6335-42-001
|
COOKE
|
WICHITA FALLS
|
$745,986
|
US0082
|
BPM - 633542001
|
10/03/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
L.C. JORDAN & SON
($661,892)
|
|
|
0586-01-067
|
BRAZORIA
|
HOUSTON
|
$455,071
|
SH 332
|
C 586-1-67
|
10/02/2018
|
11/15/2023
|
REMOVE AND REPLACE EXIST DRAINAGE ST...
|
EARTH BUILDERS, L.P.
($433,601)
|
|
|
6329-68-001
|
CLAY
|
WICHITA FALLS
|
$510,667
|
FM0175
|
RMC - 632968001
|
10/02/2018
|
11/15/2023
|
CULVERT REPAIR
|
COPPELL CONSTRUCTION CO., INC.
($579,763)
|
|
|
6330-12-001
|
POLK
|
LUFKIN
|
$67,630
|
FM0942
|
BPM - 633012001
|
09/26/2018
|
11/15/2023
|
DISASTER RELIEF MAINT
|
L.C. JORDAN & SON
($58,124)
|
|
|
6335-47-001
|
RAINS
|
PARIS
|
$173,331
|
FM0275
|
RMC - 633547001
|
09/20/2018
|
11/15/2023
|
CROSS DRAINAGE STRUCT REPAIR
|
HIGHWAY 19 CONSTRUCTION LLC
($165,494)
|
|
|
6327-80-001
|
SAN JACINTO
|
LUFKIN
|
$272,699
|
US0059
|
RMC - 632780001
|
09/12/2018
|
11/15/2023
|
FHWA
|
L.C. JORDAN & SON
($259,685)
|
|
|
6328-76-001
|
BRAZORIA
|
HOUSTON
|
$280,039
|
SH0288
|
BPM - 632876001
|
09/11/2018
|
11/15/2023
|
BRIDGE REPAIR
|
TEXCON GENERAL CONTRACTORS
($242,320)
|
|
|
6327-34-001
|
COMANCHE
|
BROWNWOOD
|
$677,155
|
SH0006
|
BPM - 632734001
|
09/07/2018
|
11/15/2023
|
MISCELLANEOUS BRIDGE REPAIRS
|
BECK-REIT & SONS, LTD.
($498,038)
|
|
|
6330-81-001
|
JASPER
|
BEAUMONT
|
$297,780
|
US0096
|
BPM - 633081001
|
09/07/2018
|
11/15/2023
|
US 96 ETC., EROSION & SCOUR REPAIR
|
L.C. JORDAN & SON
($296,106)
|
|
|
0008-13-239
|
TARRANT
|
FORT WORTH
|
$718,151
|
IH 820
|
C 8-13-239
|
09/06/2018
|
11/15/2023
|
RIPRAP SLOPE REPAIR
|
ED BELL CONSTRUCTION COMPANY
($655,000)
|
|
|
6333-52-001
|
WICHITA
|
WICHITA FALLS
|
$91,810
|
US0287
|
RMC - 633352001
|
08/22/2018
|
11/15/2023
|
BRIDGE RAIL REPAIR
|
DRS CONSTRUCTION, INC.
($92,400)
|
|
|
0909-38-078
|
FALLS
|
WACO
|
$249,884
|
CS
|
BR 2017(203)
|
08/08/2018
|
11/15/2023
|
REPL BR & APPRS
|
KNIFE RIVER CORPORATION - SOUTH
($279,404)
|
|
|
0920-03-034
|
HARDIN
|
BEAUMONT
|
$710,136
|
CR
|
BR 93(356)
|
08/08/2018
|
11/15/2023
|
REPLACE BRIDGE
|
STATELINE CONSTRUCTION, LLC
($586,642)
|
|
|
0176-03-131
|
ANGELINA
|
LUFKIN
|
$1,671,568
|
US 59
|
STP 1802(326)HES
|
07/11/2018
|
11/15/2023
|
IMPROVE GUARDRAIL TO DES STANDARDS
|
B & E CONSTRUCTION INC
($1,620,249)
|
|
|
0893-01-034
|
NACOGDOCHES
|
LUFKIN
|
$1,077,944
|
FM 226
|
STP 2018(812)HES
|
05/02/2018
|
11/15/2023
|
IMPROVE GUARDRAIL AND SAFETY TREAT
|
A R BROTHERS CONSTRUCTION SERVICES, INC.
