0122-04-039
|
ANDERSON
|
TYLER
|
$1,207,241
|
US 287
|
STP 2020(691)
|
04/09/2020
|
11/15/2023
|
INSTL CENTERLINE & EDGELINE RUMBLE S...
|
STRIPE-A-ZONE, INC.
($1,097,778)
|
|
|
6356-71-001
|
ANGELINA
|
LUFKIN
|
$259,650
|
US0059
|
RMC - 635671001
|
04/15/2020
|
11/15/2023
|
SPOT TEXTURIZING
|
STRIPE-A-ZONE, INC.
($392,450)
|
|
|
6356-72-001
|
ANGELINA
|
LUFKIN
|
$168,250
|
US0059
|
RMC - 635672001
|
04/15/2020
|
11/15/2023
|
DISTRICT WIDE LARGE SIGN MAINT
|
VACA UNDERGROUND UTILITIES INC
($221,625)
|
|
|
6356-73-001
|
ANGELINA
|
LUFKIN
|
$165,070
|
US0059
|
RMC - 635673001
|
04/22/2020
|
11/15/2023
|
INSTL OF SPECIALTY PVMNT MRK
|
STRIPING TECHNOLOGY, L.P.
($211,605)
|
|
|
6356-74-001
|
ANGELINA
|
LUFKIN
|
$263,450
|
US0059
|
RMC - 635674001
|
04/22/2020
|
11/15/2023
|
DISTRICT WIDE TRAF SIGNAL MAINT
|
BAY CITY TRAFFIC
($261,700)
|
|
|
6356-75-001
|
ANGELINA
|
LUFKIN
|
$253,035
|
US0059
|
RMC - 635675001
|
04/29/2020
|
11/15/2023
|
ILLUM
|
VACA UNDERGROUND UTILITIES INC
($233,320)
|
|
|
6356-76-001
|
ANGELINA
|
LUFKIN
|
$261,775
|
US0059
|
RMC - 635676001
|
04/29/2020
|
11/15/2023
|
THERMOPLASTIC STRIPING
|
STRIPING TECHNOLOGY, L.P.
($295,040)
|
|
|
0114-04-073
|
BASTROP
|
AUSTIN
|
$907,709
|
US 290
|
BR 2020(844)
|
04/08/2020
|
11/15/2023
|
REHAB BRIDGE
|
RESTEK, INC.
($863,708)
|
|
|
6357-40-001
|
BAYLOR
|
WICHITA FALLS
|
$161,000
|
US0082
|
MMC - 635740001
|
04/07/2020
|
11/15/2023
|
HOT MIX (MATERIALS ONLY)
|
AUSTIN ASPHALT, INC.
($158,328)
|
|
|
6356-83-001
|
BELL
|
WACO
|
$751,420
|
US0190
|
MMC - 635683001
|
04/09/2020
|
11/15/2023
|
COLD MIX - MATERAL ONLY
|
KNIFE RIVER CORPORATION - SOUTH
($631,470)
|
|
|
6356-91-001
|
BELL
|
WACO
|
$2,421,390
|
US0190
|
MMC - 635691001
|
04/09/2020
|
11/15/2023
|
HOT MIX - MATERIAL ONLY
|
AUSTIN MATERIALS, LLC
($2,275,500)
|
|
|
6359-41-001
|
BELL
|
WACO
|
$520,944
|
US0190
|
RMC - 635941001
|
04/09/2020
|
11/15/2023
|
RAISED PAVMT MARKER MAINT
|
BRYDL CONTRACTING, INC.
($318,759)
|
|
|
0915-00-201
|
BEXAR
|
SAN ANTONIO
|
$2,238,084
|
VA
|
STP 2020(682)
|
04/09/2020
|
11/15/2023
|
PURCHASE AND INSTL SIGNS AND EQUIPME...
|
VACA UNDERGROUND UTILITIES INC
($1,582,979)
|
|
|
6349-75-001
|
BEXAR
|
SAN ANTONIO
|
$292,181
|
MR0681
|
RMC - 634975001
|
04/15/2020
|
11/15/2023
|
ROUTINE MAINT CONTRACT
|
LONE STAR PAVING COMPANY
($195,505)
|
|
|
6359-15-001
|
BEXAR
|
SAN ANTONIO
|
$2,895,554
|
IH0035
|
RMC - 635915001
|
04/08/2020
|
11/15/2023
|
PAV MRK & MRKRS CENTERLINE TEXTURE
|
TRP CONSTRUCTION GROUP, LLC
($2,792,098)
|
|
|
6359-26-001
|
BEXAR
|
SAN ANTONIO
|
$295,000
|
IH0410
|
MMC - 635926001
|
04/14/2020
|
11/15/2023
|
MATERIAL ONLY DELIVERY OF HMA
|
CENTURY ASPHALT, LTD.
($271,550)
|
|
|
6359-81-001
|
BEXAR
|
SAN ANTONIO
|
$295,000
|
IH0410
|
MMC - 635981001
|
04/14/2020
|
11/15/2023
|
MATERIAL ONLY DELIVERY OF HMA
|
CENTURY ASPHALT, LTD.
($270,600)
|
|
|
6358-20-001
|
BORDEN
|
ABILENE
|
$79,468
|
US0180
|
MMC - 635820001
|
04/29/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($77,830)
|
|
|
6358-38-001
|
BORDEN
|
ABILENE
|
$87,448
|
US0180
|
MMC - 635838001
|
04/20/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($92,840)
|
|
|
6356-86-001
|
BOSQUE
|
WACO
|
$779,810
|
SH0006
|
MMC - 635686001
|
04/09/2020
|
11/15/2023
|
HOT MIX - MATERIAL ONLY
|
BIG CREEK CONSTRUCTION, LTD.
($800,750)
|
|
|
0010-12-072
|
BOWIE
|
ATLANTA
|
$1,100,689
|
US 67
|
STP 2020(817)
|
04/08/2020
|
11/15/2023
|
INSTL SAFETY LIGHTING
|
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
($1,089,559)
|
|
|
6357-08-001
|
BOWIE
|
ATLANTA
|
$589,775
|
US0059
|
RMC - 635708001
|
04/08/2020
|
11/15/2023
|
CALLOUT METAL BEAM GUARD FENCE REPAI...
|
CATOCON, INC.
($702,035)
|
|
|
6360-33-001
|
BOWIE
|
ATLANTA
|
$114,134
|
IH0030
|
RMC - 636033001
|
04/23/2020
|
11/15/2023
|
LANDSCAPE MAINT IH0030/US0059
|
SOUTHERN EDGE CONTRACTORS LLC
($116,824)
|
|
|
0111-04-035
|
BRAZORIA
|
HOUSTON
|
$2,115,337
|
FM 521
|
STP 2020(694)
|
04/09/2020
|
11/15/2023
|
PAVMT REPAIR, SEAL COAT AND 1.5 IN P...
|
DURWOOD GREENE CONSTRUCTION CO.
($1,947,783)
|
|
|
6354-37-001
|
BRAZORIA
|
HOUSTON
|
$757,641
|
SH0288
|
RMC - 635437001
|
04/09/2020
|
11/15/2023
|
ACP OVERLAY
|
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
($781,875)
|
|
|
6353-30-001
|
BREWSTER
|
EL PASO
|
$187,150
|
US0090
|
RMC - 635330001
|
04/22/2020
|
11/15/2023
|
METAL BEAM GUARDRAIL REPAIR
|
MIJELUM, L.L.C.
($177,500)
|
|
|
6356-79-001
|
BREWSTER
|
EL PASO
|
$277,600
|
US0090
|
RMC - 635679001
|
04/22/2020
|
11/15/2023
|
BARRICADES, SIGNS AND TRAF CONTROL
|
MIJELUM, L.L.C.
