0326-01-056 |
NUECES |
CORPUS CHRISTI |
$74,013,183 |
SH 286 |
STP 2B24(256)MM |
10/01/2024 |
08/20/2024 |
CONVERT NON-FREEWAY |
J E CONSTRUCTION SERVICES, LLC($78,963,044) |
|
0916-28-083 |
SAN PATRICIO |
CORPUS CHRISTI |
$906,124 |
RI |
BR 2024(947) |
08/02/2024 |
06/21/2024 |
BRIDGE REPL |
LUCANIA CONTRACTORS LLC($977,757) |
|
0916-28-082 |
SAN PATRICIO |
CORPUS CHRISTI |
$725,623 |
CO |
BR 2B24(048) |
08/01/2024 |
06/20/2024 |
BRIDGE REPL |
CK NEWBERRY, LLC($867,436) |
|
1087-01-018 |
JIM WELLS |
CORPUS CHRISTI |
$2,986,345 |
FM 738 |
STP 2B24(258)HRR |
06/06/2024 |
04/25/2024 |
WIDEN ROAD - ADD SHOULDERS |
CLARK CONSTRUCTION OF TEXAS, INC.($1,993,022) |
|
6465-40-001 |
SAN PATRICIO |
CORPUS CHRISTI |
$449,000 |
US0181 |
MMC - 646540001 |
04/04/2024 |
03/01/2024 |
HOT MIX |
COLORADO MATERIALS, LTD.($430,000) |
|
0101-04-131 |
SAN PATRICIO |
CORPUS CHRISTI |
$15,565,359 |
US 181 |
F 2024(689) |
01/05/2024 |
11/24/2023 |
RESURF ROADWAY |
ANDERSON COLUMBIA CO., INC.($12,996,391) |
|
0383-03-024 |
JIM WELLS |
CORPUS CHRISTI |
$26,689,441 |
SH 141 |
C 383-3-24 |
01/04/2024 |
11/23/2023 |
WIDEN ROAD - ADD LANES |
ANDERSON COLUMBIA CO., INC.($24,833,825) |
|
0074-04-047 |
SAN PATRICIO |
CORPUS CHRISTI |
$8,640,577 |
IH 37 |
F 2024(046) |
09/07/2023 |
11/15/2023 |
REHAB EXIST ROADWAY |
BRANNAN PAVING CO., LTD.($6,031,422) |
|
6439-52-001 |
NUECES |
CORPUS CHRISTI |
$1,458,993 |
FM1889 |
RMC - 643952001 |
09/06/2023 |
11/15/2023 |
HOT MIX |
ANDERSON COLUMBIA CO., INC.($1,252,186) |
|
0617-01-207 |
NUECES |
CORPUS CHRISTI |
$4,845,211 |
SH 358 |
F 2B23(116) |
06/27/2023 |
11/15/2023 |
RESURF ROADWAY |
ANDERSON COLUMBIA CO., INC.($4,825,099) |
|
0507-01-023 |
SAN PATRICIO |
CORPUS CHRISTI |
$2,740,195 |
SH 234 |
F 2023(607) |
04/05/2023 |
11/15/2023 |
RESURF ROADWAY |
CK NEWBERRY, LLC($3,026,454) |
|
0180-04-120 |
ARANSAS |
CORPUS CHRISTI |
$25,403,884 |
SH 35 |
C 180-4-120 |
03/08/2023 |
08/21/2024 |
INTERCHANGE IMPRV (NEW OR UPDATE) |
ANDERSON COLUMBIA CO., INC.($22,334,444) |
|
0255-01-090 |
JIM WELLS |
CORPUS CHRISTI |
$5,229,054 |
US 281 |
C 255-1-90 |
11/02/2022 |
11/15/2023 |
SURF/ROADWAY RESTOR |
HUNTER INDUSTRIES, LTD.($4,570,095) |
|
0989-02-054 |
NUECES |
CORPUS CHRISTI |
$12,650,407 |
FM 624 |
F 2022(932) |
08/03/2022 |
11/15/2023 |
SURF/ROADWAY RESTOR |