($1,084,003)
|
|
|
0928-02-020
|
POLK
|
LUFKIN
|
$1,788,894
|
FM 350
|
STP 2018(813)HES
|
05/02/2018
|
11/15/2023
|
IMPROVE GUARDRAIL TO DESIGN STAND
|
L.C. JORDAN & SON
($1,889,218)
|
|
|
0109-06-040
|
HOUSTON
|
LUFKIN
|
$885,656
|
SH 19
|
STP 2018(810)HES
|
05/01/2018
|
11/15/2023
|
IMPROVE GUARDRAIL TO DES. STANDARD
|
A R BROTHERS CONSTRUCTION SERVICES, INC.
($877,760)
|
|
|
0675-01-070
|
FREESTONE
|
BRYAN
|
$3,544,017
|
IH 45
|
STP 2018(751)HES
|
04/03/2018
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
L.C. JORDAN & SON
($3,593,926)
|
|
|
0813-01-101
|
LIBERTY
|
BEAUMONT
|
$638,519
|
FM 787
|
STP 2018(756)HES
|
04/03/2018
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
L.C. JORDAN & SON
($539,803)
|
|
|
2013-01-012
|
BROWN
|
BROWNWOOD
|
$1,223,957
|
FM 2125
|
STP 2018(768)HES
|
04/03/2018
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
L.C. JORDAN & SON
($1,024,337)
|
|
|
6326-09-001
|
GRAYSON
|
PARIS
|
$100,710
|
US0082
|
BPM - 632609001
|
03/22/2018
|
11/15/2023
|
BPM-ABUTMENT EROSION REPAIR
|
HARTBEAT CONSTRUCTION
($95,594)
|
|
|
0908-00-085
|
TAYLOR
|
ABILENE
|
$504,145
|
VA
|
NH 2018(587)
|
03/07/2018
|
11/15/2023
|
BRIDGE REPAIR
|
AW&E CONSTRUCTION LLC
($258,870)
|
|
|
6328-47-001
|
ECTOR
|
ODESSA
|
$521,375
|
IH0020
|
RMC - 632847001
|
03/07/2018
|
11/15/2023
|
BRIDGE REPAIR CALL OUT
|
SCR CIVIL CONSTRUCTION, LLC
($453,300)
|
|
|
0831-02-020
|
LIMESTONE
|
WACO
|
$729,363
|
FM 342
|
STP 2018(591)HES
|
03/06/2018
|
11/15/2023
|
SFTY TR FX OBJS
|
BEAR CREEK CONTRACTING, LLC
($698,267)
|
|
|
6326-86-001
|
BELL
|
WACO
|
$144,419
|
US0190
|
RMC - 632686001
|
02/13/2018
|
11/15/2023
|
BRIDGE AND CULVERT REPAIRS
|
CROSS PLUS CONSTRUCTION, LLC
($162,978)
|
|
|
6318-11-001
|
ANDERSON
|
TYLER
|
$146,502
|
SH0019
|
BPM - 631811001
|
02/06/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
L.C. JORDAN & SON
($129,538)
|
|
|
6318-12-001
|
GREGG
|
TYLER
|
$262,080
|
SH0042
|
BPM - 631812001
|
02/06/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
CHAMPION INFRASTRUCTURE, LLC
($210,592)
|
|
|
6318-13-001
|
GREGG
|
TYLER
|
$196,635
|
US0259
|
BPM - 631813001
|
02/06/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
RED BARON BUILDING COMPANY, L.L.C.