($253,000)
|
|
|
0054-07-084
|
BROWN
|
BROWNWOOD
|
$1,653,926
|
US 84
|
STP 2020(763)HES
|
04/09/2020
|
11/15/2023
|
IMPROVE GUARDRAIL AND ADD SET'S
|
3LW CIVIL LLC
($1,396,323)
|
|
|
0079-01-043
|
BROWN
|
BROWNWOOD
|
$764,279
|
US 67
|
STP 2020(764)HES
|
04/08/2020
|
11/15/2023
|
IMPROVE GUARDRAIL & SAFETY TREAT FIX...
|
3LW CIVIL LLC
($735,534)
|
|
|
0917-30-055
|
BURLESON
|
BRYAN
|
$1,521,771
|
CR
|
BR 1702(414)
|
04/09/2020
|
11/15/2023
|
BRIDGE REPL
|
FUQUA CONSTRUCTION CO., INC.
($1,458,198)
|
|
|
6358-42-001
|
CALLAHAN
|
ABILENE
|
$283,100
|
IH0020
|
MMC - 635842001
|
04/16/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($268,964)
|
|
|
6360-80-001
|
CALLAHAN
|
ABILENE
|
$322,603
|
IH0020
|
RMC - 636080001
|
04/08/2020
|
11/15/2023
|
MOW HWY RIGHT OF WAY CALLAHAN COUNTY
|
ABESCAPE LANDSCAPING, LLC
($354,020)
|
|
|
0331-04-069
|
CAMERON
|
PHARR
|
$6,998,934
|
PR 100
|
BR 2020(709)
|
04/09/2020
|
11/15/2023
|
BRIDGE MAINT
|
SOUTHERN ROAD & BRIDGE, LLC
($9,814,198)
|
|
|
1150-02-006
|
CHEROKEE
|
TYLER
|
$3,376,063
|
FM 235
|
STP 2020(856)HES
|
04/09/2020
|
11/15/2023
|
WIDEN,IMPROVE DRNG,UPGRD GUARD RAIL,...
|
MADDEN CONTRACTING COMPANY, LLC.
($3,457,805)
|
|
|
6355-58-001
|
CHEROKEE
|
TYLER
|
$80,889
|
US0069
|
RMC - 635558001
|
04/07/2020
|
11/15/2023
|
ASPH AND CONC DRIVEWAY REPAIRS
|
LELAND & BRADLEE CONSTRUCTION, INC.
($90,738)
|
|
|
6357-81-001
|
CLAY
|
WICHITA FALLS
|
$139,800
|
US0287
|
MMC - 635781001
|
04/07/2020
|
09/26/2024
|
HOT MIX (MATERIALS ONLY)
|
EUROVIA ATLANTIC COAST LLC
($120,775)
|
|
|
0054-02-035
|
COLEMAN
|
BROWNWOOD
|
$488,257
|
US 84
|
STP 2020(762)HES
|
04/09/2020
|
11/15/2023
|
IMPROVE GUARDRAIL
|
3LW CIVIL LLC
($444,117)
|
|
|
2247-01-011
|
COLLIN
|
DALLAS
|
$3,210,783
|
FM 2194
|
STP 2020(723)HES
|
04/08/2020
|
11/15/2023
|
PROVIDE ADDITIONAL PAVED SURF WIDTH
|
A. K. GILLIS & SONS, LLC
($3,089,623)
|
|
|
6354-15-001
|
COLLIN
|
DALLAS
|
$217,415
|
SH0289
|
RMC - 635415001
|
04/14/2020
|
11/15/2023
|
FULL DEPTH CONC REPAIR
|
O. TREVINO CONSTRUCTION, LLC
($224,980)
|
|
|
6356-65-001
|
COLLIN
|
DALLAS
|
$1,716,219
|
FM0981
|
RMC - 635665001
|
04/08/2020
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
A. K. GILLIS & SONS, LLC
($1,625,332)
|
|
|
6358-98-001
|
COMAL
|
SAN ANTONIO
|
$229,800
|
IH0035
|
MMC - 635898001
|
04/14/2020
|
11/15/2023
|
MATERIAL ONLY DELIVERY OF EMULSION
|
ERGON ASPHALT & EMULSIONS, INC.
($211,320)
|
|
|
0183-01-047
|
COMANCHE
|
BROWNWOOD
|
$253,484
|
SH 36
|
STP 2020(770)HES
|
04/08/2020
|
11/15/2023
|
INSTL INTERS FLASHING BEACON
|
AMERICAN LIGHTING AND SIGNALIZATION, LLC
($274,719)
|
|
|
0257-05-046
|
COMANCHE
|
BROWNWOOD
|
$15,485,237
|
SH 6
|
NH 2020(457)
|
04/09/2020
|
11/15/2023
|
CONSTRUCT SUPER 2 HWY AND SURF
|
KNIFE RIVER CORPORATION - SOUTH
($13,793,113)
|
|
|
1855-01-028
|
COOKE
|
WICHITA FALLS
|
$152,712
|
FM 922
|
STP 2020(833)HES
|
04/08/2020
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
3LW CIVIL LLC
($159,018)
|
|
|
6357-82-001
|
COOKE
|
WICHITA FALLS
|
$177,200
|
US0082
|
MMC - 635782001
|
04/07/2020
|
09/26/2024
|
HOT MIX (MATERIALS ONLY)
|
EUROVIA ATLANTIC COAST LLC
($159,800)
|
|
|
6359-06-001
|
COOKE
|
WICHITA FALLS
|
$266,014
|
IH0035
|
RMC - 635906001
|
04/23/2020
|
11/15/2023
|
TEXTURING CONC PAVMT
|
TOTAL HIGHWAY MAINTENANCE, LLC
($303,616)
|
|
|
6352-28-001
|
CORYELL
|
WACO
|
$730,978
|
FM0116
|
RMC - 635228001
|
04/09/2020
|
11/15/2023
|
MISC. CONC AND CULVERT REPAIRS-DISTR...
|
CROSS PLUS CONSTRUCTION, LLC
($766,637)
|
|
|
6356-92-001
|
CORYELL
|
WACO
|
$583,464
|
US0084
|
MMC - 635692001
|
04/09/2020
|
11/15/2023
|
HOT MIX - MATERIAL ONLY
|
BIG CREEK CONSTRUCTION, LTD.
($519,000)
|
|
|
0140-11-046
|
CROCKETT
|
SAN ANGELO
|
$3,097,661
|
IH 10
|
NH 2020(748)
|
04/08/2020
|
11/15/2023
|
MICROSURF
|
INTERMOUNTAIN SLURRY SEAL, INC.
($2,925,471)
|
|
|
0918-47-227
|
DALLAS
|
DALLAS
|
$1,613,093
|
CS
|
STP 2020(722)HES
|
04/08/2020
|
11/15/2023
|
TRAF SIGNAL AND SIDEWALK INSTL
|
SELECT MAINTENANCE, L.L.C.
($1,568,006)
|
|
|
2374-03-094
|
DALLAS
|
DALLAS
|
$5,845,941
|
IH 20
|
NH 2020(719)
|
04/09/2020
|
11/15/2023
|
FOR THE CONSTRUCTION OF BRIDGE DECK...
|
SILVER CREEK CONSTRUCTION, INC.
