PREPARING ROW
|
STA
|
45.000
|
$2,000.000
|
$1,750.000
|
$1,864.500
|
$10,000.000
|
$6,000.000
|
$31,000.000
|
$22,600.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
905.000
|
$30.000
|
$25.000
|
$11.630
|
$11.000
|
$36.000
|
$7.280
|
$14.590
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
166.000
|
$5.700
|
$12.000
|
$16.970
|
$30.000
|
$21.000
|
$17.950
|
$14.860
|
|
|
RMV STAB BASE & ASPH PV (17")
|
SY
|
931.000
|
$7.500
|
$17.000
|
$26.430
|
$22.000
|
$26.000
|
$10.460
|
$14.770
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
32.000
|
$1,300.000
|
$1,500.000
|
$2,986.410
|
$3,550.000
|
$1,400.000
|
$1,716.750
|
$1,219.660
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
12,449.000
|
$9.000
|
$14.000
|
$16.800
|
$20.000
|
$16.000
|
$10.000
|
$8.030
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
6,474.000
|
$10.000
|
$14.000
|
$17.190
|
$16.000
|
$25.000
|
$8.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
28,255.000
|
$10.000
|
$22.000
|
$19.960
|
$26.000
|
$21.000
|
$16.000
|
$12.380
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
41,100.000
|
$0.510
|
$1.250
|
$0.990
|
$0.480
|
$2.000
|
$0.650
|
$1.190
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
41,100.000
|
$0.340
|
$0.520
|
$0.660
|
$0.520
|
$0.640
|
$0.620
|
$0.520
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
20,550.000
|
$0.300
|
$0.500
|
$0.610
|
$0.480
|
$0.640
|
$0.620
|
$0.480
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
20,550.000
|
$0.300
|
$0.500
|
$0.610
|
$0.480
|
$0.640
|
$0.620
|
$0.480
|
|
|
VEGETATIVE WATERING
|
MG
|
411.000
|
$23.000
|
$15.000
|
$32.140
|
$30.000
|
$140.000
|
$25.000
|
$47.090
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(10")
|
SY
|
30,897.000
|
$18.000
|
$24.000
|
$18.390
|
$25.000
|
$35.000
|
$34.200
|
$38.630
|
|
|
CEMENT
|
TON
|
510.000
|
$130.000
|
$250.000
|
$267.150
|
$230.000
|
$240.000
|
$237.110
|
$263.410
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
30,897.000
|
$2.000
|
$3.750
|
$3.320
|
$3.400
|
$5.500
|
$3.200
|
$2.430
|
|
|
ASPH (RC-250)
|
GAL
|
10,240.000
|
$3.900
|
$5.000
|
$5.720
|
$5.500
|
$4.500
|
$5.150
|
$6.750
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
303.000
|
$100.000
|
$135.000
|
$101.610
|
$207.000
|
$338.000
|
$514.740
|
$124.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
10,484.000
|
$1.500
|
$2.500
|
$2.030
|
$3.600
|
$5.000
|
$2.150
|
$3.600
|
|
|
CEM STABIL BKFL
|
CY
|
456.000
|
$80.000
|
$200.000
|
$107.580
|
$174.000
|
$189.000
|
$194.030
|
$166.260
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,150.000
|
$20.000
|
$35.000
|
$40.000
|
$78.000
|
$30.000
|
$40.000
|
$39.230
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
3,804.000
|
$150.000
|
$200.000
|
$244.190
|
$210.000
|
$225.000
|
$200.000
|
$170.280
|
|
|
CL C CONC (ABUT)
|
CY
|
52.800
|
$1,000.000
|
$1,800.000
|
$1,516.330
|
$2,300.000
|
$2,700.000
|
$1,549.250
|
$2,368.210
|
|
|
CL C CONC (CAP)
|
CY
|
212.000
|
$1,200.000
|
$1,800.000
|
$1,963.560
|
$2,000.000
|
$2,300.000
|
$2,051.880
|
$1,942.910
|
|
|
CL C CONC (COLUMN)
|
CY
|
88.400
|
$1,000.000
|
$1,800.000
|
$1,748.490
|
$2,500.000
|
$2,000.000
|
$1,534.120
|
$1,674.650
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
47,300.000
|
$15.000
|
$20.000
|
$15.760
|
$22.000
|
$19.500
|
$20.000
|
$16.390
|
|
|
APPROACH SLAB
|
CY
|
200.400
|
$500.000
|
$800.000
|
$956.080
|