($167,860)
|
|
|
6326-87-001
|
ANDERSON
|
TYLER
|
$226,575
|
US0287
|
RMC - 632687001
|
02/06/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
RED BARON BUILDING COMPANY, L.L.C.
($232,133)
|
|
|
6312-37-001
|
SCURRY
|
ABILENE
|
$400,297
|
US0084
|
BPM - 631237001
|
02/01/2018
|
11/15/2023
|
MISCELLANEOUS BRIDGE REPAIR
|
SCR CIVIL CONSTRUCTION, LLC
($343,510)
|
|
|
6324-94-001
|
MCLENNAN
|
WACO
|
$737,952
|
US0084
|
RMC - 632494001
|
02/01/2018
|
11/15/2023
|
MISCELLANEOUS CONC REPAIRS
|
DBI SERVICES, LLC
($648,174)
|
|
|
6322-97-001
|
TRINITY
|
LUFKIN
|
$92,860
|
SH0019
|
RMC - 632297001
|
01/24/2018
|
11/15/2023
|
CULVERT CLEANING AND REPL
|
L.C. JORDAN & SON
($134,140)
|
|
|
6324-32-001
|
ANGELINA
|
LUFKIN
|
$197,169
|
US0059
|
BPM - 632432001
|
01/10/2018
|
11/15/2023
|
BRIDGE AND SCOUR REPAIRS
|
L.C. JORDAN & SON
($219,453)
|
|
|
6325-86-001
|
WILLIAMSON
|
AUSTIN
|
$165,281
|
FM0970
|
BPM - 632586001
|
01/09/2018
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
RESTEK, INC.
($169,160)
|
|
|
6318-91-001
|
MAVERICK
|
LAREDO
|
$297,801
|
US0277
|
BPM - 631891001
|
12/18/2017
|
11/15/2023
|
REHAB OF VARIOUS BRIDGE FACILIT
|
DELGADO'S CONTRACTORS, LLC
($385,594)
|
|
|
6319-00-001
|
DIMMIT
|
LAREDO
|
$131,226
|
SH0085
|
BPM - 631900001
|
12/18/2017
|
11/15/2023
|
REHABILITAION OF VARIOUS BRIDGE FACI...
|
L.C. JORDAN & SON
($222,330)
|
|
|
0043-05-107
|
WILBARGER
|
WICHITA FALLS
|
$2,278,333
|
US 287
|
BR 2018(349)
|
12/05/2017
|
11/15/2023
|
DECK AND CONC STRUCT REPAIR
|
GIBSON & ASSOCIATES, INC.
($1,842,668)
|
|
|
0055-06-033
|
CORYELL
|
WACO
|
$369,124
|
US 84
|
BR 2018(345)
|
12/05/2017
|
11/15/2023
|
BRIDGE MAINT
|
ELLIS-MCGINNIS CONSTRUCTION CO.
($277,779)
|
|
|
1202-03-014
|
WILLIAMSON
|
AUSTIN
|
$1,241,553
|
FM 1063
|
STP 2018(470)HES
|
12/05/2017
|
11/15/2023
|
UPGRADE MBGF AND SAFETY TREAT FIXED...
|
RELMCO, INC.
($1,248,579)
|
|
|
6318-51-001
|
CALDWELL
|
AUSTIN
|
$269,950
|
SH0080
|
BPM - 631851001
|
11/14/2017
|
11/15/2023
|
BRIDGE REPAIRS
|
MAIN LANE INDUSTRIES LTD.