($4,328,706)
|
|
|
6342-66-001
|
DALLAS
|
DALLAS
|
$1,305,559
|
IH0045
|
RMC - 634266001
|
04/08/2020
|
11/15/2023
|
RETROREFLECTORIZED PAVMT MRK & MARKE...
|
TOTAL HIGHWAY MAINTENANCE, LLC
($1,154,075)
|
|
|
6342-67-001
|
DALLAS
|
DALLAS
|
$1,281,271
|
US0075
|
RMC - 634267001
|
04/08/2020
|
11/15/2023
|
RETROREFLECT PAVMT MRK & MARKERS
|
TOTAL HIGHWAY MAINTENANCE, LLC
($1,402,828)
|
|
|
6342-68-001
|
DALLAS
|
DALLAS
|
$1,113,935
|
SS0408
|
RMC - 634268001
|
04/09/2020
|
11/15/2023
|
RETROREFLECTORIZED PAVMT MRK & MARKE...
|
TOTAL HIGHWAY MAINTENANCE, LLC
($909,060)
|
|
|
6342-69-001
|
DALLAS
|
DALLAS
|
$1,175,568
|
IH0035E
|
RMC - 634269001
|
04/09/2020
|
11/15/2023
|
REFLECTORIZED PAVMT MRK & MARKER
|
TOTAL HIGHWAY MAINTENANCE, LLC
($1,132,085)
|
|
|
6355-75-001
|
DALLAS
|
DALLAS
|
$318,617
|
US0080
|
RMC - 635575001
|
04/08/2020
|
11/15/2023
|
STORM SEWER AND INLET CLEANING
|
SHALOM SERVICES CORPORATION
($346,010)
|
|
|
6356-14-001
|
DALLAS
|
DALLAS
|
$1,141,470
|
SL0012
|
RMC - 635614001
|
04/08/2020
|
11/15/2023
|
ON-CALL RETROREFLECT PAVMT MRK
|
STRIPING TECHNOLOGY, L.P.
($1,385,985)
|
|
|
6357-15-001
|
DAWSON
|
LUBBOCK
|
$319,600
|
US0087
|
RMC - 635715001
|
04/08/2020
|
11/15/2023
|
ROADSIDE MOW
|
TEXAS BLACKTOPS LLC
($287,800)
|
|
|
6359-68-001
|
DELTA
|
PARIS
|
$247,200
|
SH0024
|
MMC - 635968001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSIONS - MATERIALS ON...
|
ERGON ASPHALT & EMULSIONS, INC.
($226,150)
|
|
|
0913-17-039
|
DEWITT
|
YOAKUM
|
$1,155,424
|
CR
|
BR 2012(654)
|
04/09/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
SB CONTRACTORS LLC
($1,067,538)
|
|
|
6359-80-001
|
ECTOR
|
ODESSA
|
$616,000
|
IH0020
|
RMC - 635980001
|
04/09/2020
|
11/15/2023
|
CALLOUT BRIDGE REPAIR
|
SCR CIVIL CONSTRUCTION, LLC
($490,575)
|
|
|
6360-78-001
|
ECTOR
|
ODESSA
|
$85,000
|
SL0338
|
MMC - 636078001
|
04/28/2020
|
11/15/2023
|
LIMESTONE ROCK ASPH (MATERIALS ONLY)
|
VULCAN CONSTRUCTION MATERIALS, LLC
($77,145)
|
|
|
0167-01-120
|
EL PASO
|
EL PASO
|
$993,343
|
US 54
|
NH 2020(874)
|
04/09/2020
|
11/15/2023
|
MILL AND INLAY (FRONTAGE ROAD)
|
ALLIED PAVING CO.
($719,532)
|
|
|
0167-01-127
|
EL PASO
|
EL PASO
|
$535,791
|
US 54
|
CM 2020(778)
|
04/08/2020
|
11/15/2023
|
INSTL OF RVSD AND CCTVS
|
TRI STATE ELECTRIC, LTD.
($587,855)
|
|
|
0924-06-603
|
EL PASO
|
EL PASO
|
$1,876,431
|
VA
|
NH 2020(773)
|
04/09/2020
|
11/15/2023
|
FY 2020 SIGNING PROJECT
|
TRI STATE ELECTRIC, LTD.
($1,766,831)
|
|
|
6353-31-001
|
EL PASO
|
EL PASO
|
$184,600
|
IH0010
|
RMC - 635331001
|
04/29/2020
|
11/15/2023
|
STORM SEWER & CULVERT CLEANING
|
MARTINEZ BROS. CONTRACTORS, LLC
($174,240)
|
|
|
6361-90-001
|
EL PASO
|
EL PASO
|
$201,450
|
IH0010
|
RMC - 636190001
|
04/29/2020
|
11/15/2023
|
STORM SEWER & CULVERT CLEANING
|
SYNERGY PROJECT CONTRACTORS, INC.
($192,888)
|
|
|
0808-01-061
|
FALLS
|
WACO
|
$2,033,804
|
FM 413
|
BR 2020(742)
|
04/08/2020
|
11/15/2023
|
BRIDGE RE-DECKING. CONC OVERLAY BRI...
|
JAMES CONSTRUCTION GROUP, L.L.C.
($1,990,000)
|
|
|
1154-01-020
|
FANNIN
|
PARIS
|
$6,017,407
|
FM 824
|
C 1154-1-20
|
04/08/2020
|
11/15/2023
|
2R REHAB
|
HIGHWAY 19 CONSTRUCTION LLC
($5,973,030)
|
|
|
6359-65-001
|
FANNIN
|
PARIS
|
$247,200
|
SH0078
|
MMC - 635965001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSION - MATERIALS ONL...
|
ERGON ASPHALT & EMULSIONS, INC.
($227,970)
|
|
|
6356-16-001
|
FAYETTE
|
YOAKUM
|
$253,000
|
IH0010
|
MMC - 635616001
|
04/20/2020
|
11/15/2023
|
ASPHIC PATCHING MATERIAL (MATERIAL O...
|
TEXAS MATERIALS GROUP, INC.
($235,475)
|
|
|
6358-84-001
|
FAYETTE
|
YOAKUM
|
$174,439
|
SH0071
|
RMC - 635884001
|
04/13/2020
|
11/15/2023
|
FRICTIONAL ASPHIC SURF PRESERVATION...
|
CLARK CONSTRUCTION OF TEXAS, INC.
($193,132)
|
|
|
6359-86-001
|
FAYETTE
|
YOAKUM
|
$31,794
|
SH0071
|
RMC - 635986001
|
04/20/2020
|
11/15/2023
|
ADDING RUMBLE STRIPS
|
STRIPE-A-ZONE, INC.
($30,994)
|
|
|
6358-17-001
|
FISHER
|
ABILENE
|
$224,080
|
US0180
|
MMC - 635817001
|
04/29/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($221,350)
|
|
|
6358-18-001
|
FISHER
|
ABILENE
|
$51,812
|
US0180
|
MMC - 635818001
|
04/16/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($49,381)
|
|
|
6358-19-001
|
FISHER
|
ABILENE
|
$20,478
|
US0180
|
MMC - 635819001
|
04/20/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($21,485)
|
|
|
6359-13-001
|
FORT BEND
|
HOUSTON
|
$284,440
|
US0059
|
RMC - 635913001
|
04/14/2020
|
11/15/2023
|
ASPH PAVMT REPAIR
|
FORDE CONSTRUCTION COMPANY, INC.
($300,140)
|
|
|
6359-71-001
|
FRANKLIN
|
PARIS
|
$247,200
|
IH0030
|
MMC - 635971001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSIONS - MATERIALS ON...
|
ERGON ASPHALT & EMULSIONS, INC.
