Job Info for 0916-28-082

County: SAN PATRICIO Highway: CO Date: 08/01/2024 (3 months ago) Engineer's Estimate: $725,623 Control Number: 0916-28-082
Project: BR 2B24(048) District: CORPUS CHRISTI Time: 106 WORKING DAYS Type: BRIDGE REPLACEMENT
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $725,622.70
CK NEWBERRY, LLC   $867,435.50 1
19.54% | $141,812.80
STX CIVIL   $878,652.50 2
21.09% | $153,029.80
1.29% | $11,217.00
J. CARROLL WEAVER, INC.   $898,091.63 3
23.77% | $172,468.93
3.53% | $30,656.13
2.21% | $19,439.13
TEXAS STEEL INDUSTRIAL PLACING, CONCRETE DIVISION LLC   $909,180.00 4
25.3% | $183,557.30
4.81% | $41,744.50
1.23% | $11,088.37
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC   $983,828.67 5
35.58% | $258,205.97
13.42% | $116,393.17
8.21% | $74,648.67
C. E. BARKER, LTD.   $998,446.25 6
37.6% | $272,823.55
15.1% | $131,010.75
1.49% | $14,617.58
BAY LTD.   $999,999.90 7
37.81% | $274,377.20
15.28% | $132,564.40
0.16% | $1,553.65
J E CONSTRUCTION SERVICES, LLC   $1,037,144.00 8
42.93% | $311,521.30
19.56% | $169,708.50
3.71% | $37,144.10
Subcontractor Percentage Amount
GREGORY PILE DRIVING, INC. 7.40% $64,190.23
SOIL TECH ADVANCE INC. 0.97% $8,414.12
HIGHWAY BARRICADES AND SERVICES, LLC 0.82% $7,112.97
HOUSTON SAWING & DRILLING 0.70% $6,072.05
Total: 9.89% $85,789.37

