
|
07/01/2025
|
REHAB EXIST ROADWAY
|
ALLEN KELLER COMPANY
($11,074,629)
|
|
|
0747-01-018
|
ELLIS
|
DALLAS
|
$11,197,531
|
FM 667
|
C 747-1-18
|
09/05/2025
|
07/01/2025
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($9,501,431)
|
|
|
6488-58-001
|
HENDERSON
|
TYLER
|
$5,605,030
|
US0175
|
RMC - A00217143
|
09/05/2025
|
07/10/2025
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($4,487,610)
|
|
|
0639-02-026
|
MADISON
|
BRYAN
|
$17,046,795
|
FM 39
|
F 2B25(117)
|
09/04/2025
|
07/01/2025
|
REHAB RD AND WIDEN SHOULDERS
|
KNIFE RIVER CORPORATION - SOUTH
($18,290,693)
|
|
|
3623-01-004
|
CORYELL
|
WACO
|
$12,372,592
|
SH 9
|
C 3623-1-4
|
09/04/2025
|
07/01/2025
|
CONSTRUCT RAMPS
|
BIG CREEK CONSTRUCTION, LTD.
($7,187,653)
|
|
|
0151-01-052
|
BURNET
|
AUSTIN
|
$12,526,241
|
SH 29
|
STP 2025(951)HES
|
08/08/2025
|
06/02/2025
|
RECON EXIST ROADWAY
|
ALLEN KELLER COMPANY
($10,701,288)
|
|
|
0335-01-040
|
LEON
|
BRYAN
|
$24,159,203
|
SH 7
|
F 2025(889)
|
08/08/2025
|
05/01/2025
|
WIDEN ROAD - ADD LANES
|
BIG CREEK CONSTRUCTION, LTD.
($21,287,953)
|
|
|
2068-01-006
|
HOUSTON
|
LUFKIN
|
$11,385,717
|
FM 2076
|
C 2068-1-6
|
08/08/2025
|
06/02/2025
|
HWY IMPRV
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($9,900,198)
|
|
|
2264-01-012
|
ELLIS
|
DALLAS
|
$7,053,217
|
FM 2377
|
STP 2025(972)HES
|
08/08/2025
|
06/02/2025
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($6,535,505)
|
|
|
0172-08-106
|
ELLIS
|
DALLAS
|
$1,051,195
|
US 287
|
STP 2025(973)HES
|
08/07/2025
|
06/02/2025
|
INTERS IMPRV
|
BIG CREEK CONSTRUCTION, LTD.
($1,120,429)
|
|
|
0408-02-048
|
AUSTIN
|
YOAKUM
|
$13,648,001
|
SH 159
|
C 408-2-48
|
08/07/2025
|
06/02/2025
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($12,637,640)
|
|
|
0540-03-037
|
BRAZOS
|
BRYAN
|
$2,824,746
|
FM 974
|
STP 2025(932)VRU
|
08/07/2025
|
06/02/2025
|
ADDING TWLT AND ADDING RIGHT TURN LA...
|
LARRY YOUNG PAVING, INC.
($2,808,685)
|
|
|
6486-09-001
|
ROBERTSON
|
BRYAN
|
$435,000
|
SH0006
|
MMC - A00216197
|
07/09/2025
|
05/22/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($411,000)
|
|
|
6486-12-001
|
BURLESON
|
BRYAN
|
$317,000
|
SH0036
|
MMC - A00216200
|
07/08/2025
|
05/22/2025
|
HOT MIX
|
BRAZOS PAVING, INC.