HAAS-ANDERSON CONSTRUCTION, LTD.($10,116,593) |
|
0371-02-074 |
REFUGIO |
CORPUS CHRISTI |
$8,855,103 |
US 77 |
C 371-2-74 |
06/02/2022 |
09/03/2024 |
SURF/ROADWAY RESTOR |
HUNTER INDUSTRIES, LTD.($9,300,600) |
|
0255-01-088 |
JIM WELLS |
CORPUS CHRISTI |
$11,010,962 |
US 281 |
F 2022(659) |
06/01/2022 |
09/03/2024 |
SURF/ROADWAY RESTOR |
ANDERSON COLUMBIA CO., INC.($11,570,098) |
|
0254-03-081 |
JIM WELLS |
CORPUS CHRISTI |
$18,341,705 |
US 281 |
F 2022(654) |
04/06/2022 |
08/22/2024 |
SURF/ROADWAY RESTOR |
ANDERSON COLUMBIA CO., INC.($15,854,122) |
|
6395-94-001 |
NUECES |
CORPUS CHRISTI |
$426,375 |
SH0358 |
RMC - 639594001 |
03/03/2022 |
11/15/2023 |
BRIDGE SUBSTRUCT REPAIR |
LUCANIA CONSTRUCTION LLC($399,266) |
|
6390-97-001 |
SAN PATRICIO |
CORPUS CHRISTI |
$1,058,452 |
US0181 |
RMC - 639097001 |
11/04/2021 |
11/15/2023 |
MILL AND INLAY |
TEXAS MATERIALS GROUP, INC.($1,139,243) |
|
6383-53-001 |
SAN PATRICIO |
CORPUS CHRISTI |
$1,731,086 |
IH0037 |
RMC - 638353001 |
08/05/2021 |
11/15/2023 |
REHAB OF EXIST ROADWAY |
J. CARROLL WEAVER, INC.($1,301,899) |
|
0617-01-205 |
NUECES |
CORPUS CHRISTI |
$2,939,378 |
SH 358 |
F 2021(878) |
08/05/2021 |
11/15/2023 |
CONSTRUCT PEDESTRIAN INFRASTRUCT |
TI-ZACK CONCRETE, INC.($2,547,785) |
|
0086-20-023 |
NUECES |
CORPUS CHRISTI |
$4,641,197 |
FM 665 |
STP 2021(877)HES |
08/04/2021 |
11/15/2023 |
HAZARD ELIM & SAFETY |
CK NEWBERRY, LLC($4,508,718) |
|
1207-05-008 |
LIVE OAK |
CORPUS CHRISTI |
$2,813,380 |
FM 3162 |
F 2021(754) |
07/02/2021 |
11/15/2023 |
WIDEN ROAD - ADD SHOULDERS |
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.($2,348,364) |
|
0691-01-040 |
KARNES |
CORPUS CHRISTI |
$7,903,696 |
FM 81 |
F 2021(753) |
07/01/2021 |
11/15/2023 |
ROADWAY REHAB/RECON WITH NO ADDE |
CK NEWBERRY, LLC($7,699,689) |
|
1557-01-043 |
NUECES |
CORPUS CHRISTI |
$4,386,361 |
FM 43 |
C 1557-1-43 |
06/03/2021 |
11/15/2023 |
SURF/ROADWAY RESTOR |
HAAS-ANDERSON CONSTRUCTION, LTD.($5,154,966) |
|
6381-05-001 |
SAN PATRICIO |
CORPUS CHRISTI |
$1,057,136 |
FM0893 |
RMC - 638105001 |
06/03/2021 |
11/15/2023 |
MILL AND INLAY |
HUNTER INDUSTRIES, LTD.($899,918) |
|
0916-38-014 |
ARANSAS |
CORPUS CHRISTI |
$3,982,909 |
CS |
BR 1902(249) |
03/04/2021 |
11/15/2023 |
REPLACE BRIDGE AND APPROACHES |
LUCANIA CONSTRUCTION LLC($4,582,972) |
|
0180-02-041 |