($226,150)
|
|
|
0917-20-039
|
FREESTONE
|
BRYAN
|
$475,352
|
CR
|
BR 2019(179)
|
04/08/2020
|
11/15/2023
|
BRIDGE REPL
|
KNIFE RIVER CORPORATION - SOUTH
($479,341)
|
|
|
6360-71-001
|
FREESTONE
|
BRYAN
|
$295,000
|
US0084
|
MMC - 636071001
|
04/14/2020
|
11/15/2023
|
DENSE-GRADED HOT-MIX ASPH(MATERIAL O...
|
BIG CREEK CONSTRUCTION, LTD.
($232,500)
|
|
|
6357-16-001
|
GAINES
|
LUBBOCK
|
$569,800
|
US0062
|
RMC - 635716001
|
04/08/2020
|
11/15/2023
|
ROADSIDE MOW
|
TEXAS BLACKTOPS LLC
($517,150)
|
|
|
6355-14-001
|
GARZA
|
LUBBOCK
|
$3,993,860
|
US0084
|
MMC - 635514001
|
04/08/2020
|
11/15/2023
|
HERBICIDE & INSECTICIDE POST RDC (MA...
|
NUTRIEN AG SOLUTIONS, INC.
($3,786,880)
|
|
|
0573-04-017
|
GONZALES
|
YOAKUM
|
$3,864,100
|
FM 1116
|
STP 2020(710)
|
04/08/2020
|
11/15/2023
|
REHAB OF EXIST ROADWAY
|
HUNTER INDUSTRIES, LTD.
($3,364,665)
|
|
|
0091-01-054
|
GRAYSON
|
PARIS
|
$2,573,454
|
SH 289
|
STP 2020(740)
|
04/09/2020
|
11/15/2023
|
OVERLAY SH 289
|
JAGOE-PUBLIC COMPANY
($2,219,130)
|
|
|
6353-28-001
|
GRAYSON
|
PARIS
|
$266,813
|
US0082
|
BPM - 635328001
|
04/16/2020
|
11/15/2023
|
BPM-ABUTMENT & RIPRAP EROSION REPAIR
|
MHB CONSTRUCTION, INC.
($264,124)
|
|
|
6359-73-001
|
GRAYSON
|
PARIS
|
$247,200
|
US0075
|
MMC - 635973001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSION - MATERIALS ONL...
|
ERGON ASPHALT & EMULSIONS, INC.
($229,790)
|
|
|
2072-01-016
|
GREGG
|
TYLER
|
$4,806,415
|
FM 2204
|
STP 2020(708)HES
|
04/08/2020
|
11/15/2023
|
IMPROVE DRAINAGE, CULVERTS AND UPGRA...
|
STATELINE CONSTRUCTION, LLC
($3,889,931)
|
|
|
2073-01-009
|
GREGG
|
TYLER
|
$15,218,265
|
FM 2206
|
STP 2013(212)
|
04/08/2020
|
11/15/2023
|
GR, STR, ACP BASE & SURF, PV MK
|
EAST TEXAS BRIDGE, INC.
($15,164,541)
|
|
|
6359-27-001
|
GREGG
|
TYLER
|
$321,200
|
SH0031
|
RMC - 635927001
|
04/08/2020
|
11/15/2023
|
TREE RMVL
|
ROAD SOLUTIONS L.L.C.
($338,303)
|
|
|
6348-23-001
|
GRIMES
|
BRYAN
|
$141,049
|
FM1227
|
RMC - 634823001
|
04/14/2020
|
11/15/2023
|
SCOUR COUNTERMEASURES AT GRASSY CREE...
|
KNIFE RIVER CORPORATION - SOUTH
($128,430)
|
|
|
6360-72-001
|
GRIMES
|
BRYAN
|
$298,000
|
SH0105
|
MMC - 636072001
|
04/14/2020
|
11/15/2023
|
DENSE-GRADED HOT-MIX ASPH(MATERIAL O...
|
BIG CREEK CONSTRUCTION, LTD.
($276,500)
|
|
|
6355-16-001
|
GUADALUPE
|
SAN ANTONIO
|
$3,319,859
|
IH0010
|
MMC - 635516001
|
04/08/2020
|
11/15/2023
|
HERBICIDE/INSECTICIDE SEGUIN RDC (MA...
|
NUTRIEN AG SOLUTIONS, INC.
($3,175,613)
|
|
|
6356-01-001
|
HALE
|
LUBBOCK
|
$231,250
|
IH0027
|
MMC - 635601001
|
04/23/2020
|
11/15/2023
|
PURCHASE OF MATERIALS LRA
|
VULCAN CONSTRUCTION MATERIALS, LLC
($207,530)
|
|
|
6356-90-001
|
HAMILTON
|
WACO
|
$970,229
|
US0281
|
MMC - 635690001
|
04/09/2020
|
11/15/2023
|
HOT MIX - MATERIAL ONLY
|
KNIFE RIVER CORPORATION - SOUTH
($916,653)
|
|
|
0065-05-153
|
HARDIN
|
BEAUMONT
|
$279,713
|
US 96
|
STP 2020(780)HES
|
04/08/2020
|
11/15/2023
|
SAFETY IMPRV PROJECTS
|
THE TRUESDELL CORPORATION
($223,223)
|
|
|
0028-01-099
|
HARRIS
|
HOUSTON
|
$1,449,415
|
UA 90
|
NH 2020(693)
|
04/09/2020
|
11/15/2023
|
BASE REPAIR, MILL, OVERLAY ROAD & S...
|
JAMES CONSTRUCTION GROUP, L.L.C.
($1,366,271)
|
|
|
0389-12-092
|
HARRIS
|
HOUSTON
|
$593,805
|
SH 146
|
NH 2020(695)
|
04/08/2020
|
11/15/2023
|
INTERS IMPRVS
|
STATEWIDE TRAFFIC SIGNAL COMPANY
($496,375)
|
|
|
1685-05-123
|
HARRIS
|
HOUSTON
|
$239,084
|
SH 6
|
STP 2020(697)HES
|
04/08/2020
|
11/15/2023
|
IMPROVE TRAF SIG, INSTL ADVANCED WAR...
|
STATEWIDE TRAFFIC SIGNAL COMPANY
($207,829)
|
|
|
1685-05-128
|
HARRIS
|
HOUSTON
|
$503,166
|
SH 6
|
STP 2020(698)HES
|
04/08/2020
|
11/15/2023
|
TRAF SIGNAL IMPRVS
|
STATEWIDE TRAFFIC SIGNAL COMPANY
($387,861)
|
|
|
6354-03-001
|
HARRIS
|
HOUSTON
|
$518,766
|
IH0069
|
RMC - 635403001
|
04/09/2020
|
11/15/2023
|
TRAF CONTROL (NORTH)
|
ISI CONTRACTING, INC.
($932,700)
|
|
|
6354-07-001
|
HARRIS
|
HOUSTON
|
$676,586
|
US0090
|
RMC - 635407001
|
04/09/2020
|
11/15/2023
|
REPL PVMT MRKGS-LONG LINE STRIPING
|
TOTAL HIGHWAY MAINTENANCE, LLC
($685,426)
|
|
|
6354-66-001
|
HARRIS
|
HOUSTON
|
$883,809
|
SL0008
|
RMC - 635466001
|
04/09/2020
|
11/15/2023
|
FULL DEPTH CONC REPAIR
|
MAIN LANE INDUSTRIES LTD.
($910,775)
|
|
|
6355-05-001
|
HARRIS
|
HOUSTON
|
$1,653,600
|
SL0008
|
RMC - 635505001
|
04/09/2020
|
11/15/2023
|
ASPH PAVMT REPAIR
|
FORDE CONSTRUCTION COMPANY, INC.