($292,200)
|
|
|
2134-01-031
|
ROBERTSON
|
BRYAN
|
$25,133,872
|
FM 2293
|
F 2025(891)
|
07/02/2025
|
05/01/2025
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($18,180,795)
|
|
|
6479-76-001
|
MCLENNAN
|
WACO
|
$2,280,115
|
US0084
|
MMC - A00213921
|
07/02/2025
|
05/01/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($2,004,625)
|
|
|
6479-85-001
|
CORYELL
|
WACO
|
$1,346,625
|
US0084
|
MMC - A00213954
|
07/02/2025
|
05/01/2025
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($1,227,192)
|
|
|
0166-07-068
|
MADISON
|
BRYAN
|
$822,327
|
SH 75
|
STP 2025(888)HES
|
07/01/2025
|
05/01/2025
|
RECON EXIST ROADWAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($820,741)
|
|
|
6479-75-001
|
HILL
|
WACO
|
$2,071,682
|
SH0031
|
MMC - A00213920
|
07/01/2025
|
05/01/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,959,150)
|
|
|
6479-84-001
|
BELL
|
WACO
|
$1,464,648
|
SL0121
|
MMC - A00213952
|
07/01/2025
|
05/01/2025
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($1,367,899)
|
|
|
6483-76-001
|
MADISON
|
BRYAN
|
$227,200
|
IH0045
|
MMC - A00215285
|
06/11/2025
|
04/04/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($202,400)
|
|
|
6483-77-001
|
FREESTONE
|
BRYAN
|
$505,000
|
IH0045
|
MMC - A00215286
|
06/11/2025
|
04/04/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($442,000)
|
|
|
6483-81-001
|
WASHINGTON
|
BRYAN
|
$895,200
|
SH0036
|
MMC - A00215294
|
06/11/2025
|
04/07/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($796,200)
|
|
|
6484-98-001
|
WASHINGTON
|
BRYAN
|
$490,650
|
FM1948
|
RMC - A00215733
|
06/11/2025
|
04/29/2025
|
SPOT BASE REPAIR
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($230,840)
|
|
|
6483-00-001
|
BRAZOS
|
BRYAN
|
$866,860
|
SH0006
|
RMC - A00214913
|
06/10/2025
|
03/17/2025
|
MILL AND INLAY
|
KNIFE RIVER CORPORATION - SOUTH
($814,128)
|
|
|
6483-78-001
|
LEON
|
BRYAN
|
$606,000
|
IH0045
|
MMC - A00215287
|
06/10/2025
|
04/04/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($539,000)
|
|
|
6484-02-001
|
FREESTONE
|
BRYAN
|
$783,650
|
FM0416
|
RMC - A00215344
|
06/10/2025
|
04/09/2025
|
SPOT BASE REPAIR
|
KNIFE RIVER CORPORATION - SOUTH
($403,575)
|
|
|
0274-01-040
|
MILLS
|
BROWNWOOD
|
$5,573,792
|
US 183
|
STP 2025(667)HES
|
06/05/2025
|
04/01/2025
|
HAZARD ELIM & SAFETY
|
BIG CREEK CONSTRUCTION, LTD.
($4,457,730)
|
|
|
0909-36-198
|
CORYELL
|
WACO
|
$5,528,179
|
704540
|
|
06/04/2025
|
04/17/2025
|
RECON EXIST ROADWAY
|
TTG UTILITIES, INC.
($4,647,464)
|
|
|
6477-39-001
|
MADISON
|
BRYAN
|
$4,066,899
|
IH0045
|
RMC - A00213018
|
06/04/2025
|
04/01/2025
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($3,461,710)
|
|
|
6484-26-001
|
MCCULLOCH
|
BROWNWOOD
|
$242,735
|
US0377
|
MMC - A00215423
|
05/15/2025
|
04/14/2025
|
HOT MIX
|
VULCAN CONSTRUCTION MATERIALS, LLC
($254,060)
|
|
|
6482-99-001
|
WASHINGTON
|
BRYAN
|
$788,450
|
SH0036
|
RMC - A00214912
|
05/06/2025
|
03/21/2025
|
MILL AND INLAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($733,533)
|
|
|
0114-09-099
|
WASHINGTON
|
BRYAN
|
$1,325,224
|
US 290
|
F 2025(699)
|
05/02/2025
|
03/01/2025
|
INSTLING R-CUTS
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($965,907)
|
|
|
0187-02-073
|
AUSTIN
|
YOAKUM
|
$6,997,407
|
SH 36
|
C 187-2-73
|
05/02/2025
|
03/01/2025
|
RECON EXIST ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($6,157,668)
|
|
|
0648-01-036
|
ROBERTSON
|
BRYAN
|
$29,250,178
|
FM 50
|
F 2025(362)
|
05/02/2025
|
03/01/2025
|
REHAB EXIST ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($20,558,088)
|
|
|
0836-02-079
|
BELL
|
WACO
|
$6,524,882
|
SH 195
|
STP 2025(770)HES
|
05/02/2025
|
03/01/2025
|
HAZARD ELIM & SAFETY
|
BIG CREEK CONSTRUCTION, LTD.
($4,930,555)
|
|
|
6471-33-001
|
ELLIS
|
DALLAS
|
$1,152,692
|
BI0045J
|
RMC - A00211540
|
05/02/2025
|
01/05/2025
|
FLEXIBLE PAVMT STRUCT REPAIR
|
PEACHTREE CONSTRUCTION, LTD.