REFUGIO |
CORPUS CHRISTI |
$5,718,658 |
SH 35 |
C 180-2-41 |
02/05/2021 |
11/15/2023 |
WIDEN ROAD - ADD LANES |
HUNTER INDUSTRIES, LTD.($4,992,798) |
|
0830-03-013 |
EDWARDS |
SAN ANGELO |
$1,129,369 |
RM 335 |
C 830-3-13 |
01/08/2021 |
11/15/2023 |
REPAIR ROADWAY |
INTEGRITY SERVICES, LLC($999,998) |
|
0102-03-087 |
NUECES |
CORPUS CHRISTI |
$7,927,833 |
US 77 |
C 102-3-87 |
12/02/2020 |
11/15/2023 |
CONSTRUCTION EXIT & ENTRANCE RAMPS |
HAAS-ANDERSON CONSTRUCTION, LTD.($7,712,829) |
|
0916-00-233 |
NUECES |
CORPUS CHRISTI |
$8,031,191 |
VA |
STP 2021(028)HES |
10/01/2020 |
11/15/2023 |
THIS PROJECT IS FOR THE DISTRICT WIDE FY 2020 HSIP |
TIERRA LEASE SERVICE, LLC($8,086,090) |
|
6364-41-001 |
NUECES |
CORPUS CHRISTI |
$1,496,934 |
IH0037 |
RMC - 636441001 |
09/04/2020 |
11/15/2023 |
MILLING, SEAL, OVERLAY, AND PAVMT REPAIR |
HAAS-ANDERSON CONSTRUCTION, LTD.($2,011,828) |
|
0326-05-003 |
NUECES |
CORPUS CHRISTI |
$2,945,952 |
BS 286A |
C 326-5-3 |
05/07/2020 |
11/15/2023 |
OVERLAY WITH SPOT BASE REPAIR AND SIGNS |
HAAS-ANDERSON CONSTRUCTION, LTD.($2,555,406) |
|
0073-07-062 |
LIVE OAK |
CORPUS CHRISTI |
$11,823,254 |
IH 37 |
STP 2020(672)HES |
03/04/2020 |
11/15/2023 |
IMPROVE GUARDRAIL TO DESIGN STANDARDS |
ALTUS CONSTRUCTION LLC($10,250,266) |
|
6350-58-001 |
NUECES |
CORPUS CHRISTI |
$2,654,190 |
SH0361 |
RMC - 635058001 |
01/09/2020 |
11/15/2023 |
MILL & INLAY |
HAAS-ANDERSON CONSTRUCTION, LTD.($2,995,402) |
|
0371-05-020 |
SAN PATRICIO |
CORPUS CHRISTI |
$791,013 |
FM 2046 |
STP 2020(447)HES |
01/09/2020 |
09/26/2024 |
SAFETY TREAT FIXED OBJECTS |
VECTOR UTILITIES LLC($871,810) |
|
1087-01-014 |
JIM WELLS |
CORPUS CHRISTI |
$1,022,958 |
FM 738 |
STP 2020(040)HES |
09/06/2019 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
J. CARROLL WEAVER, INC.($1,150,495) |
|
0371-03-123 |
REFUGIO |
CORPUS CHRISTI |
$3,155,745 |
US 77 |
NH 1902(108) |
07/10/2019 |
09/27/2024 |
MILL AND OVERLAY ROADWAY |
HUNTER INDUSTRIES, LTD.($3,620,226) |
|
1088-04-025 |
NUECES |
CORPUS CHRISTI |
$3,670,136 |
FM 892 |
STP 1902(110) |
07/10/2019 |
09/27/2024 |
REHAB AND WIDEN ROADWAY |
J. CARROLL WEAVER, INC.($3,732,484) |
|
0155-04-055 |
GOLIAD |
CORPUS CHRISTI |
$29,312,416 |
US 183 |
STP 1902(107) |
07/09/2019 |
09/27/2024 |
REHAB ROADWAY AND ADD PASSING LANES |