($251,000)
|
|
|
6315-32-001
|
JASPER
|
BEAUMONT
|
$228,180
|
US0096
|
BPM - 631532001
|
11/08/2017
|
11/15/2023
|
RIPRAP/SPALL REPAIR
|
DEZTEX INDUSTRIAL SERVICES, LLC
($193,184)
|
|
|
0231-04-056
|
BELL
|
WACO
|
$1,064,589
|
US 190
|
STP 2018(251)HES
|
11/03/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
BEAR CREEK CONTRACTING, LLC
($1,063,872)
|
|
|
6320-20-001
|
WICHITA
|
WICHITA FALLS
|
$582,635
|
FM0368
|
RMC - 632020001
|
11/03/2017
|
11/15/2023
|
EROSION/DRAINAGE REPAIR
|
STATELINE CONSTRUCTION, LLC
($578,952)
|
|
|
0114-07-080
|
LEE
|
AUSTIN
|
$872,756
|
US 290
|
BR 2018(271)
|
11/02/2017
|
11/15/2023
|
BRIDGE REHAB
|
DAN WILLIAMS COMPANY
($844,010)
|
|
|
0257-01-047
|
STEPHENS
|
BROWNWOOD
|
$300,470
|
US 183
|
STP 2018(244)
|
11/02/2017
|
11/15/2023
|
DRAINAGE IMPRVS
|
REECE CONSTRUCTION CO., INC.
($223,074)
|
|
|
6323-05-001
|
CORYELL
|
WACO
|
$360,938
|
US0084
|
BPM - 632305001
|
11/02/2017
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
BECK-REIT & SONS, LTD.
($318,825)
|
|
|
6309-30-001
|
ANGELINA
|
LUFKIN
|
$244,982
|
US0059
|
RMC - 630930001
|
10/11/2017
|
11/15/2023
|
DITCH AND CULVERT CLEANING
|
TEXAS DRAINAGE INC.
($170,302)
|
|
|
0150-02-039
|
LLANO
|
AUSTIN
|
$865,905
|
SH 29
|
BR 2018(073)
|
10/04/2017
|
11/15/2023
|
BRIDGE REHAB & EROSION REPAIR
|
RESTEK, INC.
($890,245)
|
|
|
1096-01-061
|
HARDIN
|
BEAUMONT
|
$261,913
|
FM 770
|
STP 2018(240)HES
|
10/04/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
NORMAN HIGHWAY CONSTRUCTORS, INC.
($228,356)
|
|
|
0923-22-021
|
STEPHENS
|
BROWNWOOD
|
$802,572
|
CR
|
BR 2018(217)
|
10/03/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($676,267)
|
|
|
6298-16-001
|
VAN ZANDT
|
TYLER
|
$493,455
|
FM0047
|
RMC - 629816001
|
10/03/2017
|
11/15/2023
|
CULVERT REPAIR
|
RED BARON BUILDING COMPANY, L.L.C.
($430,297)
|
|
|
0035-04-035
|
CONCHO
|
SAN ANGELO
|
$1,571,643
|
US 83
|
STP 2018(066)HES
|
09/07/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
L.C. JORDAN & SON
($1,472,270)
|
|
|
6318-66-001
|
FREESTONE
|
BRYAN
|
$256,075
|
US0084
|
RMC - 631866001
|
08/15/2017
|
11/15/2023
|
REMOVE AND REPLACE CROSS DRAINAGE
|
BECK-REIT & SONS, LTD.
($233,742)
|
|
|
6319-87-001
|
GILLESPIE
|
AUSTIN
|
$101,274
|
US0087
|
BPM - 631987001
|
08/15/2017
|
11/15/2023
|
REP MOD EXP JTS, REP SPALLS, INS CON...
|
3LW CIVIL LLC
($138,395)
|
|
|
0420-01-040
|
JACKSON
|
YOAKUM
|
$874,233
|
SH 172
|
STP 2016(804)HES
|
08/09/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
CHAMPION INFRASTRUCTURE, LLC
($864,757)
|
|
|
0905-06-110
|
LUBBOCK
|
LUBBOCK
|
$92,364
|
CS
|
BR 1702(601)
|
08/09/2017
|
11/15/2023
|
BEAM REPAIR
|
DRS CONSTRUCTION, INC.