($1,004,908)
|
|
|
6483-01-001
|
WALKER
|
BRYAN
|
$1,311,700
|
IH0045
|
RMC - A00214914
|
05/02/2025
|
03/17/2025
|
MILL AND INLAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($1,349,975)
|
|
|
2060-01-039
|
MCLENNAN
|
WACO
|
$15,103,012
|
FM 2113
|
STP 2025(769)HES
|
05/01/2025
|
03/01/2025
|
REHAB EXIST ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($10,809,104)
|
|
|
0187-03-078
|
AUSTIN
|
YOAKUM
|
$5,169,190
|
SH 36
|
C 187-3-78
|
04/04/2025
|
02/04/2025
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($4,364,003)
|
|
|
0540-05-054
|
BRAZOS
|
BRYAN
|
$6,658,923
|
FM 159
|
C 540-5-54
|
04/04/2025
|
02/02/2025
|
REHAB EXIST ROADWAY
|
BRAZOS PAVING, INC.
($6,280,471)
|
|
|
0205-05-051
|
LEON
|
BRYAN
|
$3,385,053
|
US 79
|
STP 2025(656)HES
|
04/03/2025
|
02/02/2025
|
CONSTRUCT TWO-WAY LEFT TURN LANE
|
LARRY YOUNG PAVING, INC.
($2,870,625)
|
|
|
6480-58-001
|
HENDERSON
|
TYLER
|
$1,516,360
|
US0175
|
MMC - A00214192
|
04/03/2025
|
02/18/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,748,700)
|
|
|
6479-08-001
|
NAVARRO
|
DALLAS
|
$599,200
|
SH0031
|
MMC - A00213806
|
03/12/2025
|
01/15/2025
|
ASPH
|
BIG CREEK CONSTRUCTION, LTD.
($541,500)
|
|
|
6478-09-001
|
WALKER
|
BRYAN
|
$680,000
|
IH0045
|
MMC - A00213197
|
03/11/2025
|
01/05/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($626,200)
|
|
|
0515-04-034
|
LAVACA
|
YOAKUM
|
$7,562,794
|
FM 530
|
C 515-4-34
|
03/05/2025
|
01/05/2025
|
SURF/ROADWAY RESTOR
|
HUNTER INDUSTRIES, LTD.
($5,948,468)
|
|
|
6477-41-001
|
WASHINGTON
|
BRYAN
|
$1,454,685
|
US0290
|
RMC - A00213021
|
03/05/2025
|
01/05/2025
|
MILL AND INLAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($1,299,406)
|
|
|
6479-39-001
|
SMITH
|
TYLER
|
$2,793,430
|
US0069
|
MMC - A00213856
|
03/05/2025
|
01/23/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($2,966,600)
|
|
|
6479-41-001
|
VAN ZANDT
|
TYLER
|
$1,320,680
|
US0080
|
MMC - A00213858
|
03/05/2025
|
02/02/2025
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($1,200,800)
|
|
|
1159-02-035
|
ELLIS
|
DALLAS
|
$11,176,341
|
FM 879
|
C 1159-2-35
|
03/04/2025
|
01/05/2025
|
RESTORE EXIST PAVMT AND ADD SHOULDER...
|
KNIFE RIVER CORPORATION - SOUTH
($9,167,314)
|
|
|
6479-38-001
|
CHEROKEE
|
TYLER
|
$2,097,585
|
US0069
|
MMC - A00213855
|
03/04/2025
|
02/02/2025
|
HOT MIX
|
LONGVIEW ASPHALT, INC.
($2,006,420)
|
|
|
6479-31-001
|
MILAM
|
BRYAN
|
$519,000
|
SH0036
|
MMC - A00213846
|
02/12/2025
|
01/08/2025
|
HOT MIX
|
LONE STAR PAVING COMPANY
($390,150)
|
|
|
6479-30-001
|
BURLESON
|
BRYAN
|
$502,000
|
SH0036
|
MMC - A00213845
|
02/11/2025
|
01/08/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($401,000)
|
|
|
6479-32-001
|
ROBERTSON
|
BRYAN
|
$597,500
|
SH0006
|
MMC - A00213847
|
02/11/2025
|
01/08/2025
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($481,500)
|
|
|
0049-13-010
|
FALLS
|
WACO
|
$4,914,109
|
FM 46
|
C 49-13-10
|
02/07/2025
|
01/05/2025
|
REHAB EXIST ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($3,949,757)
|
|
|
0206-05-033
|
CHEROKEE
|
TYLER
|
$6,215,435
|
US 79
|
C 206-5-33
|
02/07/2025
|
01/05/2025
|
PVMNT REPAIR, PLANING, OCST, PFC SUR...
|
MADDEN CONTRACTING COMPANY, LLC.
