Job Info for 1564-01-036

County: WASHINGTON Highway: FM 2780 Date: 10/01/2024 (7 weeks ago) Changed Engineer's Estimate: $20,997,387 Control Number: 1564-01-036
Project: C 1564-1-36 District: BRYAN Time: 293 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
Bidder's List

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $20,997,386.58
KNIFE RIVER CORPORATION - SOUTH   $17,441,398.88 1
-16.94% | -$3,555,987.70
BIG CREEK CONSTRUCTION, LTD.   $18,087,890.80 2
-13.86% | -$2,909,495.78
3.71% | $646,491.92
LARRY YOUNG PAVING, INC.   $18,366,049.25 3
-12.53% | -$2,631,337.33
5.3% | $924,650.37
1.54% | $278,158.45
TEXAS MATERIALS GROUP, INC.   $18,698,909.14 4
-10.95% | -$2,298,477.44
7.21% | $1,257,510.26
1.81% | $332,859.89
HUNTER INDUSTRIES, LTD.   $20,867,066.24 5
-0.62% | -$130,320.34
19.64% | $3,425,667.36
11.60% | $2,168,157.10

Bid Items

Items: 122, 0 filtered
WASHINGTON FM 2780  |  BRYAN  |  1564-01-036  |  10/01/2024  |  $20,997,387  |  C 1564-1-36  |  REHAB EXIST ROADWAY  |  293 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate KNIFE RIVER CORPORATION - SOUTH BIG CREEK CONSTRUCTION, LTD. LARRY YOUNG PAVING, INC. TEXAS MATERIALS GROUP, INC. HUNTER INDUSTRIES, LTD.
100 6002 PREPARING ROW STA 475.600 $2,500.000 $260.000 $1,000.000 $250.000 $615.000 $654.900
105 6002 REMOVING STAB BASE AND ASPH PAV (2") SY 126,858.000 $1.450 $0.800 $2.000 $2.500 $1.900 $1.650
105 6079 REMOVING STAB BASE & ASPH PAV (4"-12") SY 8,646.000 $4.500 $1.000 $10.000 $6.500 $12.000 $5.900
110 6001 EXCAVATION (ROADWAY) CY 21,090.000 $12.500 $7.250 $23.000 $14.000 $16.000 $11.800
110 6002 EXCAVATION (CHANNEL) CY 81.000 $25.000 $55.000 $100.000 $64.000 $190.000 $77.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 35.000 $40.000 $80.000 $200.000 $51.000 $120.000 $115.500
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 13,947.000 $17.500 $6.000 $23.000 $11.000 $16.000 $10.500
134 6011 BACKFILLING PAVEMENT EDGES CY 172.000 $100.000 $100.000 $250.000 $350.000 $300.000 $77.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 96,090.000 $2.130 $0.400 $1.000 $1.250 $0.900 $0.940
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 96,090.000 $0.400 $0.250 $0.200 $0.250 $0.250 $0.170
164 6009 BROADCAST SEED (TEMP) (WARM) SY 48,045.000 $0.250 $0.250 $0.200 $0.250 $0.240 $0.150
164 6011 BROADCAST SEED (TEMP) (COOL) SY 48,045.000 $0.250 $0.250 $0.200 $0.250 $0.240 $0.150
168 6001 VEGETATIVE WATERING MG 962.000 $28.000 $100.000 $20.000 $52.000 $35.000 $31.500
247 6230 FL BS (CMP IN PLACE)(TY A GR 1-2)(8") SY 173,537.000 $22.500 $24.000 $20.000 $25.000 $21.000 $19.380
251 6134 REWORK BS MTL (TY C) (0"-8")(DENS CONT) SY 35,610.000 $5.500 $0.750 $3.000 $2.500 $3.700 $3.120
251 6244 REWORK BS MTL(TY B)(5"-14")(DENS CONT) SY 85,679.000 $7.500 $0.500 $6.000 $2.750 $3.900 $12.900