($1,482,030)
|
|
|
6357-09-001
|
HARRISON
|
ATLANTA
|
$589,775
|
US0059
|
RMC - 635709001
|
04/08/2020
|
11/15/2023
|
CALLOUT MBGF REPAIR - SOUTH
|
JCW CONSTRUCTION, LLC
($852,050)
|
|
|
6357-46-001
|
HASKELL
|
ABILENE
|
$284,547
|
US0380
|
MMC - 635746001
|
04/16/2020
|
11/15/2023
|
PURCHASE OF MATERIAL DENSE GRADED HO...
|
VULCAN CONSTRUCTION MATERIALS, LLC
($239,840)
|
|
|
6358-01-001
|
HASKELL
|
ABILENE
|
$132,000
|
US0380
|
MMC - 635801001
|
04/20/2020
|
11/15/2023
|
MATERIALS ONLY
|
WRIGHT ASPHALT PRODUCTS COMPANY LLC
($108,480)
|
|
|
6360-85-001
|
HASKELL
|
ABILENE
|
$251,688
|
US0380
|
RMC - 636085001
|
04/14/2020
|
11/15/2023
|
MOW HWY RIGHT OF WAY
|
GREG SCRUGGS
($228,769)
|
|
|
0016-02-152
|
HAYS
|
AUSTIN
|
$23,384,139
|
IH 35
|
NH 2020(463)
|
04/08/2020
|
11/15/2023
|
FREEWAY OPERATIONAL IMPRVS
|
HUNTER INDUSTRIES, LTD.
($21,992,737)
|
|
|
0016-02-166
|
HAYS
|
AUSTIN
|
$1,947,067
|
IH 35
|
STP 2020(755)HES
|
04/09/2020
|
11/15/2023
|
INSTL SAFETY LIGHTING
|
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
($1,647,521)
|
|
|
3545-02-010
|
HAYS
|
AUSTIN
|
$7,098,810
|
FM 110
|
STP 2020(761)
|
04/09/2020
|
11/15/2023
|
CONSTRUCT OVERPASS
|
HUNTER INDUSTRIES, LTD.
($5,882,254)
|
|
|
6357-75-001
|
HEMPHILL
|
AMARILLO
|
$727,000
|
US0060
|
MMC - 635775001
|
04/08/2020
|
11/15/2023
|
D-GR HMA TY D PG 64-28 (MATERIALS ON...
|
L A FULLER & SONS CONSTRUCTION, LTD.
($772,400)
|
|
|
6355-15-001
|
HENDERSON
|
TYLER
|
$5,690,494
|
SH0031
|
MMC - 635515001
|
04/08/2020
|
11/15/2023
|
HERBICIDE AND INSECTICIDE ATHENS RDC...
|
NUTRIEN AG SOLUTIONS, INC.
($5,403,487)
|
|
|
6359-05-001
|
HENDERSON
|
TYLER
|
$52,800
|
SH0031
|
MMC - 635905001
|
04/09/2020
|
11/15/2023
|
HERBICIDE ADD. ATHENS RDC MATERIALS...
|
NATURCHEM, INC
($21,358)
|
|
|
3370-01-008
|
HOPKINS
|
PARIS
|
$4,444,626
|
FM 3389
|
C 3370-1-8
|
04/08/2020
|
11/15/2023
|
2R REHAB
|
D. L. LENNON INCORPORATED - CONTRACTOR
($3,763,142)
|
|
|
6359-74-001
|
HOPKINS
|
PARIS
|
$247,200
|
SH0011
|
MMC - 635974001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSIONS - MATERIALS ON...
|
ERGON ASPHALT & EMULSIONS, INC.
($226,150)
|
|
|
6361-14-001
|
HOPKINS
|
PARIS
|
$78,600
|
IH0030
|
RMC - 636114001
|
04/16/2020
|
11/15/2023
|
CLEANING AND SWEEPING HWYS
|
MORTON ENTERPRISE
($65,359)
|
|
|
0911-28-047
|
HOUSTON
|
LUFKIN
|
$2,090,203
|
CR
|
BR 1602(213)
|
04/08/2020
|
11/15/2023
|
BRIDGE REPL
|
STATELINE CONSTRUCTION, LLC
($1,895,914)
|
|
|
6358-59-001
|
HOWARD
|
ABILENE
|
$291,980
|
IH0020
|
MMC - 635859001
|
04/29/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($294,548)
|
|
|
6358-62-001
|
HOWARD
|
ABILENE
|
$283,612
|
IH0020
|
MMC - 635862001
|
04/16/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($329,035)
|
|
|
1495-01-009
|
HUNT
|
PARIS
|
$4,097,077
|
FM 1566
|
C 1495-1-9
|
04/09/2020
|
11/15/2023
|
2R REHAB
|
WE BUILD, INC.
($3,969,724)
|
|
|
6353-26-001
|
HUNT
|
PARIS
|
$98,283
|
FM0816
|
BPM - 635326001
|
04/16/2020
|
11/15/2023
|
BPM-EROSION REPAIR
|
BOEN LANDSCAPING & IRRIGATION, LLC
($92,220)
|
|
|
6359-70-001
|
HUNT
|
PARIS
|
$247,200
|
IH0030
|
MMC - 635970001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSIONS - MATERIALS ON...
|
ERGON ASPHALT & EMULSIONS, INC.
($226,150)
|
|
|
6359-20-001
|
IRION
|
SAN ANGELO
|
$226,183
|
US0067
|
RMC - 635920001
|
04/14/2020
|
11/15/2023
|
REPL OF SIGNS
|
HJC FARMS, INC.
($210,113)
|
|
|
6357-92-001
|
JOHNSON
|
FORT WORTH
|
$258,877
|
SH0174
|
RMC - 635792001
|
04/15/2020
|
11/15/2023
|
CLEANING AND RESHAPING DITCHES
|
TEXAS DRAINAGE INC.
($177,767)
|
|
|
6358-11-001
|
JONES
|
ABILENE
|
$285,605
|
US0180
|
MMC - 635811001
|
04/29/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($285,700)
|
|
|
1552-01-011
|
KARNES
|
CORPUS CHRISTI
|
$1,940,400
|
FM 1020
|
BR 2020(776)
|
04/09/2020
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
VECTOR UTILITIES LLC
($1,717,294)
|
|
|
6357-98-001
|
KAUFMAN
|
DALLAS
|
$4,433,114
|
US0175
|
RMC - 635798001
|
04/08/2020
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
TEXAS MATERIALS GROUP, INC.
($3,633,670)
|
|
|
6358-97-001
|
KENDALL
|
SAN ANTONIO
|
$284,520
|
IH0010
|
MMC - 635897001
|
04/14/2020
|
11/15/2023
|
MATERIAL ONLY DELIVERY OF EMULSION
|
ERGON ASPHALT & EMULSIONS, INC.
($255,420)
|
|
|
6358-69-001
|
KENT
|
ABILENE
|
$133,302
|
US0380
|
MMC - 635869001
|
04/29/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($148,750)
|
|
|
6358-70-001
|
KENT
|
ABILENE
|
$196,374
|
US0380
|
MMC - 635870001
|
04/20/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($215,528)
|
|
|
6360-86-001
|
KENT
|
ABILENE
|
$176,058
|
US0380
|
RMC - 636086001
|
04/14/2020
|
11/15/2023
|
MOW HWY RIGHT OF WAY
|
KENNETH THOMASON
($141,819)
|
|
|
6352-21-001
|
KERR
|
SAN ANTONIO
|
$181,176
|
SH0027
|
BPM - 635221001
|
04/15/2020
|
11/15/2023
|
BRIDGE PM PROJECT
|
RELMCO, INC.
