Job Info for 0117-05-059

County: MADISON Highway: SH 21 Date: 08/01/2024 (3 months ago) Engineer's Estimate: $802,040 Control Number: 0117-05-059
Project: STP 2B24(386)HES District: BRYAN Time: 41 WORKING DAYS Type: CONSTRUCT TWO-WAY LEFT TURN LANE
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $802,039.63
LARRY YOUNG PAVING, INC.   $938,332.30 1
16.99% | $136,292.67
KNIFE RIVER CORPORATION - SOUTH   $940,112.31 2
17.22% | $138,072.68
0.19% | $1,780.01
TEXAS MATERIALS GROUP, INC.   $1,012,771.90 3
26.27% | $210,732.27
7.93% | $74,439.60
7.73% | $72,659.59
BIG CREEK CONSTRUCTION, LTD.   $1,037,316.00 4
29.33% | $235,276.37
10.55% | $98,983.70
2.42% | $24,544.10
Subcontractor Percentage Amount
MURRAY CONSTRUCTION 5.14% $48,230.28
HIGHWAY 1 LLC 4.70% $44,101.62
AWP SAFETY 1.27% $11,916.82
CEN TEX HYDROSEED, INC. 0.98% $9,195.66
Total: 12.09% $113,444.38

Bid Items

Items: 52, 0 filtered
MADISON SH 21  |  BRYAN  |  0117-05-059  |  08/01/2024  |  $802,040  |  STP 2B24(386)HES  |  CONSTRUCT TWO-WAY LEFT TURN LANE  |  41 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate LARRY YOUNG PAVING, INC. KNIFE RIVER CORPORATION - SOUTH TEXAS MATERIALS GROUP, INC. BIG CREEK CONSTRUCTION, LTD.
110 6001 EXCAVATION (ROADWAY) CY 267.000 $16.000 $30.000 $24.350 $50.000 $75.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 68.000 $25.000 $48.000 $132.000 $100.000 $75.000
134 6004 BACKFILL (TY A OR B) STA 45.300 $245.800 $300.000 $448.000 $600.000 $350.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 1,720.000 $1.600 $3.500 $3.400 $4.000 $2.500
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 1,720.000 $0.350 $1.250 $1.150 $1.000 $1.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 860.000 $0.300 $1.250 $1.150 $1.000 $1.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 860.000 $0.300 $1.250 $1.150 $1.000 $1.000
166 6001 FERTILIZER AC 0.360 $800.000 $630.000 $568.000 $500.000 $500.000
168 6001 VEGETATIVE WATERING MG 20.000 $15.000 $25.000 $94.000 $71.000 $25.000
247 6233 FL BS (CMP IN PLACE)(TY A GR 1-2)(12") SY 1,016.000 $50.000 $34.000 $30.000 $50.000 $40.000
310 6028 PRIME COAT (MC-30 OR EC-30) GAL 254.000 $7.500 $8.750 $17.000 $18.000 $7.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 448.000 $4.000 $12.000 $22.700 $23.000 $6.000
500 6001 MOBILIZATION LS 1.000 $75,000.000 $95,000.000 $98,600.000 $98,500.000 $100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 3.000 $6,000.000 $11,000.000 $15,400.000 $4,000.000 $5,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 80.000 $42.000 $48.000 $43.000 $40.000 $45.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 80.000 $12.000 $13.000 $11.000 $10.000 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 325.000 $4.000 $5.750 $5.100 $4.500 $5.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 325.000 $1.050 $1.250 $1.200 $1.000 $1.000
530 6005 DRIVEWAYS (ACP) SY 27.000 $70.000 $58.000 $191.000 $135.000 $125.000
636 6001 ALUMINUM SIGNS (TY A) SF 32.000 $35.000 $57.000 $51.000 $48.000 $50.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 42.000 $700.000 $840.000 $753.000 $680.000 $675.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $600.000 $950.000 $1,021.000 $800.000 $775.000
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 10.000 $900.000 $1,000.000 $1,181.000 $850.000 $850.000
644 6034 IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 1.000 $1,400.000 $1,100.000 $1,395.000 $900.000 $900.000
644 6076 REMOVE SM RD SN SUP&AM EA 61.000 $115.000 $130.000 $148.000 $130.000 $110.000
658 6101 INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF EA 7.000 $50.000 $160.000 $142.000 $135.000 $150.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 430.000 $1.250 $1.250 $2.000 $1.500 $1.500
666 6026 REFL PAV MRK TY I (W)8"(BRK)(090MIL) LF 202.000 $1.350 $3.250 $2.840 $2.700 $2.500
666 6035 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 1,160.000 $1.350 $2.500 $2.270 $2.000 $1.500
666 6284 REF PROF PAV MRK TY I(W)6"(SLD)(060MIL) LF 8,856.000 $0.790 $1.750 $1.650 $1.500 $2.750
666 6289 REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL) LF 10,716.000 $0.700 $1.750 $1.650 $1.500 $2.750
666 6293 REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL) LF 1,010.000 $1.000 $1.750 $1.650 $1.500 $3.000
666 6308 RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) LF 900.000 $0.700 $2.750 $2.560 $2.300 $2.500
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 18.000 $18.000 $35.000 $31.500 $29.000 $15.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 13.000 $235.000 $390.000 $351.000 $320.000 $215.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 5.000 $290.000 $480.000 $428.000 $390.000 $255.000
672 6007 REFL PAV MRKR TY I-C EA 86.000 $3.500 $8.250 $7.400 $7.000 $6.000
672 6009 REFL PAV MRKR TY II-A-A EA 402.000 $4.500 $7.500 $6.800 $6.500 $6.000
677 6007 ELIM EXT PAV MRK & MRKS (24") LF 18.000 $3.250 $4.750 $4.300 $4.000 $5.000
682 6054 BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM EA 8.000 $270.000 $530.000 $127.000 $530.000 $250.000
685 6004 INSTL RDSD FLSH BCN ASSM (SOLAR PWRD) EA 2.000 $9,000.000 $6,400.000 $20,453.000 $6,500.000 $20,000.000
690 6025 REPLACE OF SIGNAL HEAD ASSM EA 3.000 $300.000 $360.000 $5,343.000 $360.000 $5,500.000
690 6065 REPLACE OF LUMINAIRE HEAD EA 2.000 $1,000.000 $360.000 $1,700.000 $360.000 $2,000.000
3077 6001 SP MIXES SP-B PG64-22 TON 416.000 $120.000 $140.000 $151.250 $170.000 $150.000
3077 6021 SP MIXES SP-C PG70-22 TON 144.000 $150.000 $210.000 $211.450 $260.000 $175.000
3077 6075 TACK COAT GAL 217.000 $6.000 $7.000 $4.500 $5.000 $7.000
3080 6007 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 TON 2,437.000 $170.000 $180.000 $142.500 $200.000 $200.000
3080 6029 TACK COAT GAL 2,215.000 $3.500 $6.500 $4.500 $5.000 $7.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 116.000 $100.000 $58.000 $125.000 $125.000 $125.000
6056 6001 PREFORMED IN-LANE(TRANS) RUMBLE STRIP LF 176.000 $6.000 $32.000 $26.000 $25.000 $25.000
6185 6002 TMA (STATIONARY) DAY 47.000 $250.000 $250.000 $590.000 $330.000 $300.000
6185 6005 TMA (MOBILE OPERATION) DAY 22.000 $300.000 $1,000.000 $900.000 $400.000 $500.000
Totals: $802,039.63 $938,332.30 $940,112.31 $1,012,771.90 $1,037,316.00