REMOVING CONC (MEDIANS)
|
SY
|
40.000
|
$55.000
|
$50.000
|
$58.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
193.000
|
$15.500
|
$25.000
|
$66.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
51.000
|
$12.500
|
$50.000
|
$12.000
|
$20.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12"-14")
|
SY
|
11,451.000
|
$10.000
|
$15.000
|
$12.900
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,459.000
|
$25.000
|
$32.000
|
$41.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
974.000
|
$35.000
|
$32.000
|
$61.000
|
$35.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
966.050
|
$160.000
|
$250.000
|
$200.000
|
$250.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
74.150
|
$275.000
|
$250.000
|
$1,300.000
|
$250.000
|
|
|
BLOCK SODDING
|
SY
|
7,149.000
|
$4.250
|
$7.000
|
$6.500
|
$10.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
7,149.000
|
$0.300
|
$1.000
|
$0.250
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,136.000
|
$10.000
|
$35.000
|
$15.000
|
$20.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
270.000
|
$310.000
|
$350.000
|
$245.000
|
$350.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
18,805.000
|
$5.000
|
$7.500
|
$6.500
|
$8.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
3,764.000
|
$8.000
|
$7.000
|
$5.000
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
117.000
|
$65.000
|
$70.000
|
$130.000
|
$75.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
2,835.000
|
$105.000
|
$120.000
|
$135.000
|
$120.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
451,156.000
|
$2.000
|
$2.000
|
$2.000
|
$3.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
29,817.000
|
$2.500
|
$4.000
|
$3.000
|
$5.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
41.000
|
$110.000
|
$275.000
|
$200.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
350.300
|
$550.000
|
$1,250.000
|
$750.000
|
$500.000
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
256.000
|
$80.000
|
$70.000
|
$88.934
|
$65.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
80.000
|
$110.000
|
$75.000
|
$124.739
|
$85.000
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,000.000
|
$1,100.000
|
$1,385.989
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,250.000
|
$1,400.000
|
$2,148.284
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
229.000
|
$25.750
|
$65.000
|
$17.325
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,159,280.810
|
$1,200,000.000
|
$979,000.000
|
$1,600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$10,000.000
|
$3,450.000
|
$9,000.000
|
$8,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
234.000
|
$33.000
|
$35.000
|
$30.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$11.500
|
$15.000
|
$12.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,404.000
|
$3.000
|
$4.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,404.000
|
$0.750
|
$1.500
|
$0.500
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
11.000
|
$5.500
|
$15.000
|
$8.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
11.000
|
$1.250
|
$6.000
|
$1.000
|
$9.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
97.000
|
$58.000
|
$60.000
|
$225.000
|
$45.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
133.000
|
$140.000
|
$250.000
|
$250.000
|
$125.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
144,350.000
|
$0.350
|
$0.200
|
$0.110
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
70,414.000
|
$0.350
|
$0.200
|
$0.100
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,000.000
|
$25.750
|
$35.000
|
$25.000
|
$26.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
32.000
|
$3,000.000
|
$3,000.000
|
$3,600.000
|
$3,250.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
4.000
|
$400.000
|
$350.000
|
$300.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
17.000
|
$750.000
|
$750.000
|
$700.000
|
$1,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
34.000
|
$625.000
|
$600.000
|
$600.000
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
21.000
|
$700.000
|
$700.000
|
$750.000
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
190.000
|
$20.000
|
$50.000
|
$20.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
105.000
|
$23.000
|
$25.000
|
$20.000
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
847.000
|
$1.000
|
$1.500
|
$0.750
|
$6.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
15,797.000
|
$1.000
|
$1.500
|
$0.750
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
276.000
|
$4.000
|
$3.000
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,248.000
|
$1.450
|
$1.500
|
$0.800
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,067.000
|
$8.750
|
$12.000
|
$6.250
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
87.000
|
$190.000
|
$250.000
|
$140.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
41.000
|
$200.000
|
$350.000
|
$150.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
4.000
|
$500.000
|
$1,000.000
|
$350.000
|
$500.000
|
|
|
RE PM TY II(ACC PRK)(WHT)(SYMBOL ONLY)
|
EA
|
9.000
|
$500.000
|
$750.000
|
$75.000
|
$250.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
20,815.000
|
$0.350
|
$0.400
|
$0.350
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
118.000
|
$2.500
|
$3.500
|
$2.000
|
$5.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
2.000
|
$150.000
|
$300.000
|
$125.000
|
$150.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,842.000
|
$0.600
|
$0.600
|
$0.800
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
320.000
|
$0.600
|
$1.100
|
$0.650
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
216,048.000
|
$0.600
|
$0.700
|
$0.580
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
16,900.000
|
$0.600
|
$0.900
|
$0.620
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
148,159.000
|
$0.600
|
$0.700
|
$0.580
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
398.000
|
$3.750
|
$6.000
|
$3.900
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,180.000
|
$4.500
|
$6.000
|
$3.800
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
20,815.000
|
$0.500
|
$0.700
|
$0.600
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
118.000
|
$3.000
|
$7.000
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
2.000
|
$275.000
|
$300.000
|
$150.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
20,815.000
|
$0.250
|
$0.100
|
$0.400
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
118.000
|
$1.000
|
$3.000
|
$0.500
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
2.000
|
$45.000
|
$75.000
|
$40.000
|
$100.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
11,735.000
|
$120.000
|
$110.000
|
$148.000
|
$135.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
54,936.000
|
$123.000
|
$112.000
|
$149.000
|
$155.000
|
|
|
TACK COAT
|
GAL
|
52,729.000
|
$3.750
|
$4.000
|
$4.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$12,000.000
|
$17,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
191.000
|
$600.000
|
$400.000
|
$2,100.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
418.000
|
$75.000
|
$85.000
|
$175.000
|
$55.000
|
|
Totals: |
$12,752,088.910
|
$12,687,858.400
|
$15,066,606.847
|
$16,253,870.500
|