($93,214)
|
|
|
6310-01-001
|
ELLIS
|
DALLAS
|
$236,437
|
FM0984
|
RMC - 631001001
|
08/09/2017
|
11/15/2023
|
REHAB OF EXIST CULVERTS
|
L.C. JORDAN & SON
($244,090)
|
|
|
6319-59-001
|
BROWN
|
BROWNWOOD
|
$445,454
|
US0067
|
BPM - 631959001
|
08/09/2017
|
11/15/2023
|
MISCELLANEOUS BRIDGE REPAIR
|
FNH CONSTRUCTION, LLC
($564,232)
|
|
|
0005-06-117
|
HOWARD
|
ABILENE
|
$1,097,493
|
IH 20
|
BR 1702(598)
|
08/08/2017
|
11/15/2023
|
BRIDGE REHAB
|
STRUCTURAL TECHNOLOGIES, LLC
($1,316,919)
|
|
|
0141-20-009
|
KIMBLE
|
SAN ANGELO
|
$1,147,555
|
SL 481
|
BR 1702(667)
|
08/08/2017
|
11/15/2023
|
BRIDGE MAINT
|
ALLEN KELLER COMPANY
($1,146,309)
|
|
|
0920-30-079
|
ORANGE
|
BEAUMONT
|
$381,857
|
CS
|
BR 2014(324)
|
08/08/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
WIDGEON CONSTRUCTION, INC.
($316,837)
|
|
|
0937-03-016
|
HOUSTON
|
LUFKIN
|
$1,786,986
|
FM 227
|
STP 1702(636)HES
|
08/08/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
L.C. JORDAN & SON
($1,576,406)
|
|
|
6305-76-001
|
CHEROKEE
|
TYLER
|
$68,192
|
US0069
|
RMC - 630576001
|
07/13/2017
|
11/15/2023
|
CULVERT REPAIR
|
HIGHWAY 19 CONSTRUCTION LLC
($60,270)
|
|
|
6314-72-001
|
CROCKETT
|
SAN ANGELO
|
$170,130
|
IH0010
|
RMC - 631472001
|
07/13/2017
|
11/15/2023
|
REPAIR BRIDGE RAIL
|
SCR CIVIL CONSTRUCTION, LLC
($161,660)
|
|
|
0396-02-026
|
MASON
|
AUSTIN
|
$1,239,894
|
SH 29
|
STP 1702(551)HES
|
07/12/2017
|
11/15/2023
|
UPGRADE MBGF, SAFETY TREAT, PROFILE...
|
L.C. JORDAN & SON
($1,204,214)
|
|
|
0011-07-051
|
STEPHENS
|
BROWNWOOD
|
$3,480,792
|
US 180
|
BR 1702(472)
|
07/11/2017
|
11/15/2023
|
REHAB BRIDGE
|
GIBSON & ASSOCIATES, INC.
($3,484,145)
|
|
|
0240-03-036
|
WHARTON
|
YOAKUM
|
$2,286,163
|
SH 60
|
STP 1702(486)HES
|
07/11/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
SB CONTRACTORS LLC
($1,947,826)
|
|
|
0914-26-007
|
MASON
|
AUSTIN
|
$265,763
|
CR
|
BR 1402(184)
|
07/11/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
ALLEN KELLER COMPANY
($264,228)
|
|
|
6312-67-001
|
VICTORIA
|
YOAKUM
|
$311,430
|
US0077
|
BPM - 631267001
|
07/11/2017
|
11/15/2023
|
BEAM REPAIR
|
DRS CONSTRUCTION, INC.
($268,722)
|
|
|
0917-17-065
|
GRIMES
|
BRYAN
|
$890,126
|
CR
|
BR 2012(273)
|
06/07/2017
|
11/15/2023
|
REPLACE EXIST BRIDGE
|
TREVWAY, INC.
($905,681)
|
|
|
0920-06-033
|
NEWTON
|
BEAUMONT
|
$571,522
|
CR
|
BR 2017(547)
|
06/07/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
OLDCASTLE MATERIALS TEXAS, INC.