($126,013)
|
|
|
0133-01-052
|
KING
|
CHILDRESS
|
$1,385,813
|
US 82
|
NH 2020(735)
|
04/08/2020
|
11/15/2023
|
REALIGNMENT, HOTMIX, STRIPING, SIGNI...
|
A. L. HELMCAMP, INC.
($1,641,062)
|
|
|
6359-72-001
|
LAMAR
|
PARIS
|
$247,200
|
BU0271B
|
MMC - 635972001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSIONS - MATERIALS ON...
|
ERGON ASPHALT & EMULSIONS, INC.
($226,150)
|
|
|
6355-99-001
|
LAMB
|
LUBBOCK
|
$50,000
|
US0084
|
MMC - 635599001
|
04/23/2020
|
11/15/2023
|
PURCHASE OF MATERIALS LRA_(MATERIALS...
|
VULCAN CONSTRUCTION MATERIALS, LLC
($56,345)
|
|
|
0251-04-026
|
LAMPASAS
|
BROWNWOOD
|
$790,994
|
US 281
|
STP 2020(765)HES
|
04/08/2020
|
11/15/2023
|
IMPROVE GUARDRAIL & SAFETY TREAT FIX...
|
ODUM SERVICES, LLC
($788,695)
|
|
|
0593-01-122
|
LIBERTY
|
BEAUMONT
|
$1,123,194
|
SH 321
|
STP 2020(782)HES
|
04/08/2020
|
11/15/2023
|
SFT-SAFETY IMPRV PROJECTS
|
NORMAN HIGHWAY CONSTRUCTORS, INC.
($1,074,621)
|
|
|
1819-01-015
|
LIPSCOMB
|
AMARILLO
|
$15,835,525
|
FM 1920
|
SSW 1819-1-15
|
04/09/2020
|
11/15/2023
|
ADDITIONAL PAVED SURF WIDTH
|
J. LEE MILLIGAN, INC.
($16,356,130)
|
|
|
0052-07-071
|
LUBBOCK
|
LUBBOCK
|
$7,108,870
|
US 84
|
NH 2020(749)
|
04/09/2020
|
11/15/2023
|
INSTL CABLE BARRIERS IN MEDIANS
|
SCR CIVIL CONSTRUCTION, LLC
($6,065,950)
|
|
|
0053-01-126
|
LUBBOCK
|
LUBBOCK
|
$2,126,196
|
US 84
|
STP 2020(867)HES
|
04/09/2020
|
11/15/2023
|
INSTL MEDIAN BARRIER
|
MASSANA CONSTRUCTION INC.
($1,940,614)
|
|
|
0905-00-081
|
LUBBOCK
|
LUBBOCK
|
$1,988,313
|
VA
|
STP 2020(750)
|
04/08/2020
|
11/15/2023
|
TRAF SMALL SIGN INSTL
|
L&L COMPANY
($1,723,006)
|
|
|
6356-00-001
|
LUBBOCK
|
LUBBOCK
|
$115,000
|
IH0027
|
MMC - 635600001
|
04/23/2020
|
11/15/2023
|
PURCHASE OF MATERIALS LRA
|
VULCAN CONSTRUCTION MATERIALS, LLC
($122,695)
|
|
|
6358-67-001
|
MARION
|
ATLANTA
|
$273,000
|
US0059
|
MMC - 635867001
|
04/23/2020
|
11/15/2023
|
MATERIALS ONLY EMULSION
|
ERGON ASPHALT & EMULSIONS, INC.
($190,700)
|
|
|
2506-01-042
|
MCLENNAN
|
WACO
|
$707,722
|
FM 1695
|
STP 2020(743)
|
04/09/2020
|
11/15/2023
|
CONSTRUCTION OF PEDESTRIAN, SIDEWALK...
|
TI-ZACK CONCRETE, INC.
($862,612)
|
|
|
6357-29-001
|
MCLENNAN
|
WACO
|
$258,390
|
US0077
|
RMC - 635729001
|
04/09/2020
|
11/15/2023
|
NON-SITE SPEC SPALL & FULL DEPTH REP...
|
CROSS PLUS CONSTRUCTION, LLC
($221,600)
|
|
|
6360-76-001
|
MIDLAND
|
ODESSA
|
$230,000
|
IH0020
|
MMC - 636076001
|
04/28/2020
|
11/15/2023
|
LIMESTONE ROCK ASPH (MATERIALS ONLY)
|
MARTIN MARIETTA MATERIALS, INC.
($209,750)
|
|
|
6361-23-001
|
MIDLAND
|
ODESSA
|
$255,000
|
IH0020
|
MMC - 636123001
|
04/28/2020
|
11/15/2023
|
DENSE-GRADED HOT-MIX(SQ)(MATERIALS O...
|
RK HALL, LLC
($237,000)
|
|
|
6360-73-001
|
MILAM
|
BRYAN
|
$280,000
|
US0079
|
MMC - 636073001
|
04/14/2020
|
11/15/2023
|
DENSE-GRADED HOT-MIX ASPH(MATERIAL O...
|
BIG CREEK CONSTRUCTION, LTD.
($234,000)
|
|
|
6358-43-001
|
MITCHELL
|
ABILENE
|
$294,875
|
IH0020
|
MMC - 635843001
|
04/20/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($319,445)
|
|
|
6358-44-001
|
MITCHELL
|
ABILENE
|
$121,500
|
IH0020
|
MMC - 635844001
|
04/16/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($129,525)
|
|
|
6360-83-001
|
MITCHELL
|
ABILENE
|
$239,443
|
IH0020
|
RMC - 636083001
|
04/14/2020
|
11/15/2023
|
MOW HWY RIGHT OF WAY
|
ABESCAPE LANDSCAPING, LLC
($242,182)
|
|
|
6357-83-001
|
MONTAGUE
|
WICHITA FALLS
|
$233,250
|
US0082
|
MMC - 635783001
|
04/23/2020
|
11/15/2023
|
HOT MIX (MATERIALS ONLY)
|
AUSTIN ASPHALT, INC.
($204,165)
|
|
|
0675-08-111
|
MONTGOMERY
|
HOUSTON
|
$2,365,922
|
IH 45
|
NH 2020(596)
|
04/09/2020
|
11/15/2023
|
INSTL ITS EQUIPMENT AND INFRASTRUCT
|
SICE, INC.
($2,147,331)
|
|
|
0092-06-107
|
NAVARRO
|
DALLAS
|
$1,035,270
|
IH 45
|
NH 2020(715)
|
04/09/2020
|
11/15/2023
|
FULL DEPTH CONC REPAR
|
ROY JORGENSEN ASSOCIATES, INC.
($1,129,501)
|
|
|
6333-10-001
|
NAVARRO
|
DALLAS
|
$150,485
|
SH0031
|
BPM - 633310001
|
04/14/2020
|
11/15/2023
|
BPM - BRIDGE REPAIR
|
DBI SERVICES, LLC
($159,600)
|
|
|
6354-61-001
|
NAVARRO
|
DALLAS
|
$1,169,093
|
FM1603
|
RMC - 635461001
|
04/08/2020
|
11/15/2023
|
FLEXIBLE PAVMT STRUCT REPAIR
|
RAYFORD'S TRUCK & TRACTOR
($1,009,303)
|
|
|
0916-00-091
|
NUECES
|
CORPUS CHRISTI
|
$1,258,697
|
VA
|
STP 2020(775)
|
04/08/2020
|
11/15/2023
|
INSTL AND REPLACE SIGNS
|
HIGHWAY BARRICADES AND SERVICES, LLC
($885,744)
|
|
|
6354-74-001
|
NUECES
|
CORPUS CHRISTI
|
$1,247,000
|
SH0361
|
RMC - 635474001
|
04/08/2020
|
11/15/2023
|
FERRY LANDING GRATING PANEL SYSTEM
|
TEXAS GULF CONSTRUCTION COMPANY, INC.