$790.000
|
$734.000
|
$579.410
|
$705.700
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
8,711.760
|
$140.000
|
$165.000
|
$214.350
|
$170.000
|
$163.000
|
$169.810
|
$200.160
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
2,177.920
|
$140.000
|
$175.000
|
$217.400
|
$170.000
|
$163.000
|
$147.370
|
$203.320
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
958.000
|
$320.000
|
$500.000
|
$480.920
|
$512.000
|
$488.000
|
$413.920
|
$520.270
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
9,857.000
|
$120.000
|
$150.000
|
$123.140
|
$171.000
|
$197.000
|
$184.900
|
$218.550
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
83.000
|
$400.000
|
$650.000
|
$596.830
|
$680.000
|
$1,280.000
|
$556.140
|
$697.360
|
|
|
RAIL (TY T223)
|
LF
|
1,128.000
|
$100.000
|
$150.000
|
$130.330
|
$175.000
|
$109.000
|
$70.560
|
$109.280
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
426.000
|
$75.000
|
$100.000
|
$123.730
|
$182.000
|
$127.000
|
$85.050
|
$144.900
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
86.000
|
$50.000
|
$100.000
|
$73.030
|
$70.000
|
$77.000
|
$121.090
|
$162.150
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
32.000
|
$140.000
|
$120.000
|
$168.330
|
$300.000
|
$338.000
|
$426.510
|
$355.620
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$800.000
|
$1,500.000
|
$1,246.450
|
$1,200.000
|
$1,325.000
|
$1,781.670
|
$2,371.990
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,050.000
|
$1,600.000
|
$1,953.790
|
$1,200.000
|
$1,325.000
|
$2,260.240
|
$2,904.030
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$600.000
|
$1,000.000
|
$500.360
|
$1,200.000
|
$1,325.000
|
$389.400
|
$667.500
|
|
|
REMOV STR (PIPE)
|
LF
|
48.000
|
$20.000
|
$35.000
|
$41.700
|
$60.000
|
$66.000
|
$40.740
|
$52.080
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$100,000.000
|
$128,477.430
|
$95,000.000
|
$200,000.000
|
$328,389.000
|
$216,782.990
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
2,571.000
|
$3.000
|
$5.000
|
$8.050
|
$2.400
|
$9.000
|
$2.890
|
$4.620
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$782,000.000
|
$1,050,000.000
|
$1,270,000.000
|
$1,000,000.000
|
$1,200,000.000
|
$1,400,000.000
|
$1,487,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$5,000.000
|
$3,500.000
|
$2,988.770
|
$6,000.000
|
$3,400.000
|
$2,500.000
|
$4,286.670
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
603.000
|
$30.000
|
$35.000
|
$44.450
|
$35.000
|
$45.000
|
$42.500
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
603.000
|
$10.000
|
$10.000
|
$12.700
|
$10.000
|
$12.000
|
$11.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$35.000
|
$35.000
|
$43.180
|
$34.000
|
$32.000
|
$44.920
|
$34.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$10.000
|
$12.000
|
$15.240
|
$12.000
|
$16.000
|
$18.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,938.000
|
$3.000
|
$4.000
|
$4.450
|
$3.800
|
$4.250
|
$4.000
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,938.000
|
$0.700
|
$1.000
|
$1.270
|
$1.000
|
$1.060
|
$1.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
3,870.000
|
$45.000
|
$45.000
|
$38.180
|
$40.000
|
$68.000
|
$30.460
|
$41.640
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,760.000
|
$15.000
|
$12.000
|
$11.680
|
$16.000
|
$10.000
|
$6.000
|
$5.240
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
3,870.000
|
$8.000
|
$12.000