Bid Items

Items: 51, 0 filtered
SAN PATRICIO CO  |  CORPUS CHRISTI  |  0916-28-082  |  08/01/2024  |  $725,623  |  BR 2B24(048)  |  BRIDGE REPL  |  106 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate CK NEWBERRY, LLC STX CIVIL J. CARROLL WEAVER, INC. TEXAS STEEL INDUSTRIAL PLACING, CONCRETE DIVISION LLC A GREATER AUSTIN DEVELOPMENT COMPANY, LLC C. E. BARKER, LTD. BAY LTD. J E CONSTRUCTION SERVICES, LLC
100 6002 PREPARING ROW STA 8.000 $2,500.000 $1,000.000 $6,000.000 $1,989.810 $4,500.000 $4,700.000 $12,000.000 $5,800.000 $4,800.000
106 6002 OBLITERATING ABANDONED ROAD SY 127.000 $8.000 $10.000 $10.000 $47.880 $50.000 $78.750 $43.180 $17.500 $85.000
110 6001 EXCAVATION (ROADWAY) CY 512.000 $15.000 $35.000 $100.000 $20.490 $35.000 $42.000 $36.810 $61.000 $42.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 78.000 $30.000 $50.000 $75.000 $50.080 $40.000 $131.250 $40.910 $120.000 $45.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 2,914.000 $4.000 $5.000 $5.000 $2.480 $4.000 $5.250 $4.550 $6.000 $8.000
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 2,914.000 $2.000 $1.000 $2.000 $2.220 $1.500 $1.000 $1.230 $1.650 $2.000
168 6001 VEGETATIVE WATERING MG 53.100 $90.000 $20.000 $50.000 $25.530 $35.000 $200.000 $197.710 $75.000 $80.000
247 6466 FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS CY 493.000 $100.000 $150.000 $150.000 $138.790 $133.000 $157.500 $118.620 $180.000 $198.000
251 6013 REWORK BS MTL (TY C) (6") (ORD COMP) STA 9.000 $4,000.000 $500.000 $50.000 $920.290 $4,000.000 $1,050.000 $477.230 $1,600.000 $830.000
310 6009 PRIME COAT (MC-30) GAL 296.000 $12.000 $10.000 $20.000 $8.230 $8.000 $15.850 $13.640 $11.000 $13.000
316 6001 ASPH (MULTI OPTION) GAL 518.000 $7.000 $7.000 $15.000 $4.750 $8.000 $11.000 $10.910 $5.400 $8.000
316 6413 ASPH(AC-15P, HFRS-2P OR CRS-2P) GAL 518.000 $7.000 $7.000 $15.000 $4.750 $8.000 $12.800 $6.820 $6.300 $9.000
316 6427 AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B) CY 12.000 $165.000 $700.000 $1,600.000 $670.600 $650.000 $1,050.000 $545.400 $400.000 $660.000
316 6430 AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B) CY 14.000 $170.000 $700.000 $1,600.000 $696.130 $650.000 $920.000 $545.400 $360.000 $610.000
400 6005 CEM STABIL BKFL CY 66.900 $170.000 $250.000 $200.000 $189.970 $250.000 $363.000 $238.610 $140.000 $186.000
416 6002 DRILL SHAFT (24 IN) LF 234.000 $280.000 $400.000 $300.000 $336.330 $430.000 $284.000 $409.960 $480.000 $240.000
420 6013 CL C CONC (ABUT) CY 20.400 $2,000.000 $2,000.000 $1,500.000 $1,776.000 $1,750.000 $1,950.000 $2,856.530 $2,200.000 $2,620.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 910.000 $28.000 $60.000 $55.000 $37.740 $30.000 $51.000 $38.180 $45.000 $53.000
425 6010 PRESTR CONC SLAB BEAM (5SB12) LF 172.500 $240.000 $300.000 $300.000 $428.120 $275.000 $362.850 $376.250 $380.000 $510.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 8.000 $600.000 $1,500.000 $800.000 $777.000 $750.000 $966.000 $2,183.870 $1,700.000 $2,200.000
432 6033 RIPRAP (STONE PROTECTION)(18 IN) CY 100.000 $350.000 $250.000 $250.000 $262.070 $250.000 $300.000 $291.790 $290.000 $276.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 6.000 $575.000 $1,000.000 $800.000 $677.100 $750.000 $1,820.000 $789.590 $1,500.000 $1,408.000
450 6006 RAIL (TY T223) LF 94.000 $155.000 $250.000 $180.000 $373.920 $150.000 $268.850 $208.620 $630.000 $408.000
462 6010 CONC BOX CULV (6 FT X 3 FT) LF 18.900 $600.000 $925.000 $850.000 $1,242.330 $1,150.000 $1,360.000 $807.060 $1,100.000 $1,210.000
462 6099 CONC BOX CULV (6 FT X 2 FT) LF 33.600 $600.000 $725.000 $750.000 $1,292.950 $1,150.000 $1,190.000 $740.310 $860.000 $1,180.000
464 6005 RC PIPE (CL III)(24 IN) LF 120.300 $150.000 $100.000 $115.000 $112.740 $140.000 $174.000 $96.010 $140.000 $162.000
467 6204 SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C) EA 2.000 $12,000.000 $12,000.000 $13,000.000 $11,100.000 $13,000.000 $8,400.000 $8,835.480 $9,700.000 $12,900.000
467 6211 SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C) EA 2.000 $12,000.000 $12,000.000 $15,000.000 $11,211.000 $15,000.000 $9,000.000 $11,357.960 $12,500.000 $13,220.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 6.000 $2,500.000 $3,000.000 $3,000.000 $3,352.200 $3,500.000 $5,300.000 $2,229.330 $8,400.000 $4,985.000
496 6007 REMOV STR (PIPE) LF 232.000 $28.000 $25.000 $30.000 $22.870 $30.000 $25.000 $31.820 $17.500 $80.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $30,000.000 $50,000.000 $30,000.000 $42,508.220 $35,000.000 $40,000.000 $25,906.500 $20,100.000 $22,180.000
500 6001 MOBILIZATION LS 1.000 $67,965.700 $85,000.000 $80,000.000 $145,000.000 $90,000.000 $98,300.000 $100,000.000 $36,700.000 $86,220.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $4,000.000 $5,000.000 $2,500.000 $3,330.000 $3,000.000 $4,600.000 $5,781.240 $1,900.000 $3,940.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 45.000 $50.000 $70.000 $85.000 $111.000 $90.000 $77.000 $95.450 $130.000 $95.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 45.000 $24.000 $40.000 $50.000 $83.250 $30.000 $44.000 $54.540 $73.000 $55.000
506 6021 CONSTRUCTION EXITS (INSTALL) (TY 2) SY 78.000 $40.000 $20.000 $70.000 $27.750 $60.000 $25.000 $68.180 $120.000 $55.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 78.000 $15.000 $10.000 $15.000 $11.100 $30.000 $11.000 $20.450 $27.000 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 30.000 $5.000 $15.000 $5.000 $24.830 $6.000 $22.000 $27.270 $37.000 $28.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 30.000 $2.000 $10.000 $1.000 $11.100 $2.000 $11.000 $13.640 $18.250 $15.000
530 6003 INTERSECTIONS (SURF TREAT) SY 94.000 $40.000 $125.000 $50.000 $35.040 $75.000 $55.000 $68.180 $97.000 $122.000
530 6006 DRIVEWAYS (SURF TREAT) SY 34.000 $35.000 $175.000 $50.000 $96.890 $75.000 $83.000 $68.180 $130.000 $138.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 25.000 $36.000 $40.000 $45.000 $43.290 $35.000 $38.500 $51.950 $56.000 $59.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1.000 $2,500.000 $4,000.000 $3,700.000 $3,885.000 $3,000.000 $3,740.000 $4,669.990 $5,100.000 $4,920.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 1.000 $3,450.000 $5,000.000 $3,300.000 $4,773.000 $3,600.000 $2,920.000 $5,828.960 $6,300.000 $4,490.000
545 6012 CRASH CUSH ATTEN (INSTL)(R)(N)(TL2) EA 1.000 $11,000.000 $30,000.000 $9,000.000 $8,500.000 $25,000.000 $35,000.000 $35,723.000 $45,593.700 $32,110.000
644 6076 REMOVE SM RD SN SUP&AM EA 1.000 $170.000 $1,000.000 $180.000 $84.360 $150.000 $150.000 $163.620 $370.000 $360.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 4.000 $35.000 $200.000 $50.000 $166.500 $25.000 $44.000 $54.540 $370.000 $66.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 3.000 $70.000 $200.000 $50.000 $222.000 $30.000 $44.000 $47.720 $370.000 $66.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 6.000 $110.000 $200.000 $120.000 $277.500 $125.000 $113.000 $47.720 $740.000 $170.000
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $14,000.000 $8,000.000 $8,000.000 $8,880.000 $17,000.000 $10,000.000 $9,544.500 $1,500.000 $19,150.000
6185 6002 TMA (STATIONARY) DAY 85.000 $290.000 $70.000 $300.000 $205.350 $287.000 $260.000 $545.400 $450.000 $160.000
Totals: $725,622.70 $867,435.50 $878,652.50 $898,091.64 $909,180.00 $983,828.68 $998,446.28 $999,999.90 $1,037,144.00