PREPARING ROW
|
STA
|
329.400
|
$641.200
|
$495.000
|
$94.000
|
$920.000
|
$500.000
|
$2,015.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
30,201.000
|
$15.000
|
$6.600
|
$10.000
|
$11.000
|
$15.000
|
$21.600
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
14,718.000
|
$15.000
|
$9.800
|
$3.500
|
$11.000
|
$13.000
|
$19.440
|
|
|
BACKFILL (TY A OR B)
|
STA
|
225.000
|
$100.000
|
$188.000
|
$90.000
|
$260.000
|
$525.000
|
$175.950
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
21.500
|
$1,000.000
|
$1,410.000
|
$1,400.000
|
$1,900.000
|
$1,500.000
|
$1,200.000
|
|
|
FERTILIZER
|
TON
|
6.700
|
$1,500.000
|
$2,000.000
|
$890.000
|
$1,200.000
|
$1,200.000
|
$1,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,681.700
|
$15.000
|
$24.000
|
$17.000
|
$16.000
|
$18.000
|
$23.940
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
7,600.000
|
$75.000
|
$92.000
|
$100.000
|
$111.000
|
$135.000
|
$108.860
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
792.000
|
$200.000
|
$196.000
|
$308.000
|
$290.000
|
$215.000
|
$270.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
35,433.000
|
$3.250
|
$6.650
|
$3.000
|
$6.500
|
$5.000
|
$3.510
|
|
|
PRIME COAT (MC-30)
|
GAL
|
6,567.000
|
$6.000
|
$5.200
|
$5.000
|
$5.000
|
$5.250
|
$6.340
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
11,495.000
|
$4.000
|
$3.700
|
$4.000
|
$5.500
|
$5.500
|
$4.930
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
2,085.000
|
$140.000
|
$160.000
|
$158.000
|
$235.000
|
$160.000
|
$173.130
|
|
|
ASPH (AC-15P OR AC-20-5TR)
|
GAL
|
69,878.000
|
$4.500
|
$4.350
|
$5.000
|
$5.250
|
$5.000
|
$5.490
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
3,775.000
|
$45.000
|
$42.000
|
$55.000
|
$65.000
|
$105.000
|
$61.620
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
166,103.000
|
$1.500
|
$1.700
|
$1.000
|
$1.350
|
$3.000
|
$2.160
|
|
|
CEM STABIL BKFL
|
CY
|
1.490
|
$150.000
|
$245.000
|
$134.000
|
$480.000
|
$350.000
|
$1,000.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
3.720
|
$200.000
|
$310.000
|
$179.000
|
$1,450.000
|
$500.000
|
$1,000.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
16.500
|
$162.500
|
$456.000
|
$450.000
|
$1,550.000
|
$350.000
|
$725.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
24.000
|
$471.300
|
$760.000
|
$570.000
|
$775.000
|
$600.000
|
$750.000
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
311.000
|
$200.000
|
$210.000
|
$100.000
|
$200.000
|
$225.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
45.000
|
$550.000
|
$643.970
|
$530.000
|
$565.000
|
$600.000
|
$850.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
88.000
|
$24.070
|
$95.000
|
$44.000
|
$105.000
|
$125.000
|
$129.450
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
24.000
|
$550.000
|
$693.000
|
$448.000
|
$1,275.000
|
$600.000
|
$750.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
124.000
|
$750.000
|
$811.000
|
$555.000
|
$750.000
|
$900.000
|
$1,050.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
300.000
|
$892.860
|
$852.000
|
$747.000
|
$1,000.000
|
$850.000
|
$1,400.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
237.000
|
$70.000
|
$100.120
|
$89.000
|
$80.000
|
$100.000
|
$120.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
352.000
|
$83.750
|
$130.000
|
$100.000
|
$95.000
|
$135.000
|
$260.000
|
|
|
SET (REPLACE PIPE RUNNER)
|
EA
|
2.000
|
$1,518.000
|
$2,290.000
|
$1,530.000
|
$1,350.000
|
$7,500.000
|
$4,200.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
2.000
|
$8,500.000
|
$8,350.000
|
$10,000.000
|
$9,000.000
|
$11,000.000
|
$8,200.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
14.000
|
$10,500.000
|
$10,600.000
|
$6,000.000
|
$10,500.000
|
$11,500.000
|
$7,400.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
17.000
|
$6,760.290
|
$15,100.000
|
$10,000.000
|
$16,850.000
|
$14,000.000
|
$14,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(6:1) (C)
|
EA
|
17.000
|
$7,414.040
|
$16,800.000
|
$13,600.000
|
$19,885.000
|
$16,000.000
|