|
$11.680
|
$17.000
|
$17.000
|
$7.650
|
$8.050
|
|
|
DRIVEWAYS (ACP)
|
SY
|
145.000
|
$40.000
|
$75.000
|
$82.050
|
$29.000
|
$145.000
|
$229.720
|
$112.140
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
17,532.000
|
$0.200
|
$0.550
|
$0.400
|
$0.730
|
$0.500
|
$0.310
|
$0.320
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,300.000
|
$20.000
|
$30.000
|
$32.390
|
$26.000
|
$31.000
|
$25.000
|
$25.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,000.000
|
$2,500.000
|
$2,667.190
|
$2,700.000
|
$2,400.000
|
$1,800.000
|
$2,100.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,100.000
|
$1,600.000
|
$1,968.640
|
$1,600.000
|
$1,500.000
|
$1,500.000
|
$1,550.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$1,100.000
|
$1,250.000
|
$1,587.610
|
$1,300.000
|
$1,400.000
|
$1,100.000
|
$1,250.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,000.000
|
$2.000
|
$2.000
|
$2.540
|
$2.000
|
$3.530
|
$2.000
|
$2.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
4.000
|
$170.000
|
$250.000
|
$317.520
|
$260.000
|
$306.000
|
$400.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,800.000
|
$3,500.000
|
$3,937.290
|
$3,200.000
|
$3,800.000
|
$3,000.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$270.000
|
$250.000
|
$317.520
|
$260.000
|
$480.000
|
$400.000
|
$250.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY III)
|
EA
|
2.000
|
$2,500.000
|
$3,500.000
|
$4,127.800
|
$3,900.000
|
$4,000.000
|
$3,300.000
|
$3,250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$1,500.000
|
$2,000.000
|
$1,350.060
|
$2,000.000
|
$2,000.000
|
$2,750.000
|
$1,850.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,000.000
|
$1,000.000
|
$486.390
|
$900.000
|
$960.000
|
$800.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$8,500.000
|
$10,000.000
|
$6,527.800
|
$8,500.000
|
$9,300.000
|
$8,800.000
|
$8,500.000
|
|
|
GATE (REMOVE)
|
EA
|
3.000
|
$550.000
|
$500.000
|
$437.910
|
$86.000
|
$520.000
|
$351.170
|
$979.030
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$225.000
|
$350.000
|
$444.530
|
$350.000
|
$358.000
|
$315.000
|
$350.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$250.000
|
$400.000
|
$508.040
|
$400.000
|
$398.000
|
$350.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$520.000
|
$600.000
|
$717.600
|
$580.000
|
$761.000
|
$670.000
|
$565.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$650.000
|
$700.000
|
$844.620
|
$680.000
|
$847.000
|
$745.000
|
$665.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$400.000
|
$500.000
|
$603.300
|
$500.000
|
$790.000
|
$695.000
|
$475.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$350.000
|
$650.000
|
$806.500
|
$650.000
|
$895.000
|
$788.000
|
$635.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$100.000
|
$125.000
|
$146.060
|
$125.000
|
$114.000
|
$100.000
|
$115.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
12.000
|
$25.000
|
$30.000
|
$32.390
|
$26.000
|
$61.000
|
$24.000
|
$25.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
19.000
|
$30.000
|
$30.000
|
$38.100
|
$31.000
|
$83.000
|
$24.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
6.000
|
$80.000
|
$100.000
|
$114.310
|
$92.000
|
$268.000
|
$70.000
|
$90.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
11,053.000
|
$0.200
|
$0.550
|
$0.660
|
$0.540
|
$0.550
|
$0.520
|
$0.660
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
