CHEROKEE US 69 (0199-01-090)

Items: 65

County: CHEROKEE
Length: 0.0000 MILES (1.2830 MILES)
Highway: US 69
District: TYLER
Control Number: 0199-01-090
DBE Goal: 0.0%
Project: STP 2026(743)HES
Guaranty: $26,000.00
Time: 83 WORKING DAYS
Engineer's Estimate: $1,304,447.86
Date: 07/01/2026 1:00 PM CDT (17 days ago)
Contract Number: 7263023
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206448
Contract Type: FEDERAL
Project Description: INCREASE SUPER-ELEVATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JOSH FULTON
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,304,447.86
$1,093,711.80
Over/Under Est: -16.16% -$210,736.06
Over/Under Est: -5.39% -$70,360.76
Amt Left: 12.83% $140,375.30
Over/Under Est: 2.21% $28,772.14
Amt Left: 21.9% $239,508.20
Delta: -8.03% -$99,132.90

Bid Items & Bid Tabulations

65 Total 0 of 65
CHEROKEE  |  US 69  |  TYLER  |  0199-01-090  |  07/01/2026 1:00 PM CDT  |  $1,304,447.86  |  STP 2026(743)HES  |  HAZARD ELIM & SAFETY  |  83 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REYNOLDS & KAY, LTD.
BIG CREEK CONSTRUCTION, LTD.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PREPARING ROW
STA 87.000 $3,250.000 $2,700.000 $3,000.000 $1,850.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 328.000 $12.000 $20.000 $40.000 $40.000
EMBANK (VEH)(OC)(TY C)
CY 634.000 $50.000 $40.000 $35.000 $50.000
BACKFILL (TY A)
STA 15.000 $240.000 $800.000 $300.000 $1,700.000
BLADING
STA 48.000 $500.000 $170.000 $75.000 $200.000
FURN & PLACE TOPSOIL (4")
SY 3,755.000 $4.000 $5.000 $2.500 $12.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 1,878.000 $1.000 $0.150 $0.300 $1.250
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 3,755.000 $1.000 $0.800 $0.140 $3.000
BOND FBR MTRX SEED (TEMP)(WARM)
SY 1,878.000 $1.000 $0.800 $1.250 $3.000
BOND FBR MTRX SEED (TEMP)(COOL)
SY 1,878.000 $1.000 $0.800 $1.250 $3.000
VEGETATIVE WATERING
TGL 103.000 $26.000 $15.000 $75.000 $25.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 88.000 $2.000 $11.000 $10.000 $6.000
ASPH (CHFRS-2P OR CRS-2P)
GAL 1,490.000 $30.000 $9.000 $5.000 $5.000
AGGR (TY-D OR L, GR-4)
CY 33.000 $200.000 $350.000 $300.000 $250.000
PFC-C PG76-22 SAC-A
TON 304.000 $170.000 $275.000 $275.000 $425.000
SP MIXES SP-C PG64-22
TON 432.000 $165.000 $150.000 $175.000 $215.000
SP MIXES SP-D PG64-22 (LEVEL-UP)
TON 234.000 $175.000 $150.000 $195.000 $245.000
TACK COAT
GAL 392.000 $8.000 $3.000 $5.000 $4.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 250.000 $60.000 $88.000 $115.000 $100.000
PLANE ASPH CONC PAV (1.5")
SY 3,780.000 $3.500 $4.000 $2.250 $4.000
PLANE ASPH CONC PAV (0" TO 2-1/2")
SY 1,960.000 $7.000 $5.500 $2.500 $4.500
TEMPORARY SPL SHORING
SF 528.000 $40.000 $55.000 $35.000 $50.000
CL A CONC (COLLAR)
EA 2.000 $1,400.000 $1,000.000 $1,350.000 $1,750.000
RIPRAP (MOW STRIP)(4 IN)
CY 181.000 $700.000 $660.000 $915.000 $1,000.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 10.000 $200.000 $325.000 $325.000 $350.000
RC PIPE (CL III)(18 IN)
LF 74.000 $75.000 $68.000 $75.000 $90.000
RC PIPE (CL III)(24 IN)
LF 30.000 $100.000 $86.000 $160.000 $140.000
RC PIPE (CL III)(30 IN)
LF 4.000 $262.500 $210.000 $275.000 $250.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 1.000 $15,000.000 $10,400.000 $5,500.000 $7,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $15,000.000 $12,000.000 $9,000.000 $11,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $40,000.000 $25,000.000 $31,000.000 $50,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $1,500.000 $1,200.000 $1,050.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $1,600.000 $2,750.000 $1,700.000
CLEAN EXIST CULVERTS
EA 2.000 $2,000.000 $1,600.000 $2,250.000 $2,100.000
REMOV STR (PIPE)
EA 4.000 $1,000.000 $500.000 $1,350.000 $500.000
MOBILIZATION
LS 1.000 $131,283.210 $100,000.000 $120,000.000 $110,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,000.000 $2,200.000 $2,400.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 147.000 $210.000 $90.000 $80.000 $100.000
TMA (STATIONARY)
DAY 82.000 $200.000 $150.000 $200.000 $400.000
TMA (MOBILE OPERATION)
DAY 4.000 $250.000 $200.000 $1,100.000 $200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 150.000 $47.000 $40.000 $55.000 $50.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 50.000 $84.000 $60.000 $150.000 $98.000
ROCK FILTER DAMS (REMOVE)
LF 75.000 $13.910 $10.000 $11.000 $15.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 10.000 $100.000 $25.000 $200.000 $75.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 5.000 $145.000 $60.000 $113.000 $100.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 250.000 $4.500 $5.000 $5.000 $5.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 250.000 $2.500 $0.900 $2.000 $1.000
DRIVEWAYS (ACP)
SY 472.000 $75.000 $50.000 $87.000 $60.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 2,720.000 $2.000 $2.200 $1.100 $2.250
MTL W-BEAM GD FEN (STEEL POST)
LF 2,850.000 $32.500 $30.000 $34.000 $31.250
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,500.000 $1,350.000 $1,650.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,529.620 $2,000.000 $3,400.000 $3,225.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 31.000 $32.200 $28.000 $28.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 31.000 $29.160 $20.000 $27.500 $105.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 1,360.000 $0.600 $2.200 $2.500 $3.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 1,360.000 $1.000 $2.200 $2.600 $3.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 306.000 $2.000 $1.500 $2.000 $5.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 306.000 $2.000 $1.500 $2.000 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 102.000 $2.500 $1.150 $2.500 $10.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 340.000 $4.750 $2.200 $3.500 $3.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 1,360.000 $1.500 $2.200 $3.000 $3.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 1,360.000 $1.500 $2.200 $3.000 $3.000
REFL PAV MRKR TY II-C-R
EA 17.000 $5.000 $11.000 $7.000 $15.000
FULL - WIDTH MOWING
CYC 2.000 $5,250.000 $2,100.000 $1,250.000 $3,500.000
LITTER REMOVAL
CYC 2.000 $2,500.000 $500.000 $4,200.000 $1,000.000
Totals: $1,304,447.860 $1,093,711.800 $1,234,087.100 $1,333,220.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
Total: $1,500.00