($646,004)
|
|
|
6313-96-001
|
BROWN
|
BROWNWOOD
|
$668,103
|
US0067
|
RMC - 631396001
|
06/07/2017
|
11/15/2023
|
BRIDGE AND CONC WORK (WILL-CALL)
|
L.C. JORDAN & SON
($711,915)
|
|
|
0006-06-103
|
TAYLOR
|
ABILENE
|
$2,577,356
|
IH 20
|
BR 1702(237)
|
06/06/2017
|
11/15/2023
|
REHAB EXIST BRIDGE
|
JAY-REESE CONTRACTORS, INC.
($2,981,257)
|
|
|
6311-25-001
|
ROBERTSON
|
BRYAN
|
$281,400
|
SH0007
|
BPM - 631125001
|
05/09/2017
|
11/15/2023
|
REPAIR OF CORRODED STEEL PILES
|
PBX BRIDGE COMPANY
($226,520)
|
|
|
6311-27-001
|
LEON
|
BRYAN
|
$63,518
|
SH0075
|
BPM - 631127001
|
05/09/2017
|
11/15/2023
|
RIP RAP FOR SCOUR REPAIR
|
TEXCAVATION COMPANY LLC.
($56,555)
|
|
|
6312-42-001
|
FANNIN
|
PARIS
|
$173,014
|
FM0824
|
BPM - 631242001
|
04/20/2017
|
11/15/2023
|
EROSION REPAIR
|
HARTBEAT CONSTRUCTION
($168,515)
|
|
|
6315-37-001
|
HUNT
|
PARIS
|
$131,750
|
IH0030
|
RMC - 631537001
|
04/20/2017
|
11/15/2023
|
BRIDGE RAIL REPAIR
|
SJ&J CONSTRUCTION, LLC
($190,925)
|
|
|
6307-60-001
|
SABINE
|
LUFKIN
|
$137,561
|
SH0184
|
RMC - 630760001
|
04/19/2017
|
11/15/2023
|
DRAINAGE REPAIR
|
L.C. JORDAN & SON
($149,008)
|
|
|
6314-29-001
|
FANNIN
|
PARIS
|
$609,628
|
FM0100
|
RMC - 631429001
|
04/05/2017
|
11/15/2023
|
CULVERT REPAIR
|
SAMMY GIST ENTERPRISES, INC.
($620,554)
|
|
|
0911-28-033
|
HOUSTON
|
LUFKIN
|
$751,029
|
CR
|
BR 2014(435)
|
04/04/2017
|
11/15/2023
|
REPLACE BRIDGE AND APPROACHES
|
HODGES AND SON CONSTRUCTION COMPANY, INC.
($619,444)
|
|
|
6312-46-001
|
MCLENNAN
|
WACO
|
$442,766
|
SH0006
|
BPM - 631246001
|
04/04/2017
|
11/15/2023
|
BRIDGE PREVENT MAINT
|
BECK-REIT & SONS, LTD.
($322,993)
|
|
|
6311-28-001
|
WALKER
|
BRYAN
|
$107,070
|
SH0030
|
BPM - 631128001
|
03/14/2017
|
11/15/2023
|
BRIDGE JOINT REPAIR
|
FUQUA CONSTRUCTION CO., INC.
($91,577)
|
|
|
0923-06-075
|
BROWN
|
BROWNWOOD
|
$469,053
|
CS
|
STP 2017(214)TAPS
|
03/08/2017
|
11/15/2023
|
CNSTR BIKE/ PED PATH
|
MHB CONSTRUCTION, INC.
($427,890)
|
|
|
6312-12-001
|
CARSON
|
AMARILLO
|
$522,440
|
IH0040
|
BPM - 631212001
|
03/08/2017
|
11/15/2023
|
MISC. BRIDGE REPAIRS
|
GILVIN-TERRILL, LTD.