($4,258,941)
|
|
|
0210-02-029
|
MILAM
|
BRYAN
|
$1,917,132
|
US 77
|
STP 2025(361)HES
|
02/07/2025
|
01/05/2025
|
INSTL LEFT AND RIGHT TURN LANE
|
LARRY YOUNG PAVING, INC.
($1,382,358)
|
|
|
0164-01-078
|
HENDERSON
|
TYLER
|
$8,623,673
|
BS 31H
|
F 2025(450)
|
02/06/2025
|
01/05/2025
|
REHAB EXIST ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($8,087,241)
|
|
|
0205-01-046
|
ROBERTSON
|
BRYAN
|
$891,318
|
US 79
|
STP 2025(360)HES
|
02/06/2025
|
01/05/2025
|
INTERS IMPRV
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($897,290)
|
|
|
1926-01-019
|
CORYELL
|
WACO
|
$5,558,480
|
FM 1829
|
BR 2025(496)
|
02/06/2025
|
01/05/2025
|
BRIDGE REPL
|
BIG CREEK CONSTRUCTION, LTD.
($4,787,272)
|
|
|
0114-04-078
|
BASTROP
|
AUSTIN
|
$5,495,945
|
US 290
|
F 2025(406)
|
01/08/2025
|
11/27/2024
|
SURF/ROADWAY RESTOR
|
TEXAS MATERIALS GROUP, INC.
($4,270,055)
|
|
|
0150-03-021
|
LLANO
|
AUSTIN
|
$1,943,649
|
SH 29
|
C 150-3-21
|
01/08/2025
|
11/27/2024
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($1,386,823)
|
|
|
0164-04-165
|
SMITH
|
TYLER
|
$9,363,511
|
SH 31
|
F 2025(342)
|
01/08/2025
|
11/27/2024
|
RESURF ROADWAY
|
EAST TEXAS BRIDGE, INC.
($7,385,033)
|
|
|
0251-06-041
|
LAMPASAS
|
BROWNWOOD
|
$1,278,122
|
US 183
|
C 251-6-41
|
01/08/2025
|
11/27/2024
|
PREVENT MAINT
|
LONE STAR PAVING COMPANY
($1,066,350)
|
|
|
0260-04-005
|
ELLIS
|
DALLAS
|
$4,366,409
|
SS 73
|
F 2025(349)
|
01/08/2025
|
11/27/2024
|
REHAB EXIST ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($3,784,310)
|
|
|
6473-57-001
|
BOSQUE
|
WACO
|
$1,758,500
|
SH0006
|
MMC - 647357001
|
01/08/2025
|
11/26/2024
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,801,950)
|
|
|
6473-58-001
|
BELL
|
WACO
|
$1,354,500
|
US0190
|
MMC - 647358001
|
01/08/2025
|
11/27/2024
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($1,283,290)
|
|
|
6477-42-001
|
BRAZOS
|
BRYAN
|
$1,143,824
|
FM2154
|
RMC - 647742001
|
01/08/2025
|
12/04/2024
|
MILL AND INLAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($898,734)
|
|
|
0245-04-023
|
VAN ZANDT
|
TYLER
|
$9,573,493
|
FM 279
|
C 245-4-23
|
01/07/2025
|
11/26/2024
|
REHAB EXIST ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($7,787,125)
|
|
|
0418-01-035
|
HILL
|
WACO
|
$9,344,627
|
SH 171
|
F 2025(374)
|
01/07/2025
|
11/26/2024
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($8,760,907)
|
|
|
6473-32-001
|
MCLENNAN
|
WACO
|
$2,506,800
|
US0084
|
MMC - 647332001
|
01/07/2025
|
12/03/2024
|
HOT MIX
|
KNIFE RIVER CORPORATION - SOUTH
($2,455,650)
|
|
|
6473-34-001
|
FALLS
|
WACO
|
$2,143,000
|
SH0007
|
MMC - 647334001
|
01/07/2025
|
12/03/2024
|
HOT MIX
|
KNIFE RIVER CORPORATION - SOUTH
($2,141,500)
|
|
|
6473-41-001
|
MCLENNAN
|
WACO
|
$1,638,415
|
US0084
|
RMC - 647341001
|
12/04/2024
|
11/10/2024
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($1,423,275)
|
|
|
6473-42-001
|
HILL
|
WACO
|
$1,580,806
|
SH0022
|
RMC - 647342001
|
12/04/2024
|
11/10/2024
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($1,448,925)
|
|
|
6473-56-001
|
CORYELL
|
WACO
|
$1,580,806
|
SH0036
|
RMC - 647356001
|
12/04/2024
|
11/10/2024
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($1,449,375)
|
|
|
1533-01-022
|
BASTROP
|
AUSTIN
|
$3,294,015
|
FM 1704
|
C 1533-1-22
|
12/03/2024
|
11/10/2024
|
PREVENT MAINT
|
LONE STAR PAVING COMPANY
($2,843,419)
|
|
|
6472-29-001
|
MCLENNAN
|
WACO
|
$1,912,025
|
FM0185
|
MMC - 647229001
|
12/03/2024
|
11/10/2024
|
FLEXIBLE BASE
|
TOUCHSTONE RESOURCES, LLC
($1,646,175)
|
|
|
6473-55-001
|
BELL
|
WACO
|
$1,638,415
|
FM0437
|
RMC - 647355001
|
12/03/2024
|
11/10/2024
|
BASE FAILURE PAVMT REPAIR
|
TEXAS MATERIALS GROUP, INC.
