Show Job Controls
Bid Cobra

JIM WELLS US 281 (0254-07-009)

Items: 72

County: JIM WELLS
Length: N/A
Highway: US 281
District: CORPUS CHRISTI
Control Number: 0254-07-009
DBE Goal: N/A
Project: NH 2017(816)
Guaranty: N/A
Time: 160 WORKING DAYS
Engineer's Estimate: $7,233,639.05
Date: 03/08/2017 (9 years ago)
Contract Number: N/A
Type: SPOT BASE REPAIR AND OVERLAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$7,233,639.05
$6,433,805.70
Over/Under Est: -11.06% -$799,833.35
$6,466,666.66
Over/Under Est: -10.6% -$766,972.39
Amt Left: 0.51% $32,860.96
$7,061,150.09
Over/Under Est: -2.38% -$172,488.96
Amt Left: 9.75% $627,344.39
Delta: -9.19% -$594,483.43
Over/Under Est: 0.87% $62,750.71
Amt Left: 13.41% $862,584.06
Delta: -3.33% -$235,239.67
$9,167,593.60
Over/Under Est: 26.74% $1,933,954.55
Amt Left: 42.49% $2,733,787.90
Delta: -25.65% -$1,871,203.84

Bid Items & Bid Tabulations

72 Total 0 of 72
JIM WELLS  |  US 281  |  CORPUS CHRISTI  |  0254-07-009  |  03/08/2017  |  $7,233,639.05  |  NH 2017(816)  |  SPOT BASE REPAIR AND OVERLAY  |  160 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
TEXAS SAI, INC.
BAY LTD.
HUNTER INDUSTRIES, LTD.
FOREMOST PAVING, INC.
REMOVING CONC (FLUME)
SY 97.000 $11.000 $21.000 $19.950 $16.500 $22.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 60.000 $14.000 $42.000 $42.290 $41.000 $48.180 $100.000
BACKFILL (TY A OR B)
STA 722.000 $143.000 $120.000 $57.690 $100.000 $184.800 $180.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 180,607.000 $2.500 $3.000 $2.250 $2.200 $2.510 $3.400
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 4,213.000 $82.000 $93.000 $92.500 $90.000 $75.090 $64.000
D-GR HMA TY B SAC-B PG (64-22)
TON 29,992.000 $62.000 $56.000 $59.500 $66.000 $66.530 $77.000
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 36,460.000 $78.000 $72.000 $67.500 $75.000 $70.860 $91.000
PLANE ASPH CONC PAV(0" TO 2")
SY 5,061.000 $4.000 $4.000 $1.500 $1.500 $1.910 $2.500
PLANE ASPH CONC PAV (1")
SY 1,685.000 $1.250 $2.500 $6.910 $3.200 $1.910 $4.500
PLANE ASPH CONC PAV (2")
SY 303,634.000 $1.000 $0.400 $0.760 $1.100 $1.790 $1.950
PLANE ASPH CONC PAV (4")
SY 131,654.000 $2.500 $0.600 $1.440 $1.800 $1.790 $4.200
PLANE ASPH CONC PAV (2 1/2")
SY 7,470.000 $1.650 $2.500 $1.920 $1.800 $1.910 $2.500
RIPRAP (CONC)(FLUME)
CY 14.000 $430.000 $777.000 $359.330 $910.000 $480.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 74.000 $470.000 $434.000 $216.480 $540.000 $475.000 $500.000
CLEANING EXISTING JOINTS
LF 152.000 $6.000 $34.000 $31.740 $22.000 $33.340 $35.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 60.000 $32.000 $250.000 $200.000 $130.000 $100.000 $430.000
RETROFIT RAIL (TY SSTR)
LF 60.000 $130.000 $700.000 $200.000 $480.000 $300.000 $1,320.000
SET (PIPE RUNNER ASSEMBLY)
EA 2.000 $3,000.000 $5,000.000 $1,888.380 $4,700.000 $4,000.000 $2,000.000
SET (REPLACE PIPE RUNNER ASSEMBLY)
EA 3.000 $4,540.000 $3,500.000 $1,888.380 $5,700.000 $4,000.000 $2,000.000
CLEAN EXIST CULVERTS
EA 2.000 $1,130.000 $3,000.000 $1,917.440 $2,800.000 $2,800.000 $3,000.000
MOBILIZATION
LS 1.000 $472,500.000 $347,000.000 $436,972.930 $300,000.000 $549,661.050 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $3,500.000 $5,000.000 $10,158.880 $13,100.000 $3,489.120 $4,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 2,160.000 $5.000 $6.000 $5.050 $5.800 $4.950 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,160.000 $1.000 $0.500 $1.100 $0.550 $1.000 $1.000
DRIVEWAYS (ACP)
SY 328.000 $30.000 $14.000 $41.000 $14.500 $9.990 $50.000
RUMBLE STRIPS (SHOULDER)
LF 112,414.000 $0.150 $0.200 $0.140 $0.170 $0.160 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 925.000 $20.000 $20.000 $19.500 $23.000 $19.160 $20.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,450.000 $1,300.000 $1,385.000 $1,500.000 $1,767.000 $1,300.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $800.000 $850.000 $850.000 $990.000 $832.000 $850.000
REMOVE METAL BEAM GUARD FENCE
LF 950.000 $2.000 $1.000 $1.500 $1.200 $0.850 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $1,975.000 $2,200.000 $2,155.000 $2,500.000 $2,083.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $140.000 $36.000 $270.000 $59.000 $35.000 $40.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 37.000 $220.000 $175.000 $175.000 $200.000 $175.000 $200.000