HUNTER INDUSTRIES, LTD.($31,126,365) |
|
0255-01-084 |
JIM WELLS |
CORPUS CHRISTI |
$5,227,164 |
US 281 |
C 255-1-84 |
07/09/2019 |
09/27/2024 |
OVERLAY ROADWAY |
HUNTER INDUSTRIES, LTD.($5,930,379) |
|
0180-10-083 |
SAN PATRICIO |
CORPUS CHRISTI |
$3,466,771 |
SH 361 |
C 180-10-83 |
05/08/2019 |
11/15/2023 |
MILL AND INLAY |
HAAS-ANDERSON CONSTRUCTION, LTD.($3,356,713) |
|
0102-04-105 |
KLEBERG |
CORPUS CHRISTI |
$4,374,607 |
US 77 |
NH 2019(962) |
05/08/2019 |
11/15/2023 |
OVERLAY ROADWAY |
HAAS-ANDERSON CONSTRUCTION, LTD.($4,658,417) |
|
1558-01-019 |
NUECES |
CORPUS CHRISTI |
$4,218,585 |
FM 70 |
C 1558-1-19 |
05/07/2019 |
11/15/2023 |
RESTOR OF EXIST ROADWAY |
TIERRA LEASE SERVICE, LLC($4,592,255) |
|
2886-02-017 |
NUECES |
CORPUS CHRISTI |
$4,457,303 |
FM 2826 |
C 2886-2-17 |
04/02/2019 |
11/15/2023 |
REHAB ROADWAY AND WIDEN |
J. CARROLL WEAVER, INC.($4,689,384) |
|
0074-01-055 |
LIVE OAK |
CORPUS CHRISTI |
$1,927,013 |
IH 37 |
C 74-1-55 |
03/06/2019 |
11/15/2023 |
REHAB AND WIDEN-WEST FRTG LANES ONLY |
HUNTER INDUSTRIES, LTD.($1,839,972) |
|
0180-02-040 |
REFUGIO |
CORPUS CHRISTI |
$12,352,440 |
SH 35 |
STP 2019(579)HES |
02/06/2019 |
11/15/2023 |
SAFETY TRT FIXED OBJECTS, INSTL PASSING LANES |
HUNTER INDUSTRIES, LTD.($12,619,232) |
|
0691-01-042 |
KARNES |
CORPUS CHRISTI |
$9,269,755 |
FM 81 |
STP 2019(463) |
01/08/2019 |
11/15/2023 |
REHAB AND WIDEN ROADWAY |
RAY FARIS, INC.($7,894,058) |
|
0102-10-030 |
KLEBERG |
CORPUS CHRISTI |
$1,746,057 |
FM 1898 |
STP 2019(060) |
09/06/2018 |
11/15/2023 |
MILL AND INLAY |
TEXAS SAI, INC.($2,030,652) |
|
0254-07-007 |
JIM WELLS |
CORPUS CHRISTI |
$5,164,480 |
US 281 |
NH 2019(061) |
09/06/2018 |
11/15/2023 |
SPOT BASE REPAIR AND OVERLAY |
TEXAS SAI, INC.($5,154,033) |
|
0101-03-088 |
SAN PATRICIO |
CORPUS CHRISTI |
$13,898,551 |
US 181 |
STP 1802(556)HES |
08/08/2018 |
11/15/2023 |
CONSTRUCT GRADE SEPARATION |
HAAS-ANDERSON CONSTRUCTION, LTD.($15,437,893) |
|
0254-03-079 |
JIM WELLS |
CORPUS CHRISTI |
$9,522,058 |
US 281 |
C 254-3-79 |
06/05/2018 |
11/15/2023 |
BASE REPAIR AND OVERLAY (SB LANES) |
ANDERSON COLUMBIA CO., INC.($9,980,995) |
|
6330-57-001 |
NUECES |
CORPUS CHRISTI |
$1,169,164 |
FM2444 |
RMC - 633057001 |
05/02/2018 |
11/15/2023 |
PAVMT REPAIR AND PLANING |
CLARK CONSTRUCTION OF TEXAS, INC.($1,227,884) |
|
0102-01-088 |