|
LF
|
39.000
|
$0.500
|
$1.000
|
$1.270
|
$1.050
|
$3.200
|
$1.000
|
$1.450
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
15,300.000
|
$0.200
|
$0.550
|
$0.660
|
$0.540
|
$0.550
|
$0.520
|
$0.660
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
1,225.000
|
$1.000
|
$1.250
|
$1.560
|
$1.250
|
$2.150
|
$1.230
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
4,745.000
|
$0.500
|
$1.250
|
$1.560
|
$1.250
|
$1.600
|
$1.230
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
57.000
|
$1.500
|
$4.000
|
$4.450
|
$3.600
|
$5.300
|
$3.500
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,629.000
|
$1.400
|
$2.500
|
$2.830
|
$2.300
|
$2.650
|
$2.230
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
10,806.000
|
$1.000
|
$1.250
|
$1.560
|
$1.250
|
$1.600
|
$1.230
|
$1.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
464.000
|
$1.000
|
$1.500
|
$0.710
|
$1.600
|
$2.150
|
$3.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,164.000
|
$1.000
|
$1.500
|
$0.710
|
$1.600
|
$2.150
|
$3.000
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,210.000
|
$1.000
|
$2.000
|
$2.480
|
$2.000
|
$1.600
|
$1.950
|
$1.800
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
160.000
|
$0.100
|
$0.600
|
$0.740
|
$0.600
|
$2.150
|
$0.580
|
$0.750
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
1,226.000
|
$0.100
|
$0.600
|
$0.740
|
$0.600
|
$1.050
|
$0.580
|
$0.750
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
2,452.000
|
$0.100
|
$0.600
|
$0.740
|
$0.600
|
$1.050
|
$0.580
|
$0.750
|
|
|
PAVEMENT SEALER 6"
|
LF
|
3,838.000
|
$0.100
|
$0.100
|
$0.130
|
$0.100
|
$1.050
|
$0.100
|
$0.750
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,180.000
|
$0.300
|
$0.950
|
$1.210
|
$1.000
|
$1.050
|
$0.950
|
$0.900
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
10,250.000
|
$0.300
|
$0.950
|
$1.140
|
$0.920
|
$0.800
|
$0.900
|
$0.840
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
23,281.000
|
$0.300
|
$0.950
|
$1.140
|
$0.920
|
$0.800
|
$0.900
|
$0.840
|
|
REFL PAV MRKR TY I-C
|
EA
|
58.000
|
$3.000
|
$7.000
|
$8.890
|
$7.200
|
$6.300
|
$0.700
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
60.000
|
$3.100
|
$7.000
|
$8.890
|
$7.200
|
$6.300
|
$0.700
|
$20.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,606.000
|
$0.500
|
$0.500
|
$0.620
|
$0.500
|
$0.550
|
$0.490
|
$0.800
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
310.000
|
$1.000
|
$1.000
|
$1.270
|
$1.000
|
$1.060
|
$1.000
|
$2.600
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
3,838.000
|
$0.100
|
$0.100
|
$0.010
|
$0.010
|
$0.550
|
$0.010
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
68.000
|
$1.000
|
$1.000
|
$0.640
|
$0.520
|
$5.300
|
$0.500
|
$0.500
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
12,878.000
|
$100.000
|
$103.000
|
$109.500
|
$137.000
|
$118.000
|
$151.400
|
$122.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$7,500.000
|
$12,400.000
|
$6,350.460
|
$12,800.000
|
$16,000.000
|
$10,876.520
|
$20,132.770
|
|
|
TMA (STATIONARY)
|
DAY
|
239.000
|
$275.000
|
$250.000
|
$204.480
|
$200.000
|
$170.000
|
$69.340
|
$291.250
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$300.000
|
$500.000
|
$506.130
|
$480.000
|
$170.000
|
$1,073.900
|
$659.130
|
|
Totals: |
$9,446,098.300
|
$12,337,845.250
|
$12,700,646.616
|
$14,116,887.690
|
$14,390,631.370
|
$14,968,425.178
|
$14,981,423.124
|