($430,115)
|
|
|
6309-85-001
|
LAMPASAS
|
BROWNWOOD
|
$514,572
|
FM0580
|
BPM - 630985001
|
03/07/2017
|
11/15/2023
|
MISC BRIDGE REPIAR
|
L.C. JORDAN & SON
($520,475)
|
|
|
1109-01-023
|
JASPER
|
BEAUMONT
|
$495,972
|
FM 777
|
STP 2017(626)HES
|
02/03/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
NORMAN HIGHWAY CONSTRUCTORS, INC.
($368,813)
|
|
|
2553-01-117
|
ANGELINA
|
LUFKIN
|
$1,755,615
|
US 59
|
STP 2017(650)HES
|
02/03/2017
|
11/15/2023
|
IMPROVE GUARDRAIL TO DESIGN STANDARD...
|
SJ&J CONSTRUCTION, LLC
($1,891,195)
|
|
|
6307-23-001
|
HOWARD
|
ABILENE
|
$401,238
|
IH0020
|
BPM - 630723001
|
02/03/2017
|
11/15/2023
|
MISCELLANEOUS BRIDGE REPAIRS
|
AW&E CONSTRUCTION LLC
($264,432)
|
|
|
6311-96-001
|
ANGELINA
|
LUFKIN
|
$346,309
|
US0059
|
BPM - 631196001
|
02/03/2017
|
11/15/2023
|
BRIDGE AND SCOUR REPAIRS
|
CHAMPION INFRASTRUCTURE, LLC
($286,936)
|
|
|
6304-13-001
|
CAMP
|
ATLANTA
|
$665,850
|
FM0993
|
BPM - 630413001
|
02/02/2017
|
11/15/2023
|
BRIDGE PROTECTIVE MAINT
|
STATELINE CONSTRUCTION, LLC
($743,841)
|
|
|
0905-00-091
|
LUBBOCK
|
LUBBOCK
|
$496,080
|
VA
|
STP 2017(596)
|
01/05/2017
|
11/15/2023
|
REPAIR SETS
|
GILVIN-TERRILL, LTD.
($431,448)
|
|
|
1681-01-012
|
SAN JACINTO
|
LUFKIN
|
$1,421,956
|
FM 1127
|
STP 2017(500)HES
|
01/05/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
L.C. JORDAN & SON
($1,585,480)
|
|
|
0118-01-019
|
HOUSTON
|
LUFKIN
|
$3,352,710
|
SH 21
|
STP 2017(307)HES
|
01/04/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
L.C. JORDAN & SON
($2,981,767)
|
|
|
0634-01-012
|
CHEROKEE
|
TYLER
|
$1,042,386
|
FM 22
|
STP 2017(363)HES
|
01/04/2017
|
11/15/2023
|
SAFETY TREAT FIXED OBJECTS
|
HIGHWAY 19 CONSTRUCTION LLC
($1,037,127)
|
|
|
6263-97-001
|
KAUFMAN
|
DALLAS
|
$192,279
|
FM3094
|
RMC - 626397001
|
11/03/2016
|
11/15/2023
|
CULVERT EXTENSION & CROSS DRAINAGE
|
BECK-REIT & SONS, LTD.
($258,874)
|
|
|
6305-47-001
|
BRAZOS
|
BRYAN
|
$1,387,044
|
SH0021
|
RMC - 630547001
|
11/03/2016
|
11/15/2023
|
SLOPE REPAIR
|
ANGEL BROTHERS HOLDINGS CORP.
($1,149,333)
|
|
|
6307-84-001
|
ECTOR
|
ODESSA
|
$464,375
|
IH0020
|
RMC - 630784001
|
11/03/2016
|
11/15/2023
|
EMERGENCY BRIDGE REPAIR
|
SCR CIVIL CONSTRUCTION, LLC
($412,850)
|
|
|
6305-75-001
|
VAN ZANDT
|
TYLER
|
$80,145
|
US0080
|
RMC - 630575001
|
09/06/2016
|
11/15/2023
|
REPAIR OF RETAINING WALL
|
RED BARON BUILDING COMPANY, L.L.C.
($65,000)
|