($400,545)
|
|
|
0090-02-053
|
OLDHAM
|
AMARILLO
|
$4,469,165
|
IH 40
|
STP 2020(777)HES
|
04/08/2020
|
11/15/2023
|
IMPROVE GUARDRAIL TO DESIGN STANDARD...
|
HJC FARMS, INC.
($3,945,747)
|
|
|
1286-01-018
|
ORANGE
|
BEAUMONT
|
$691,343
|
FM 1078
|
STP 2020(784)HES
|
04/09/2020
|
11/15/2023
|
SAFETY IMPRV PROJECT
|
NORMAN HIGHWAY CONSTRUCTORS, INC.
($697,979)
|
|
|
6358-22-001
|
PECOS
|
ODESSA
|
$495,906
|
IH0010
|
RMC - 635822001
|
04/09/2020
|
11/15/2023
|
STREET SWEEPING
|
PAVEMENT PARTNERS, LLC
($395,870)
|
|
|
6360-25-001
|
PECOS
|
ODESSA
|
$616,000
|
IH0010
|
RMC - 636025001
|
04/09/2020
|
11/15/2023
|
BRIDGE REPAIR (CALLOUT)
|
RELMCO, INC.
($429,900)
|
|
|
6360-77-001
|
PECOS
|
ODESSA
|
$99,000
|
IH0010
|
MMC - 636077001
|
04/28/2020
|
11/15/2023
|
LIMESTONE ROCK ASPH (MATERIALS ONLY)
|
MARTIN MARIETTA MATERIALS, INC.
($80,790)
|
|
|
6356-22-001
|
POTTER
|
AMARILLO
|
$5,570,776
|
IH0040
|
MMC - 635622001
|
04/08/2020
|
11/15/2023
|
ASPH OILS & EMULSIONS (MATERIAL ONLY...
|
WRIGHT ASPHALT PRODUCTS COMPANY LLC
($4,970,378)
|
|
|
0924-07-017
|
PRESIDIO
|
EL PASO
|
$470,999
|
CS
|
STP 2020(072)TP
|
04/09/2020
|
11/15/2023
|
CONSTRUCTION OF SHARED USE PATH AND...
|
DAN WILLIAMS COMPANY
($531,477)
|
|
|
6359-69-001
|
RAINS
|
PARIS
|
$247,200
|
US0069
|
MMC - 635969001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSIONS - MATERIALS ON...
|
ERGON ASPHALT & EMULSIONS, INC.
($226,150)
|
|
|
6359-67-001
|
RED RIVER
|
PARIS
|
$247,200
|
US0082
|
MMC - 635967001
|
04/16/2020
|
11/15/2023
|
ASPH, OIL & EMULSION - MATERIALS ONL...
|
ERGON ASPHALT & EMULSIONS, INC.
($226,150)
|
|
|
2451-03-017
|
REEVES
|
ODESSA
|
$19,019,375
|
RM 652
|
STP 2020(752)
|
04/08/2020
|
11/15/2023
|
ROADWAY REHAB
|
CI CONSTRUCTORS, INC.
($20,145,623)
|
|
|
0371-03-131
|
REFUGIO
|
CORPUS CHRISTI
|
$785,756
|
US 77
|
STP 2020(774)HES
|
04/09/2020
|
11/15/2023
|
INSTLING MEDIAN CABLE BARRIER
|
VECTOR UTILITIES LLC
($701,475)
|
|
|
6357-49-001
|
RUNNELS
|
SAN ANGELO
|
$289,071
|
US0083
|
MMC - 635749001
|
04/22/2020
|
11/15/2023
|
PURCHASE OF LIMESTONE ROCK ASPH (LRA...
|
VULCAN CONSTRUCTION MATERIALS, LLC
($305,770)
|
|
|
6358-50-001
|
SCURRY
|
ABILENE
|
$124,046
|
US0084
|
MMC - 635850001
|
04/16/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($124,665)
|
|
|
6360-84-001
|
SCURRY
|
ABILENE
|
$241,017
|
US0084
|
RMC - 636084001
|
04/14/2020
|
11/15/2023
|
MOW HWY RIGHT OF WAY
|
KENNETH THOMASON
($190,442)
|
|
|
6360-87-001
|
SHACKELFORD
|
ABILENE
|
$154,071
|
US0180
|
RMC - 636087001
|
04/14/2020
|
11/15/2023
|
MOW HWY RIGHT OF WAY
|
GREG SCRUGGS
($153,530)
|
|
|
0191-01-092
|
SMITH
|
TYLER
|
$2,825,315
|
US 69
|
NH 2020(705)
|
04/08/2020
|
11/15/2023
|
REPAIR AND RESURF ROADWAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($2,060,600)
|
|
|
0492-04-039
|
SMITH
|
TYLER
|
$203,802
|
FM 346
|
STP 2020(706)
|
04/08/2020
|
11/15/2023
|
INSTL TRAF SIGNAL
|
STRIPING TECHNOLOGY, L.P.
($200,525)
|
|
|
0495-04-070
|
SMITH
|
TYLER
|
$2,434,559
|
IH 20
|
NH 2020(707)
|
04/09/2020
|
11/15/2023
|
TBPFC SURF, ACP SURF, PLANING, SHLDR...
|
TEXAS MATERIALS GROUP, INC.
($3,079,236)
|
|
|
6355-74-001
|
SMITH
|
TYLER
|
$30,000
|
US0069
|
MMC - 635574001
|
04/07/2020
|
11/15/2023
|
CONC_MATERIALS ONLY
|
849 RED BARON SUPPLY COMPANY, LLC
($31,820)
|
|
|
6358-54-001
|
STONEWALL
|
ABILENE
|
$146,921
|
US0380
|
MMC - 635854001
|
04/20/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($149,562)
|
|
|
6358-55-001
|
STONEWALL
|
ABILENE
|
$140,110
|
US0380
|
MMC - 635855001
|
04/29/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($141,975)
|
|
|
6357-69-001
|
SUTTON
|
SAN ANGELO
|
$220,586
|
US0277
|
MMC - 635769001
|
04/22/2020
|
11/15/2023
|
LRA (MATERIAL ONLY)
|
VULCAN CONSTRUCTION MATERIALS, LLC
($223,906)
|
|
|
0008-16-042
|
TARRANT
|
FORT WORTH
|
$24,136,520
|
IH 20
|
NH 1902(222)
|
04/09/2020
|
11/15/2023
|
CONSTRUCT NEW ROADWAY LANES
|
RAGLE CONSTRUCTION, INC.
($20,961,182)
|
|
|
0747-04-076
|
TARRANT
|
FORT WORTH
|
$3,971,218
|
FM 157
|
NH 2020(721)
|
04/08/2020
|
11/15/2023
|
RESURF ROADWAY
|
AUSTIN BRIDGE & ROAD SERVICES, LP
($3,418,267)
|
|
|
6358-05-001
|
TAYLOR
|
ABILENE
|
$106,980
|
IH0020
|
MMC - 635805001
|
04/16/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($106,170)
|
|
|
6358-08-001
|
TAYLOR
|
ABILENE
|
$294,480
|
IH0020
|
MMC - 635808001
|
04/20/2020
|
11/15/2023
|
MATERIALS ONLY
|
VULCAN CONSTRUCTION MATERIALS, LLC
($323,080)
|
|
|
6360-81-001
|
TAYLOR
|
ABILENE
|
$310,042
|
IH0020
|
RMC - 636081001
|
04/08/2020
|
11/15/2023
|
MOW HWY RIGHT OF WAY
|
ABESCAPE LANDSCAPING, LLC
($394,082)
|
|
|
6355-98-001
|
TERRY
|
LUBBOCK
|
$285,000
|
US0062
|
MMC - 635598001
|
04/23/2020
|
11/15/2023
|
PURCHASE OF MATERIALS LRA_(MATERIALS...
|
MARTIN MARIETTA MATERIALS, INC.