($1,547,097)
|
|
|
0117-03-024
|
MADISON
|
BRYAN
|
$278,418,500
|
US 190
|
NH 2B20(290)
|
11/07/2024
|
09/26/2024
|
WIDEN ROAD - ADD LANES
|
JAMES CONSTRUCTION GROUP, LLC
($190,371,163)
|
|
|
0204-09-045
|
ROBERTSON
|
BRYAN
|
$19,385,141
|
US 79
|
BR 2B24(086)
|
11/07/2024
|
09/26/2024
|
BRIDGE REPL
|
LARRY YOUNG PAVING, INC.
($18,997,916)
|
|
|
1599-05-011
|
ELLIS
|
DALLAS
|
$5,268,123
|
FM 2258
|
C 1599-5-11
|
11/07/2024
|
09/26/2024
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($5,747,469)
|
|
|
0752-06-024
|
LIMESTONE
|
WACO
|
$13,009,783
|
FM 147
|
F 2B24(407)
|
11/06/2024
|
09/25/2024
|
REHAB EXIST ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($9,559,737)
|
|
|
0519-03-035
|
BOSQUE
|
WACO
|
$5,127,756
|
SH 174
|
C 519-3-35
|
10/01/2024
|
08/20/2024
|
SURF/ROADWAY RESTOR
|
TEXAS MATERIALS GROUP, INC.
($4,687,668)
|
|
|
1564-01-036
|
WASHINGTON
|
BRYAN
|
$20,997,387
|
FM 2780
|
C 1564-1-36
|
10/01/2024
|
06/20/2024
|
REHAB EXIST ROADWAY
|
KNIFE RIVER CORPORATION - SOUTH
($17,441,399)
|
|
|
1854-01-051
|
HOUSTON
|
LUFKIN
|
$14,652,486
|
SL 304
|
F 2B24(103)
|
10/01/2024
|
08/20/2024
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($13,181,850)
|
|
|
0071-03-043
|
MASON
|
AUSTIN
|
$2,052,579
|
US 87
|
F 2025(027)
|
09/06/2024
|
07/26/2024
|
SEAL COAT
|
LONE STAR PAVING COMPANY
($1,748,508)
|
|
|
0108-03-041
|
HENDERSON
|
TYLER
|
$20,755,210
|
SH 19
|
C 108-3-41
|
09/06/2024
|
07/26/2024
|
HWY IMPRV
|
BIG CREEK CONSTRUCTION, LTD.
($13,887,918)
|
|
|
0162-01-099
|
MCLENNAN
|
WACO
|
$19,749,994
|
US 84
|
C 162-1-99
|
09/06/2024
|
07/26/2024
|
RESURF ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($10,569,490)
|
|
|
0204-07-056
|
MILAM
|
BRYAN
|
$1,375,549
|
US 79
|
C 204-7-56
|
09/06/2024
|
07/26/2024
|
INSTLING TURN LANES
|
KNIFE RIVER CORPORATION - SOUTH
($1,108,346)
|
|
|
0055-15-079
|
MCLENNAN
|
WACO
|
$8,243,562
|
US 84
|
F 2B24(523)
|
09/05/2024
|
07/25/2024
|
REHAB EXIST ROADWAY
|
SILVER CREEK CONSTRUCTION, INC.