ALUMINUM SIGNS (TY O)
SF 28.000 $18.000 $28.000 $28.000 $30.000 $28.000 $40.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 804.500 $23.000 $22.000 $22.000 $23.000 $22.000 $30.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 39.000 $500.000 $400.000 $395.000 $440.000 $395.000 $400.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 28.000 $550.000 $525.000 $525.000 $590.000 $525.000 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 70.000 $585.000 $410.000 $410.000 $460.000 $410.000 $450.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 6.000 $720.000 $550.000 $550.000 $620.000 $550.000 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 5.000 $1,250.000 $775.000 $775.000 $870.000 $775.000 $800.000
REMOVE SM RD SN SUP&AM
EA 136.000 $65.000 $55.000 $55.000 $62.000 $55.000 $60.000
REMOVE LRSA
EA 1.000 $375.000 $1,000.000 $950.000 $1,000.000 $950.000 $500.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 2.000 $340.000 $125.000 $125.000 $130.000 $125.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 63.000 $55.000 $55.000 $55.000 $62.000 $55.000 $55.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 34.000 $22.000 $14.000 $12.500 $14.000 $12.500 $13.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 34.000 $25.000 $14.000 $12.750 $14.250 $12.750 $14.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 32.000 $19.000 $15.000 $15.000 $16.750 $15.000 $20.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 16.000 $67.000 $55.000 $55.000 $62.000 $55.000 $60.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 90.000 $71.000 $55.000 $55.000 $62.000 $55.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 18.000 $25.000 $30.000 $30.000 $34.000 $30.000 $35.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 12.000 $25.000 $30.000 $30.000 $34.000 $30.000 $35.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 29,455.000 $0.340 $0.200 $0.200 $0.230 $0.200 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 12,244.000 $1.160 $0.400 $0.440 $0.420 $0.400 $0.400
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 246.000 $12.500 $3.000 $2.770 $2.900 $2.770 $3.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 37.000 $29.000 $22.000 $22.000 $23.000 $22.000 $22.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 3,164.000 $0.300 $0.300 $0.300 $0.320 $0.300 $0.300
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 3,100.000 $5.000 $0.550 $0.550 $0.600 $0.550 $0.550
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 1,550.000 $5.000 $0.550 $0.550 $0.600 $0.550 $0.550
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 5,907.000 $0.850 $1.500 $0.950 $0.700 $1.600 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 30.000 $0.760 $1.500 $9.750 $1.300 $1.600 $1.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 9,161.000 $0.540 $0.700 $0.670 $0.700 $0.670 $0.700
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 16,710.000 $0.230 $0.340 $0.340 $0.360 $0.340 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 75,808.000 $0.220 $0.300 $0.300 $0.320 $0.300 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 76,137.000 $0.230 $0.300 $0.300 $0.320 $0.300 $0.300
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 396.000 $12.000 $11.000 $11.000 $11.750 $11.000 $11.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 25.000 $196.000 $200.000 $200.000 $210.000 $200.000 $200.000
PREFAB PAV MRK TY C (W) (WORD)
EA 25.000 $235.000 $220.000 $220.000 $230.000 $220.000 $220.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 87.000 $30.000 $37.000 $37.000 $39.000 $37.000 $37.000
REFL PAV MRKR TY II-A-A
EA 381.000 $3.000 $3.000 $3.000 $3.200 $3.000 $3.000
REFL PAV MRKR TY II-C-R
EA 1,437.000 $3.000 $3.000 $3.000 $3.200 $3.000 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 3,490.000 $2.500 $0.500 $0.470 $1.250 $0.470 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 334.000 $70.000 $80.000 $52.560 $50.000 $64.950 $50.000
Totals: $7,233,639.050 $6,433,805.700 $6,466,666.660 $7,061,150.090 $7,296,389.760 $9,167,593.600