($285,391)
|
|
|
6357-14-001
|
TERRY
|
LUBBOCK
|
$293,680
|
US0062
|
RMC - 635714001
|
04/08/2020
|
11/15/2023
|
ROADSIDE MOW
|
BERT WHITAKER
($264,600)
|
|
|
6357-84-001
|
THROCKMORTON
|
WICHITA FALLS
|
$81,975
|
US0183
|
MMC - 635784001
|
04/23/2020
|
11/15/2023
|
HOT MIX (MATERIALS ONLY)
|
ZACK BURKETT CO.
($80,985)
|
|
|
6357-10-001
|
TITUS
|
ATLANTA
|
$589,775
|
US0271
|
RMC - 635710001
|
04/08/2020
|
11/15/2023
|
CALLOUT MBGF REPAIR - WEST
|
CATOCON, INC.
($713,880)
|
|
|
0015-10-063
|
TRAVIS
|
AUSTIN
|
$8,794,190
|
IH 35
|
NH 2020(754)
|
04/09/2020
|
11/15/2023
|
REVERSE NB RAMPS & ADD 1 AUXILIARY L...
|
JORDAN FOSTER CONSTRUCTION, LLC
($8,674,931)
|
|
|
0151-06-149
|
TRAVIS
|
AUSTIN
|
$3,963,719
|
US 183
|
NH 2020(757)
|
04/08/2020
|
11/15/2023
|
OPERATIONAL IMPRVS
|
GIBSON & ASSOCIATES, INC.
($5,815,911)
|
|
|
0683-02-080
|
TRAVIS
|
AUSTIN
|
$504,639
|
RM 620
|
NH 2020(760)
|
04/08/2020
|
11/15/2023
|
INSTL RAISED CONC MEDIAN
|
AARON CONCRETE CONTRACTORS, L.P.
($378,218)
|
|
|
0703-01-067
|
TYLER
|
BEAUMONT
|
$6,383,381
|
FM 92
|
STP 2020(783)
|
04/09/2020
|
11/15/2023
|
OV- OVERLAY
|
DREWERY CONSTRUCTION COMPANY, INCORPORATED
($7,554,649)
|
|
|
6360-27-001
|
UPTON
|
ODESSA
|
$202,540
|
US0385
|
RMC - 636027001
|
04/28/2020
|
11/15/2023
|
ROADSIDE MOW
|
DOUBLE A CONTRACTING, L.P.
($166,940)
|
|
|
6349-48-001
|
UVALDE
|
SAN ANTONIO
|
$56,768
|
US0090
|
BPM - 634948001
|
04/15/2020
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
RELMCO, INC.
($48,430)
|
|
|
6349-51-001
|
UVALDE
|
SAN ANTONIO
|
$68,563
|
US0083
|
BPM - 634951001
|
04/15/2020
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
RELMCO, INC.
($57,640)
|
|
|
6356-23-001
|
VICTORIA
|
YOAKUM
|
$209,138
|
US0059
|
MMC - 635623001
|
04/20/2020
|
11/15/2023
|
HYDRAULIC CEMENT (MATERIAL ONLY)
|
AKA-MATERIALS
($231,529)
|
|
|
6353-87-001
|
WALKER
|
BRYAN
|
$299,888
|
SH0075
|
RMC - 635387001
|
04/01/2020
|
11/15/2023
|
SH 75 TOM OVERLAY, WIDENING, RESTRIP
|
KNIFE RIVER CORPORATION - SOUTH
($372,662)
|
|
|
0543-01-066
|
WALLER
|
HOUSTON
|
$78,197
|
FM 359
|
STP 2020(696)HES
|
04/09/2020
|
11/15/2023
|
INSTL LED FLASHING CHEVRONS (CURVE)
|
SYNERGY SIGNS & SERVICES LLC
($48,725)
|
|
|
6358-64-001
|
WALLER
|
HOUSTON
|
$111,062
|
US0290
|
RMC - 635864001
|
04/14/2020
|
11/15/2023
|
REFL PAVMT MRK (GRAPHICS)
|
SEMPER STRIPING LLC
($95,578)
|
|
|
0043-09-142
|
WICHITA
|
WICHITA FALLS
|
$889,187
|
US 287
|
C 43-9-142
|
04/08/2020
|
11/15/2023
|
UPGRADE BRIDGE AND APPROACH RAILING
|
HJC FARMS, INC.
($948,264)
|
|
|
6357-85-001
|
WICHITA
|
WICHITA FALLS
|
$200,100
|
US0287
|
MMC - 635785001
|
04/07/2020
|
11/15/2023
|
HOT MIX (MATERIALS ONLY)
|
AUSTIN ASPHALT, INC.
($206,796)
|
|
|
6359-95-001
|
WICHITA
|
WICHITA FALLS
|
$269,754
|
US0287
|
RMC - 635995001
|
04/07/2020
|
11/15/2023
|
RAISED PAVMT MARKER REPL
|
BRYDL CONTRACTING, INC.
($229,159)
|
|
|
6357-86-001
|
WILBARGER
|
WICHITA FALLS
|
$120,600
|
US0287
|
MMC - 635786001
|
04/23/2020
|
11/15/2023
|
HOT MIX (MATERIALS ONLY)
|
APAC-CENTRAL, INC.
($128,710)
|
|
|
0015-09-177
|
WILLIAMSON
|
AUSTIN
|
$846,980
|
IH 35
|
BR 2020(843)
|
04/08/2020
|
11/15/2023
|
UPGRADE BRIDGE AND APPROACH RAILING,...
|
FUQUA CONSTRUCTION CO., INC.
($939,069)
|
|
|
0204-02-033
|
WILLIAMSON
|
AUSTIN
|
$786,461
|
US 79
|
STP 2020(758)HES
|
04/08/2020
|
11/15/2023
|
INSTL INTERS FLASHING BEACON, ETC.
|
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
($874,837)
|
|
|
6354-67-001
|
WILLIAMSON
|
AUSTIN
|
$1,375,650
|
US0183
|
RMC - 635467001
|
04/09/2020
|
11/15/2023
|
WATER QUALITY POND CLEANING
|
FUQUA CONSTRUCTION CO., INC.
($1,284,132)
|
|
|
6349-50-001
|
WILSON
|
SAN ANTONIO
|
$420,107
|
US0087
|
BPM - 634950001
|
04/08/2020
|
11/15/2023
|
BRIDGE PREVENT MAINT_EROSION CONTROL
|
ACME BRIDGE COMPANY, INC.
($370,338)
|
|
|
6349-69-001
|
WOOD
|
TYLER
|
$54,160
|
SL0564
|
RMC - 634969001
|
04/07/2020
|
11/15/2023
|
LAWN MAINT
|
HX FARMS, INC.
($76,000)
|
|
|
6357-87-001
|
YOUNG
|
WICHITA FALLS
|
$177,250
|
US0380
|
MMC - 635787001
|
04/23/2020
|
11/15/2023
|
HOT MIX (MATERIALS ONLY)
|
AUSTIN ASPHALT, INC.
($175,550)
|