260 6009 LIME TRT (EXST MATL)(10") SY 87,210.000 $8.500 $2.100 $3.000 $1.500 $4.500 $3.600
260 6012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 1,454.000 $210.000 $310.000 $350.000 $175.000 $310.000 $352.000
275 6001 CEMENT TON 5,529.000 $242.000 $245.000 $100.000 $290.000 $210.000 $242.000
275 6006 CEMENT TREAT (EXIST MATL) (10") SY 173,537.000 $5.760 $2.500 $5.000 $4.250 $3.150 $3.120
276 6184 CEM TRT(PLNT MX) (CL L)(TY D)(GR 4)(6") SY 883.000 $47.500 $35.000 $45.000 $38.000 $71.000 $125.000
316 6029 ASPH (RC-250) GAL 38,370.000 $6.250 $9.000 $4.000 $6.000 $5.000 $5.360
316 6403 AGGR (TY-B GR-5 OR TY-L GR-5) CY 1,129.000 $145.000 $130.000 $100.000 $130.000 $188.000 $116.850
400 6002 STRUCT EXCAV (BOX) CY 254.000 $42.000 $100.000 $50.000 $33.000 $18.000 $47.960
400 6003 STRUCT EXCAV (PIPE) CY 245.000 $42.000 $100.000 $52.000 $33.000 $18.000 $49.050
400 6005 CEM STABIL BKFL CY 1,120.000 $135.000 $155.000 $200.000 $130.000 $200.000 $211.460
400 6006 CUT & RESTORING PAV SY 3,452.000 $120.000 $49.990 $60.000 $50.000 $1.000 $126.440
402 6001 TRENCH EXCAVATION PROTECTION LF 764.000 $15.000 $45.000 $10.000 $1.000 $15.000 $3.270
403 6001 TEMPORARY SPL SHORING SF 5,106.000 $35.000 $55.000 $25.000 $20.000 $1.000 $52.500
416 6003 DRILL SHAFT (30 IN) LF 24.000 $358.270 $205.000 $300.000 $270.000 $210.000 $918.040
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 157.000 $220.000 $25.000 $100.000 $270.000 $190.000 $209.640
432 6001 RIPRAP (CONC)(4 IN) CY 181.000 $650.000 $850.000 $710.000 $680.000 $750.000 $931.000
432 6002 RIPRAP (CONC)(5 IN) CY 23.000 $725.000 $900.000 $720.000 $740.000 $870.000 $884.560
432 6009 RIPRAP (CONC) (CL B) (4") CY 1.050 $650.000 $1,500.000 $1,000.000 $3,000.000 $2,500.000 $2,680.670
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 581.000 $200.000 $200.000 $140.000 $210.000 $195.000 $234.370
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 293.000 $650.000 $825.000 $710.000 $710.000 $830.000 $931.000
462 6007 CONC BOX CULV (5 FT X 3 FT) LF 66.000 $500.000 $600.000 $325.000 $650.000 $750.000 $772.800
462 6008 CONC BOX CULV (5 FT X 4 FT) LF 168.000 $545.000 $550.000 $375.000 $640.000 $800.000 $713.940
462 6012 CONC BOX CULV (6 FT X 5 FT) LF 96.000 $750.000 $1,600.000 $625.000 $780.000 $1,050.000 $1,524.900
462 6013 CONC BOX CULV (6 FT X 6 FT) LF 86.000 $900.000 $1,900.000 $1,725.000 $970.000 $1,400.000 $2,217.040
462 6014 CONC BOX CULV (7 FT X 3 FT) LF 172.000 $840.000 $800.000 $750.000 $820.000 $970.000 $1,034.400
462 6030 CONC BOX CULV (10 FT X 6 FT) LF 84.000 $1,400.000 $1,800.000 $1,850.000 $1,500.000 $1,500.000 $1,993.590
464 6003 RC PIPE (CL III)(18 IN) LF 1,092.000 $80.000 $62.000 $75.000 $74.000 $135.000 $117.720
464 6005 RC PIPE (CL III)(24 IN) LF 130.000 $130.000 $125.000 $165.000 $100.000 $176.000 $141.700
464 6007 RC PIPE (CL III)(30 IN) LF 158.000 $180.000 $150.000 $200.000 $130.000 $200.000 $178.760