$22,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,200.000
|
$2,050.000
|
$2,000.000
|
$1,900.000
|
$2,300.000
|
$3,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
$2,145.500
|
$2,100.000
|
$2,400.000
|
$1,750.000
|
$3,000.000
|
$4,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
52.000
|
$1,800.000
|
$2,100.000
|
$2,400.000
|
$1,785.000
|
$2,500.000
|
$4,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$2,500.000
|
$5,110.000
|
$4,700.000
|
$4,400.000
|
$4,000.000
|
$5,500.000
|
|
|
REMOV & RE - LAY PIPE (30 IN)
|
LF
|
344.000
|
$60.000
|
$109.000
|
$65.000
|
$200.000
|
$100.000
|
$150.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
11.000
|
$2,500.000
|
$2,450.000
|
$733.000
|
$12,400.000
|
$3,500.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
92.000
|
$350.000
|
$368.000
|
$1,557.000
|
$340.000
|
$500.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,186.000
|
$20.000
|
$19.000
|
$25.000
|
$34.000
|
$30.000
|
$16.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$575,000.000
|
$542,000.000
|
$208,025.000
|
$950,000.000
|
$1,316,092.630
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$10,000.000
|
$8,830.000
|
$1,700.000
|
$9,000.000
|
$12,000.000
|
$5,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,946.000
|
$3.000
|
$3.600
|
$4.000
|
$6.000
|
$4.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,946.000
|
$1.000
|
$1.100
|
$1.000
|
$1.750
|
$1.500
|
$2.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
14,550.000
|
$40.000
|
$31.000
|
$83.000
|
$16.000
|
$75.000
|
$88.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
6,420.000
|
$15.000
|
$11.000
|
$11.000
|
$13.000
|
$20.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
14,550.000
|
$25.000
|
$13.000
|
$12.000
|
$15.000
|
$15.000
|
$15.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
132.000
|
$100.210
|
$101.000
|
$110.000
|
$160.000
|
$206.820
|
$150.000
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
4,102.000
|
$40.000
|
$73.000
|
$47.000
|
$92.000
|
$50.000
|
$75.240
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
1,310.000
|
$40.000
|
$49.000
|
$39.000
|
$143.000
|
$45.000
|
$75.240
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
65,874.000
|
$0.180
|
$0.200
|
$0.120
|
$0.300
|
$0.100
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
32,937.000
|
$0.180
|
$0.300
|
$0.120
|
$0.350
|
$0.150
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
375.000
|
$30.000
|
$30.000
|
$35.000
|
$35.000
|
$35.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$1,840.000
|
$1,800.000
|
$2,200.000
|
$2,500.000
|
$2,150.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
4.000
|
$850.000
|
$1,050.000
|
$1,000.000
|
$1,075.000
|
$1,700.000
|
$950.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,590.000
|
$2.000
|
$2.200
|
$3.000
|
$8.000
|
$3.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,250.000
|
$3,440.000
|
$4,000.000
|
$3,600.000
|
$4,250.000
|
$3,600.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
26.000
|
$2,000.000
|
$832.000
|
$1,600.000
|
$3,350.000
|
$1,100.000
|
$1,450.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
30.000
|
$1,000.000
|
$388.000
|
$830.000
|
$620.000
|
$1,200.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
30.000
|
$12,000.000
|
$8,760.000
|
$8,800.000
|
$11,430.000
|
$12,000.000
|
$7,950.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
7.000
|
$250.000
|
$249.000
|
$250.000
|
$245.000
|
$500.000
|
$225.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$638.260
|
$748.000
|
$750.000
|
$940.000
|
$1,000.000
|
$675.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
39.000
|
$750.000
|
$804.000
|
$807.000
|
$775.000
|
$850.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
16.000
|
$1,000.000
|
$943.000
|
$945.000
|
$810.000
|
$900.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
19.000
|
$1,000.000
|
$1,010.000
|
$1,000.000
|
$958.000
|
$1,250.000
|
$915.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
65.000
|
$75.000
|
$78.000
|
$78.000
|
$56.000
|
$150.000