($8,584,310)
|
|
|
0162-13-002
|
HILL
|
WACO
|
$9,439,338
|
SH 31
|
F 2025(088)
|
09/05/2024
|
07/25/2024
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($7,287,640)
|
|
|
0720-01-045
|
GRIMES
|
BRYAN
|
$4,527,188
|
FM 149
|
STP 2024(733)HES
|
09/05/2024
|
12/21/2023
|
SAFETY TREAT FIXED OBJECTS
|
BRAZOS PAVING, INC.
($4,479,429)
|
|
|
6469-54-001
|
CHEROKEE
|
TYLER
|
$2,156,898
|
SH0135
|
RMC - 646954001
|
09/05/2024
|
07/26/2024
|
MILL AND INLAY
|
MADDEN CONTRACTING COMPANY, LLC.
($1,926,121)
|
|
|
0048-04-106
|
ELLIS
|
DALLAS
|
$10,755,475
|
IH 35E
|
F 2B24(293)
|
08/02/2024
|
06/21/2024
|
REHAB EXIST ROADWAY
|
PEACHTREE CONSTRUCTION, LTD.
($9,843,419)
|
|
|
0185-03-033
|
MILAM
|
BRYAN
|
$2,941,639
|
US 190
|
STP 2B24(387)HES
|
08/02/2024
|
06/21/2024
|
INTERS IMPRVS WITH TURN LANES
|
TEXAS MATERIALS GROUP, INC.
($3,193,317)
|
|
|
6467-53-001
|
BELL
|
WACO
|
$1,488,800
|
US0190
|
MMC - 646753001
|
08/02/2024
|
06/25/2024
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($1,496,929)
|
|
|
0117-05-059
|
MADISON
|
BRYAN
|
$802,040
|
SH 21
|
STP 2B24(386)HES
|
08/01/2024
|
06/20/2024
|
CONSTRUCT TWO-WAY LEFT TURN LANE
|
LARRY YOUNG PAVING, INC.
($938,332)
|
|
|
6467-50-001
|
HILL
|
WACO
|
$1,696,600
|
SH0081
|
MMC - 646750001
|
08/01/2024
|
06/26/2024
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,778,575)
|
|
|
6467-51-001
|
MCLENNAN
|
WACO
|
$2,252,250
|
US0084
|
MMC - 646751001
|
08/01/2024
|
06/26/2024
|
HOT MIX
|
TEXAS MATERIALS GROUP, INC.
($2,213,910)
|
|
|
6467-54-001
|
CORYELL
|
WACO
|
$1,783,500
|
US0084
|
MMC - 646754001
|
08/01/2024
|
06/25/2024
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,892,350)
|
|
|
0116-04-111
|
BRAZOS
|
BRYAN
|
$8,295,614
|
SH 21
|
F 2B24(470 )
|
07/10/2024
|
05/29/2024
|
INTERS IMPRV INSTLING R-CUTS
|
LARRY YOUNG PAVING, INC.
($6,969,517)
|
|
|
6468-53-001
|
BURLESON
|
BRYAN
|
$397,000
|
SH0036
|
MMC - 646853001
|
07/10/2024
|
06/04/2024
|
HOT MIX
|
KNIFE RIVER CORPORATION - SOUTH
($400,000)
|
|
|
0212-04-039
|
GRIMES
|
BRYAN
|
$9,446,098
|
SH 30
|
BR 2B24(147)
|
06/06/2024
|
04/25/2024
|
BRIDGE REPL
|
BIG CREEK CONSTRUCTION, LTD.
($12,337,845)
|
|
|
0568-01-052
|
ELLIS
|
DALLAS
|
$12,752,089
|
SH 34
|
F 2B24(160)
|
06/06/2024
|
04/25/2024
|
REPAIR ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($12,687,858)
|
|
|
6463-05-001
|
NAVARRO
|
DALLAS
|
$1,137,008
|
FM0416
|
RMC - 646305001
|
06/06/2024
|
04/29/2024
|
FLEXIBLE PAVMT STRUCT REPAIR
|
KNIFE RIVER CORPORATION - SOUTH
($902,836)
|
|
|
6467-39-001
|
CORYELL
|
WACO
|
$3,446,120
|
FM0107
|
RMC - 646739001
|
06/06/2024
|
04/30/2024
|
BASE FAILURE PAVMT REPAIR
|
KNIFE RIVER CORPORATION - SOUTH
($2,342,225)
|
|
|
6467-42-001
|
HILL
|
WACO
|
$1,711,110
|
SH0174
|
RMC - 646742001
|
06/06/2024
|
04/29/2024
|
BASE FAILURE PAVMT REPAIR
|
KNIFE RIVER CORPORATION - SOUTH
($1,363,883)
|
|
|
6467-43-001
|
MCLENNAN
|
WACO
|
$3,036,682
|
FM1695
|
RMC - 646743001
|
06/06/2024
|
04/29/2024
|
BASE FAILURE PAVMT REPAIR
|
BIG CREEK CONSTRUCTION, LTD.