464 6008 RC PIPE (CL III)(36 IN) LF 178.000 $220.000 $175.000 $250.000 $170.000 $280.000 $228.900
464 6009 RC PIPE (CL III)(42 IN) LF 84.000 $265.000 $210.000 $290.000 $220.000 $335.000 $311.740
464 6010 RC PIPE (CL III)(48 IN) LF 52.000 $320.000 $245.000 $325.000 $290.000 $380.000 $408.750
464 6018 RC PIPE (CL IV)(24 IN) LF 214.000 $150.000 $135.000 $170.000 $110.000 $180.000 $158.050
464 6025 RC PIPE (CL V)(18 IN) LF 1,236.000 $125.000 $72.000 $90.000 $88.000 $165.000 $144.970
465 6153 INLET (COMPL)(PAZD)(RC)(4FTX4FT) EA 1.000 $13,500.000 $7,000.000 $9,300.000 $5,000.000 $7,000.000 $4,585.590
466 6097 HEADWALL (CH - PW - 0) (DIA= 24 IN) EA 3.000 $5,750.000 $20,000.000 $6,025.000 $8,900.000 $8,000.000 $10,957.680
466 6099 HEADWALL (CH - PW - 0) (DIA= 30 IN) EA 2.000 $6,600.000 $20,000.000 $6,850.000 $14,000.000 $11,000.000 $19,933.750
466 6101 HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 3.000 $8,500.000 $21,000.000 $7,425.000 $15,000.000 $11,000.000 $19,285.200
466 6102 HEADWALL (CH - PW - 0) (DIA= 42 IN) EA 2.000 $15,500.000 $23,500.000 $8,575.000 $13,000.000 $12,000.000 $19,650.350
466 6103 HEADWALL (CH - PW - 0) (DIA= 48 IN) EA 2.000 $12,000.000 $24,500.000 $10,200.000 $22,000.000 $14,000.000 $23,890.410
466 6156 WINGWALL (FW - 0) (HW=9 FT) EA 2.000 $17,438.000 $31,000.000 $24,700.000 $42,000.000 $50,000.000 $49,663.240
466 6179 WINGWALL (PW - 1) (HW=4 FT) EA 3.000 $18,500.000 $23,000.000 $20,700.000 $23,000.000 $24,000.000 $32,707.350
466 6180 WINGWALL (PW - 1) (HW=5 FT) EA 3.000 $25,500.000 $23,000.000 $21,700.000 $25,000.000 $20,000.000 $31,768.870
466 6181 WINGWALL (PW - 1) (HW=6 FT) EA 4.000 $30,000.000 $26,000.000 $24,400.000 $28,000.000 $24,000.000 $32,095.860
466 6182 WINGWALL (PW - 1) (HW=7 FT) EA 3.000 $35,000.000 $30,000.000 $22,200.000 $30,000.000 $21,000.000 $33,316.650
466 6183 WINGWALL (PW - 1) (HW=8 FT) EA 3.000 $38,000.000 $34,500.000 $43,200.000 $35,000.000 $39,000.000 $62,752.940
466 6184 WINGWALL (PW - 1) (HW=9 FT) EA 2.000 $47,000.000 $43,000.000 $63,100.000 $38,000.000 $57,000.000 $92,878.100
467 6356 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 1.000 $2,000.000 $750.000 $1,150.000 $1,100.000 $1,200.000 $3,604.600
467 6362 SET (TY II) (18 IN) (RCP) (6: 1) (C) EA 1.000 $2,400.000 $1,200.000 $1,775.000 $1,400.000 $1,500.000 $3,764.830
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 110.000 $1,450.000 $800.000 $1,775.000 $1,400.000 $1,500.000 $3,747.390
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 3.000 $1,850.000 $1,200.000 $1,575.000 $1,300.000 $1,800.000 $3,711.420
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 8.000 $1,750.000 $1,400.000 $2,050.000 $1,400.000 $1,800.000 $3,853.120
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 4.000 $3,100.000 $2,100.000 $2,400.000 $2,500.000 $3,000.000 $4,417.730
