KLEBERG US 77 (0102-04-105)

Items: 60

County: KLEBERG
Length: N/A
Highway: US 77
District: CORPUS CHRISTI
Control Number: 0102-04-105
DBE Goal: N/A
Project: NH 2019(962)
Guaranty: N/A
Time: 136 WORKING DAYS
Engineer's Estimate: $4,374,606.85
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: OVERLAY ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,374,606.85
$4,658,417.25
Over/Under Est: 6.49% $283,810.40
$5,447,062.75
Over/Under Est: 24.52% $1,072,455.90
Amt Left: 16.93% $788,645.50
$5,504,483.24
Over/Under Est: 25.83% $1,129,876.39
Amt Left: 18.16% $846,065.99
Delta: -1.05% -$57,420.49

Bid Items & Bid Tabulations

60 Total 0 of 60
KLEBERG  |  US 77  |  CORPUS CHRISTI  |  0102-04-105  |  05/08/2019  |  $4,374,606.85  |  NH 2019(962)  |  OVERLAY ROADWAY  |  136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HAAS-ANDERSON CONSTRUCTION, LTD.
BAY LTD.
FOREMOST PAVING, INC.
BACKFILL (TY A OR B)
STA 527.000 $150.000 $238.000 $195.000 $270.000
ASPH (MULTI OPTION)
GAL 90,072.000 $3.000 $2.800 $3.000 $5.500
AGGR (MULTI OPTION)
CY 2,107.000 $100.000 $128.000 $130.000 $80.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 25,403.000 $110.000 $120.650 $133.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 2,667.000 $25.000 $29.800 $53.000 $46.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 2,162.000 $1.000 $2.550 $10.000 $5.500
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 2,627.000 $3.000 $3.850 $9.000 $4.500
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 6,144.000 $3.000 $5.050 $7.500 $2.500
RIPRAP (MOW STRIP)(4 IN)
CY 106.000 $450.000 $449.000 $510.000 $412.000
CLEANING AND SEALING EXISTING JOINTS
LF 304.000 $25.000 $51.000 $47.000 $50.000
RETROFIT RAIL (TY SSTR)
LF 580.000 $200.500 $280.000 $380.000 $350.000
CLEAN EXIST CULVERTS
EA 18.000 $1,500.000 $2,650.000 $2,500.000 $2,750.000
MOBILIZATION
LS 1.000 $300,000.000 $133,000.000 $99,500.000 $485,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $4,500.000 $1,550.000 $17,500.000 $4,400.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,380.000 $3.000 $2.450 $2.900 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,380.000 $1.000 $1.150 $1.500 $1.100
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 720.000 $30.000 $32.000 $14.000 $42.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,160.000 $5.000 $11.000 $13.750 $23.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 720.000 $10.000 $14.000 $13.000 $25.000
DRIVEWAYS (ACP)
SY 1,012.000 $40.000 $40.000 $82.000 $82.000
RUMBLE STRIPS (SHOULDER)
LF 104,996.000 $0.150 $0.200 $0.350 $0.400
MTL W-BEAM GD FEN (TIM POST)
LF 1,125.000 $22.000 $22.000 $25.000 $21.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,000.000 $1,590.000 $2,100.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,467.000 $4.000 $2.100 $2.500 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $140.000 $212.000 $250.000 $225.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $250.000 $212.000 $220.000 $225.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,700.000 $2,590.000 $3,300.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $400.000 $265.000 $360.000 $260.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $10,000.000 $9,000.000 $11,300.000 $8,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,100.000 $1,590.000 $1,900.000 $1,600.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $700.000 $794.000 $1,100.000 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 25.000 $475.500 $582.000 $590.000 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 17.000 $575.500 $609.000 $840.000 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $675.500 $635.000 $1,000.000 $600.000
REMOVE SM RD SN SUP&AM
EA 40.000 $50.000 $58.000 $75.000 $60.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 8.000 $20.000 $5.300 $19.000 $5.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 26.000 $25.000 $11.000 $15.000 $10.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 8.000 $20.000 $5.300 $19.000 $10.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 1.000 $45.000 $64.000 $75.000 $60.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 35.000 $75.000 $95.000 $75.000 $90.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $30.000 $16.000 $22.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 12.000 $25.000 $16.000 $22.000 $20.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 16,200.000 $0.250 $0.200 $0.250 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 3,000.000 $0.250 $0.200 $0.250 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,823.000 $0.600 $0.350 $0.450 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 3,000.000 $0.250 $0.200 $0.250 $0.500
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 805.000 $4.000 $3.200 $3.700 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 2,266.000 $1.000 $1.100 $2.000 $1.300
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,823.000 $0.600 $0.850 $1.000 $1.000
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 13,200.000 $0.250 $0.350 $0.450 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 52,338.000 $0.200 $0.350 $0.400 $0.320
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 51,299.000 $0.250 $0.350 $0.400 $0.320
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 190.000 $22.000 $17.000 $20.000 $20.000
REFL PAV MRKR TY II-C-R
EA 950.000 $3.000 $3.200 $3.700 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 9,000.000 $1.000 $1.550 $1.250 $1.350
FULL - WIDTH MOWING
CYC 2.000 $4,000.000 $9,170.000 $12,600.000 $10,500.000
TREE TRIMMING / BRUSH REMOVAL
MI 5.000 $10,000.000 $7,140.000 $17,800.000 $11,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 272.000 $100.000 $65.000 $79.000 $51.000
TMA (STATIONARY)
DAY 105.000 $100.000 $10.000 $580.000 $55.000
TMA (MOBILE OPERATION)
HR 30.000 $50.000 $10.000 $56.000 $165.000
Totals: $4,374,606.850 $4,658,417.250 $5,447,062.750 $5,504,483.240