($2,169,039)
|
|
|
0338-01-068
|
GRIMES
|
BRYAN
|
$13,115,068
|
SH 105
|
STP 2B24(245)HES
|
06/05/2024
|
04/24/2024
|
INTERS IMPRVS W/ RT AND/OR LT TRN LA...
|
KNIFE RIVER CORPORATION - SOUTH
($10,784,375)
|
|
|
0480-07-014
|
MILLS
|
BROWNWOOD
|
$28,367,744
|
FM 45
|
BR 2B24(034)
|
06/05/2024
|
04/24/2024
|
RECON EXIST ROADWAY
|
ALLEN KELLER COMPANY
($32,511,818)
|
|
|
2057-01-010
|
BELL
|
WACO
|
$1,460,915
|
FS 439
|
C 2057-1-10
|
06/05/2024
|
04/24/2024
|
SURF/ROADWAY RESTOR
|
LONE STAR PAVING COMPANY
($1,357,784)
|
|
|
6466-07-001
|
WASHINGTON
|
BRYAN
|
$791,000
|
SH0036
|
MMC - 646607001
|
06/05/2024
|
04/30/2024
|
HOT MIX
|
KNIFE RIVER CORPORATION - SOUTH
($724,325)
|
|
|
6466-46-001
|
BRAZOS
|
BRYAN
|
$490,000
|
SH0006
|
MMC - 646646001
|
06/05/2024
|
04/30/2024
|
HOT MIX
|
KNIFE RIVER CORPORATION - SOUTH
($443,500)
|
|
|
6467-38-001
|
BELL
|
WACO
|
$1,436,658
|
SH0036
|
RMC - 646738001
|
06/05/2024
|
04/30/2024
|
BASE FAILURE PAVMT REPAIR
|
TEXAS MATERIALS GROUP, INC.
($875,096)
|
|
|
0836-02-077
|
BELL
|
WACO
|
$6,205,434
|
SH 195
|
STP 2024(988)HES
|
05/03/2024
|
03/22/2024
|
HAZARD ELIM & SAFETY
|
JAMES CONSTRUCTION GROUP, LLC
($5,775,775)
|
|
|
1671-02-012
|
VAN ZANDT
|
TYLER
|
$12,355,638
|
FM 1651
|
C 1671-2-12
|
05/03/2024
|
03/22/2024
|
REHAB EXIST ROADWAY
|
BAKER & COMPANY CONSTRUCTION, LLC
($10,542,339)
|
|
|
0049-08-076
|
ROBERTSON
|
BRYAN
|
$2,661,821
|
US 190
|
STP 2B24(087)HES
|
05/02/2024
|
03/21/2024
|
WIDEN ROAD - ADD SHOULDERS
|
BIG CREEK CONSTRUCTION, LTD.
($2,487,591)
|
|
|
0162-01-100
|
MCLENNAN
|
WACO
|
$33,843,950
|
SH 31
|
F 2024(984)
|
05/02/2024
|
03/21/2024
|
CONSTRUCT OVERPASS, ETC.
|
BIG CREEK CONSTRUCTION, LTD.
($29,287,263)
|
|
|
6451-57-001
|
BRAZOS
|
BRYAN
|
$5,296,203
|
US0190
|
RMC - 645157001
|
05/02/2024
|
03/21/2024
|
MILL AND INLAY
|
KNIFE RIVER CORPORATION - SOUTH
($4,330,955)
|
|
|
0015-01-258
|
MCLENNAN
|
WACO
|
$696,135
|
IH 35
|
C 15-1-258
|
04/05/2024
|
02/23/2024
|
CONSTRUCT RIGHT TURN LANE
|
BIG CREEK CONSTRUCTION, LTD.
($787,765)
|
|
|
0578-03-055
|
WALKER
|
BRYAN
|
$1,502,575
|
SH 150
|
F 2024(940)
|
04/05/2024
|
02/23/2024
|
INTERS IMPRVS W/ TURN LANES
|
LARRY YOUNG PAVING, INC.