|
$70.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
10.000
|
$200.000
|
$249.000
|
$250.000
|
$860.000
|
$1,000.000
|
$225.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
74.000
|
$125.000
|
$83.000
|
$83.000
|
$64.000
|
$100.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$35.000
|
$31.000
|
$31.000
|
$50.000
|
$50.000
|
$28.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
80,000.000
|
$0.250
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.430
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
80,000.000
|
$0.250
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.430
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
61.000
|
$4.000
|
$3.350
|
$3.300
|
$3.500
|
$3.500
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
755.000
|
$4.000
|
$3.350
|
$3.300
|
$3.500
|
$3.500
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
55,727.000
|
$1.000
|
$0.500
|
$0.500
|
$0.500
|
$0.600
|
$0.450
|
|
|
WK ZN PAV MRK REMOV (W)8"(DOT)
|
LF
|
1,100.000
|
$2.500
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,205.000
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.100
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
59,714.000
|
$1.000
|
$0.500
|
$0.500
|
$0.500
|
$0.750
|
$0.450
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,793.000
|
$2.000
|
$1.500
|
$1.000
|
$3.000
|
$5.000
|
$1.970
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,000.000
|
$2.000
|
$1.500
|
$1.000
|
$3.000
|
$5.000
|
$1.970
|
|
REFL PAV MRK TY I (W)4"(LNDP)(090MIL)
|
LF
|
187.000
|
$0.680
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.450
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
7,926.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
148.000
|
$10.000
|
$18.000
|
$17.000
|
$17.500
|
$20.000
|
$16.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
912.000
|
$0.390
|
$0.550
|
$0.500
|
$0.550
|
$0.600
|
$0.480
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
64,523.000
|
$3.000
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
4,521.000
|
$0.300
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
74,795.000
|
$0.300
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
$0.450
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
26.000
|
$200.000
|
$222.000
|
$222.000
|
$225.000
|
$250.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$466.770
|
$388.000
|
$389.000
|
$360.000
|
$400.000
|
$350.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
26.000
|
$250.000
|
$305.000
|
$300.000
|
$300.000
|
$350.000
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
19.000
|
$23.670
|
$13.000
|
$13.000
|
$13.000
|
$14.000
|
$12.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
490.000
|
$3.000
|
$3.900
|
$4.000
|
$3.500
|
$4.000
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,056.000
|
$4.000
|
$3.350
|
$4.000
|
$3.500
|
$4.000
|
$3.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
5.000
|
$1,274.320
|
$9,170.000
|
$9,000.000
|
$9,000.000
|
$10,000.000
|
$8,270.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
5.000
|
$737.060
|
$721.000
|
$720.000
|
$700.000
|
$1,000.000
|
$650.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
78.000
|
$20,000.000
|
$500.000
|
$1,900.000
|
$6,400.000
|
$750.000
|
$540.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
23,229.000
|
$140.000
|
$113.000
|
$145.000
|
$153.000
|
$138.000
|
$126.000
|
|
|
TACK COAT
|
GAL
|
15,621.000
|
$4.000
|
$4.050
|
$5.000
|
$3.250
|
$6.000
|
$4.550
|
|
|
BIRD EXCLUSION METHOD
|
SF
|
6,184.000
|
$5.000
|
$6.400
|
$3.000
|
$11.000
|
$6.000
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$22,500.000
|
$6,000.000
|
$22,000.000
|
$30,000.000
|
$7,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
68.000
|
$215.000
|
$205.000
|
$156.000
|
$348.000
|
$300.000
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
204.000
|
$450.000
|
$686.000
|
$417.000
|
$315.000
|
$100.000
|
$750.000
|
|
Totals: |
$12,650,406.520
|
$10,116,593.440
|
$10,963,395.660
|
$12,344,748.950
|
$13,123,916.940
|
$13,930,749.758
|