NUECES |
CORPUS CHRISTI |
$33,992,727 |
SH 44 |
NH 2018(842) |
05/02/2018 |
11/15/2023 |
GR, BS, SURF, STRUCTS |
HAAS-ANDERSON CONSTRUCTION, LTD.($37,950,858) |
|
6329-86-001 |
NUECES |
CORPUS CHRISTI |
$1,712,307 |
FM0665 |
RMC - 632986001 |
04/04/2018 |
11/15/2023 |
PAVMT REPAIRS,MILL,SEAL,INLY&PVMT MRK |
HAAS-ANDERSON CONSTRUCTION, LTD.($1,376,442) |
|
6329-85-001 |
NUECES |
CORPUS CHRISTI |
$1,215,665 |
FM0624 |
RMC - 632985001 |
04/03/2018 |
11/15/2023 |
MILL & OVERLAY |
HAAS-ANDERSON CONSTRUCTION, LTD.($893,078) |
|
0074-05-097 |
SAN PATRICIO |
CORPUS CHRISTI |
$6,293,987 |
IH 37 |
NH 2018(176) |
10/03/2017 |
11/15/2023 |
MILL,SEAL AND OVERLAY SB LANES ONLY |
ANGEL BROTHERS HOLDINGS CORP.($6,225,552) |
|
1959-01-014 |
LIVE OAK |
CORPUS CHRISTI |
$6,645,915 |
FM 2049 |
STP 1702(645) |
08/09/2017 |
11/15/2023 |
REHAB AND WIDEN |
HUNTER INDUSTRIES, LTD.($6,025,846) |
|
1069-01-037 |
NUECES |
CORPUS CHRISTI |
$6,539,842 |
SH 357 |
NH 2017(964) |
04/05/2017 |
11/15/2023 |
NOVACHIP ROADWAY |
CLARK CONSTRUCTION OF TEXAS, INC.($6,082,985) |
|
0180-10-077 |
SAN PATRICIO |
CORPUS CHRISTI |
$3,786,956 |
SH 361 |
STP 2017(963) |
04/04/2017 |
11/15/2023 |
OVERLAY BOTH DIRECTIONS |
HAAS-ANDERSON CONSTRUCTION, LTD.($3,335,329) |
|
1052-01-076 |
NUECES |
CORPUS CHRISTI |
$9,300,117 |
FM 666 |
STP 2017(819) |
03/08/2017 |
11/15/2023 |
WIDEN AND SEAL ROADWAY |
J. CARROLL WEAVER, INC.($8,117,216) |
|
0254-07-009 |
JIM WELLS |
CORPUS CHRISTI |
$7,233,639 |
US 281 |
NH 2017(816) |
03/08/2017 |
11/15/2023 |
SPOT BASE REPAIR AND OVERLAY |
ANDERSON COLUMBIA CO., INC.($6,433,806) |
|
0372-01-098 |
SAN PATRICIO |
CORPUS CHRISTI |
$3,239,908 |
US 77 |
NH 2017(817) |
03/08/2017 |
11/15/2023 |
BASE REPAIR, MILL, SEAL AND OVERLAY ON US 77 |
HAAS-ANDERSON CONSTRUCTION, LTD.($3,022,421) |
|
6314-04-001 |
SAN PATRICIO |
CORPUS CHRISTI |
$3,212,370 |
SH0359 |
RMC - 631404001 |
03/07/2017 |
11/15/2023 |
MILL & OVERLAY |
HUNTER INDUSTRIES, LTD.($2,243,158) |
|
6309-99-001 |
LIVE OAK |
CORPUS CHRISTI |
$747,196 |
US0281 |
RMC - 630999001 |
02/02/2017 |
11/15/2023 |
MILL & FILL |
HUNTER INDUSTRIES, LTD.($557,830) |
|
0989-01-037 |
JIM WELLS |
CORPUS CHRISTI |
$5,046,325 |
FM 624 |
STP 1602(264)HES |
11/03/2016 |
11/15/2023 |
PROVIDE ADDITIONAL PAVED SURF WIDTH |
BRANNAN PAVING CO., LTD.($4,558,634) |