($1,514,151)
|
|
|
1133-02-030
|
GONZALES
|
YOAKUM
|
$5,736,832
|
FM 794
|
C 1133-2-30
|
04/05/2024
|
02/23/2024
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($4,879,726)
|
|
|
3623-01-008
|
CORYELL
|
WACO
|
$1,652,705
|
SH 9
|
F 2024(911)
|
04/05/2024
|
02/23/2024
|
INTERCHANGE IMPRV (NEW OR UP)
|
KNIFE RIVER CORPORATION - SOUTH
($1,170,677)
|
|
|
6464-55-001
|
ELLIS
|
DALLAS
|
$285,300
|
FM0876
|
MMC - 646455001
|
03/12/2024
|
02/14/2024
|
HOT MIX
|
TOUCHSTONE RESOURCES, LLC
($239,700)
|
|
|
0080-01-056
|
ERATH
|
FORT WORTH
|
$8,588,585
|
US 377
|
C 80-1-56
|
03/06/2024
|
01/24/2024
|
RESURF ROADWAY
|
NORTHEASTERN PAVERS, LLC
($7,391,389)
|
|
|
6462-68-001
|
BROWN
|
BROWNWOOD
|
$1,826,760
|
FM1176
|
RMC - 646268001
|
03/06/2024
|
01/29/2024
|
MILL AND INLAY
|
BIG CREEK CONSTRUCTION, LTD.
($2,187,102)
|
|
|
0054-06-112
|
BROWN
|
BROWNWOOD
|
$5,572,002
|
US 67
|
C 54-6-112
|
03/05/2024
|
01/23/2024
|
RESURF ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($5,210,426)
|
|
|
0092-13-033
|
NAVARRO
|
DALLAS
|
$4,635,544
|
BI 45-F
|
C 92-13-33
|
03/05/2024
|
01/23/2024
|
REHAB EXIST ROADWAY
|
TEXAS MATERIALS GROUP, INC.
($4,119,673)
|
|
|
0109-03-044
|
HOUSTON
|
LUFKIN
|
$16,313,621
|
US 287
|
C 109-3-44
|
03/05/2024
|
01/23/2024
|
RESURF ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($11,224,367)
|
|
|
0049-01-095
|
MCLENNAN
|
WACO
|
$29,068,891
|
SH 6
|
F 2024(764)
|
02/02/2024
|
12/22/2023
|
SURF/ROADWAY RESTOR
|
BIG CREEK CONSTRUCTION, LTD.
($22,852,588)
|
|
|
6443-78-001
|
FALLS
|
WACO
|
$1,878,200
|
SH0006
|
MMC - 644378001
|
02/02/2024
|
12/25/2023
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,825,100)
|
|
|
0007-03-111
|
EASTLAND
|
BROWNWOOD
|
$23,118,579
|
IH 20
|
C 7-3-111
|
02/01/2024
|
12/21/2023
|
HAZARD ELIM & SAFETY
|
NORTHEASTERN PAVERS, LLC
($21,627,297)
|
|
|
0014-10-071
|
MCLENNAN
|
WACO
|
$1,247,631
|
BU 77-L
|
BR 2024(859)
|
02/01/2024
|
12/21/2023
|
RMVL AND DISPOSAL OF BRIDGE
|
KNIFE RIVER CORPORATION - SOUTH
($1,121,181)
|
|
|
0252-02-064
|
BURNET
|
AUSTIN
|
$6,510,509
|
US 281
|
C 252-2-64
|
02/01/2024
|
12/21/2023
|
RESURF ROADWAY
|
CLARK CONSTRUCTION OF TEXAS, INC.
($5,701,426)
|
|
|
6443-84-001
|
BELL
|
WACO
|
$1,510,250
|
US0190
|
MMC - 644384001
|
02/01/2024
|
12/21/2023
|
HOT MIX
|
BIG CREEK CONSTRUCTION, LTD.
($1,467,750)
|
|
|
6460-41-001
|
NAVARRO
|
DALLAS
|
$280,000
|
SH0031
|
MMC - 646041001
|
01/10/2024
|
11/15/2023
|
ASPH
|
KNIFE RIVER CORPORATION - SOUTH
($198,200)
|
|
|
0054-08-027
|
MILLS
|
BROWNWOOD
|
$13,905,808
|
US 84
|
C 54-8-27
|
01/05/2024
|
11/24/2023
|
RESURF ROADWAY
|
BIG CREEK CONSTRUCTION, LTD.
($11,688,750)
|
|
|
0211-06-059
|
FAYETTE
|
YOAKUM
|
$128,168,588
|
US 77
|
F 2024(576)
|
01/05/2024
|
11/24/2023
|
WIDEN ROAD - ADD LANES
|
HUNTER INDUSTRIES, LTD.
($112,692,666)
|