Job Info for 0180-10-083

County: SAN PATRICIO Highway: SH 361 Date: 05/08/2019 (5 years ago) Engineer's Estimate: $3,466,771 Control Number: 0180-10-083
Project: C 180-10-83 District: CORPUS CHRISTI Time: 87 WORKING DAYS Type: MILL AND INLAY

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,466,771.15
HAAS-ANDERSON CONSTRUCTION, LTD.   $3,356,712.65 1
-3.17% | -$110,058.50
ANGEL BROTHERS HOLDINGS CORP.   $4,191,557.00 2
20.91% | $724,785.85
24.87% | $834,844.35
BAY LTD.   $4,322,303.80 3
24.68% | $855,532.65
28.77% | $965,591.15
3.12% | $130,746.80

Bid Items

Items: 39, 0 filtered
SAN PATRICIO SH 361  |  CORPUS CHRISTI  |  0180-10-083  |  05/08/2019  |  $3,466,771  |  C 180-10-83  |  MILL AND INLAY  |  87 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HAAS-ANDERSON CONSTRUCTION, LTD. ANGEL BROTHERS HOLDINGS CORP. BAY LTD.
100 6002 PREPARING ROW STA 234.000 $300.000 $94.000 $150.000 $750.000
134 6004 BACKFILL (TY A OR B) STA 10.000 $135.000 $360.000 $540.000 $470.000
316 6427 AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B) CY 1,414.000 $85.000 $123.000 $65.000 $150.000
316 6448 ASPH (AC-15P OR AC-20-5TR) GAL 60,665.000 $3.150 $2.800 $3.500 $3.500
341 6042 D-GR HMA TY-D SAC-B PG70-22 TON 12,833.000 $80.000 $91.650 $107.000 $110.000
348 6007 TBWC (MEMBRANE) GAL 33,757.000 $3.000 $3.050 $3.000 $3.400
348 6008 TBWC (ASPHALT) TON 465.000 $130.000 $134.000 $170.000 $150.000
348 6009 TBWC (AGGREGATE)(TY C) TON 7,975.000 $120.000 $134.000 $170.000 $150.000
351 6019 FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") SY 2,330.000 $20.000 $23.000 $24.000 $33.000
354 6045 PLANE ASPH CONC PAV (2") SY 155,551.000 $1.500 $1.500 $1.500 $2.000
354 6077 PLANE ASPH CONC PAV (0" TO 3/4") SY 689.000 $1.500 $7.950 $3.000 $4.300
479 6001 ADJUSTING MANHOLES EA 3.000 $500.000 $1,330.000 $1,500.000 $3,200.000
500 6001 MOBILIZATION LS 1.000 $350,000.000 $123,000.000 $350,000.000 $162,500.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $4,500.000 $1,550.000 $1,300.000 $12,000.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 1,695.000 $5.000 $4.250 $7.000 $4.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 1,695.000 $1.000 $0.400 $1.000 $1.300
530 6002 INTERSECTIONS (ACP) SY 4,856.000 $30.000 $10.000 $25.000 $27.000
530 6008 TURNOUTS (ACP) SY 613.000 $60.000 $20.000 $40.000 $35.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 3.000 $475.000 $636.000 $700.000 $660.000
644 6030 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 4.000 $575.000 $742.000 $823.000 $770.000
644 6076 REMOVE SM RD SN SUP&AM EA 7.000 $50.000 $106.000 $118.000 $110.000
658 6050 INSTL OM ASSM (OM-2Z)(FLX)SRF EA 8.000 $85.000 $117.000 $129.000 $120.000
662 6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 9,680.000 $0.250 $0.200 $0.500 $0.250
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 9,420.000 $0.250 $0.200 $0.500 $0.250
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 6,454.000 $0.250 $0.200 $0.500 $0.250
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,881.000 $0.800 $0.950 $1.000 $1.000
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 11,970.000 $0.350 $0.400 $0.500 $0.450
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 1,240.000 $0.300 $0.400 $0.500 $0.450
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 11,530.000 $0.300 $0.400 $0.500 $0.450
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 47,752.000 $0.300 $0.400 $0.500 $0.400
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 463.000 $12.000 $8.500 $9.000 $9.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 14.000 $175.000 $196.000 $218.000 $210.000
668 6078 PREFAB PAV MRK TY C (W) (DBL ARROW) EA 2.000 $300.000 $397.000 $440.000 $410.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 4.000 $250.000 $291.000 $324.000 $310.000
672 6007 REFL PAV MRKR TY I-C EA 598.000 $3.000 $4.500 $5.000 $4.600
672 6009 REFL PAV MRKR TY II-A-A EA 1,197.000 $3.000 $4.500 $5.000 $4.600
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $6,000.000 $8,260.000 $3,000.000 $6,200.000
6185 6002 TMA (STATIONARY) DAY 70.000 $100.000 $10.000 $350.000 $520.000
6185 6003 TMA (MOBILE OPERATION) HR 350.000 $50.000 $10.000 $50.000 $49.000
Totals: $3,466,771.15 $3,356,712.65 $4,191,557.00 $4,322,303.80