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 2.000 $5,000.000 $3,000.000 $3,200.000 $3,700.000 $4,000.000 $5,567.670
496 6004 REMOV STR (SET) EA 18.000 $650.000 $600.000 $400.000 $410.000 $600.000 $422.920
496 6005 REMOV STR (WINGWALL) EA 8.000 $2,000.000 $2,650.000 $2,900.000 $4,900.000 $2,200.000 $6,933.430
496 6006 REMOV STR (HEADWALL) EA 13.000 $1,555.000 $2,100.000 $2,200.000 $3,000.000 $1,900.000 $567.890
496 6007 REMOV STR (PIPE) LF 2,993.000 $40.000 $14.000 $41.000 $34.000 $19.000 $20.710
496 6008 REMOV STR (BOX CULVERT) LF 24.000 $130.000 $500.000 $400.000 $66.000 $190.000 $118.810
500 6001 MOBILIZATION LS 1.000 $1,197,500.000 $869,000.000 $1,800,000.000 $1,043,200.000 $1,450,000.000 $1,883,515.720
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 20.000 $8,500.000 $15,500.000 $5,000.000 $18,000.000 $6,000.000 $12,357.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 3,360.000 $40.000 $36.000 $40.000 $36.000 $36.000 $65.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 3,360.000 $13.250 $10.000 $10.000 $10.000 $10.000 $11.000
506 6034 CONSTRUCTION PERIMETER FENCE LF 70.000 $7.500 $4.000 $10.000 $4.000 $4.000 $5.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 14,320.000 $4.380 $3.500 $4.000 $3.500 $3.500 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 14,320.000 $1.020 $1.000 $1.000 $1.000 $1.000 $1.000
530 6002 INTERSECTIONS (ACP) SY 748.000 $60.000 $55.000 $80.000 $68.000 $115.000 $55.200
530 6004 DRIVEWAYS (CONC) SY 164.000 $110.000 $115.000 $165.000 $440.000 $158.000 $127.000
530 6005 DRIVEWAYS (ACP) SY 2,065.000 $60.000 $100.000 $50.000 $55.000 $95.000 $55.200
530 6006 DRIVEWAYS (SURF TREAT) SY 7,636.000 $45.000 $33.000 $25.000 $36.000 $42.000 $50.600
530 6008 TURNOUTS (ACP) SY 524.000 $90.000 $110.000 $50.000 $53.000 $145.000 $55.200
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 2,825.000 $30.000 $26.500 $39.000 $21.000 $27.000 $20.640
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 2.000 $2,500.000 $1,560.000 $2,000.000 $1,300.000 $1,600.000 $1,311.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 30.000 $3,500.000 $2,900.000 $3,400.000 $3,000.000 $3,000.000 $3,012.000
560 6001 MAILBOX INSTALL-S (TWG-POST) TY 1 EA 17.000 $340.000 $195.000 $250.000 $230.000 $360.000 $225.000
560 6002 MAILBOX INSTALL-D (TWG-POST) TY 1 EA 3.000 $400.000 $210.000 $300.000 $250.000 $430.000 $245.000
560 6003 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 2.000 $575.000 $450.000 $500.000 $550.000 $720.000 $545.000
610 6214 IN RD IL (TY SA) 40T-8 (250W EQ) LED EA 3.000 $7,335.000 $5,965.000 $7,000.000 $6,700.000 $6,100.000 $7,950.000
618 6023 CONDT (PVC) (SCH 40) (2") LF 340.000 $22.730 $7.500 $10.000 $15.000 $7.200 $25.000
618 6024 CONDT (PVC) (SCH 40) (2") (BORE) LF 220.000 $52.580 $19.000 $20.000 $20.000 $19.000 $55.000
620 6008 ELEC CONDR (NO.8) INSULATED LF 1,680.000 $3.310 $2.250 $3.000 $1.750 $2.200 $2.400
624 6010 GROUND BOX TY D (162922)W/APRON EA 3.000 $2,138.000 $1,500.000 $1,750.000 $1,000.000 $1,500.000 $2,550.000
628 6145 ELC SRV TY D 120/240 060(NS)SS(E)SP(O) EA 1.000 $8,500.000 $6,900.000 $7,500.000 $7,700.000 $7,000.000 $7,800.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 80.000 $720.000 $550.000 $600.000 $450.000 $420.000 $446.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 70.000 $751.000 $675.000 $700.000 $580.000 $570.000 $584.000
644 6076 REMOVE SM RD SN SUP&AM EA 170.000 $111.220 $75.000 $125.000 $60.000 $75.000 $60.000
658 6101 INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF EA 54.000 $120.000 $100.000 $125.000 $120.000 $130.000 $120.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 9,500.000 $2.000 $1.000 $1.500 $0.500 $1.100 $1.840
666 6308 RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) LF 93,782.000 $0.750 $0.750 $0.800 $0.750 $0.730 $0.720
666 6317 RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) LF 3,941.000 $2.330 $0.750 $0.800 $0.750 $0.740 $0.730
666 6320 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 70,563.000 $0.750 $0.750 $0.800 $0.750 $0.730 $0.720
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 325.000 $20.000 $15.000 $18.000 $15.000 $15.000 $15.000
672 6009 REFL PAV MRKR TY II-A-A EA 1,081.000 $4.500 $6.000 $7.000 $6.000 $6.000 $6.000
752 6005 TREE REMOVAL (4" - 12" DIA) EA 10.000 $650.000 $400.000 $750.000 $480.000 $450.000 $385.000
752 6006 TREE REMOVAL (12" - 18" DIA) EA 5.000 $1,100.000 $800.000 $1,500.000 $750.000 $880.000 $825.000
752 6007 TREE REMOVAL (18" - 24" DIA) EA 7.000 $750.000 $1,200.000 $2,000.000 $1,000.000 $1,350.000 $1,650.000
752 6008 TREE REMOVAL (24" - 30" DIA) EA 1.000 $800.000 $1,900.000 $3,000.000 $1,400.000 $2,100.000 $2,750.000
752 6022 TREE TRIMMING AND BRUSH REMOVAL LF 500.000 $75.000 $15.000 $25.000 $20.000 $50.000 $55.000
780 6002 CNC CRACK REPAIR (DISCRETE)(INJECT) LF 98.000 $1,500.000 $170.000 $100.000 $120.000 $275.000 $315.010
3077 6012 SP MIXES SP-C SAC-A PG64-22 TON 26,160.000 $135.000 $125.000 $115.000 $130.000 $142.000 $130.800
3077 6075 TACK COAT GAL 15,855.000 $7.500 $5.000 $4.000 $4.250 $4.000 $3.320
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $15,000.000 $22,000.000 $12,000.000 $12,000.000 $10,000.000 $7,554.190
6056 6001 PREFORMED IN-LANE(TRANS) RUMBLE STRIP LF 9,460.000 $4.950 $4.700 $6.000 $4.750 $4.800 $4.700
6056 6002 PREFORMED CENTERLINE RUMBLE STRIP LF 9,640.000 $4.210 $3.000 $5.000 $3.000 $3.000 $3.000
6185 6002 TMA (STATIONARY) DAY 423.000 $350.000 $600.000 $400.000 $260.000 $250.000 $302.170
6185 6005 TMA (MOBILE OPERATION) DAY 22.000 $515.000 $900.000 $800.000 $790.000 $400.000 $503.610
Totals: $20,997,386.58 $17,441,398.88 $18,087,890.80 $18,366,049.25 $18,698,909.14 $20,867,066.24