Show Job Controls
Bid Cobra

CAMP FM0993 (6304-13-001)

Items: 29

County: CAMP
Length: N/A
Highway: FM0993
District: ATLANTA
Control Number: 6304-13-001
DBE Goal: N/A
Project: BPM - 630413001
Guaranty: N/A
Time: 150 W
Engineer's Estimate: $665,849.78
Date: 02/02/2017 (9 years ago)
Contract Number: N/A
Type: BRIDGE PROTECTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$665,849.78
$743,840.72
Over/Under Est: 11.71% $77,990.94
Over/Under Est: 18.34% $122,146.59
Amt Left: 5.94% $44,155.65
Over/Under Est: 18.6% $123,840.22
Amt Left: 6.16% $45,849.28
Delta: -0.21% -$1,693.63
$818,018.17
Over/Under Est: 22.85% $152,168.39
Amt Left: 9.97% $74,177.45
Delta: -3.59% -$28,328.17
Over/Under Est: 24.65% $164,132.72
Amt Left: 11.58% $86,141.78
Delta: -1.46% -$11,964.33
Over/Under Est: 29.32% $195,217.09
Amt Left: 15.76% $117,226.15
Delta: -3.75% -$31,084.37
Over/Under Est: 36.4% $242,367.09
Amt Left: 22.1% $164,376.15
Delta: -5.48% -$47,150.00
$993,006.25
Over/Under Est: 49.13% $327,156.47
Amt Left: 33.5% $249,165.53
Delta: -9.34% -$84,789.38

Bid Items & Bid Tabulations

29 Total 0 of 29
CAMP  |  FM0993  |  ATLANTA  |  6304-13-001  |  02/02/2017  |  $665,849.78  |  BPM - 630413001  |  BRIDGE PROTECTIVE MAINT  |  150 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
EAST TEXAS BRIDGE, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
PIERCE R & B LLC
HARTBEAT CONSTRUCTION
FNH CONSTRUCTION, LLC
CHAMPION INFRASTRUCTURE, LLC
L.C. JORDAN & SON
REMOVING CONC (RIPRAP)
SY 122.000 $15.000 $58.300 $35.000 $40.000 $50.000 $36.000 $20.000 $30.000 $30.000
REMOVE CONC (WINGWALL)
CY 11.000 $300.000 $300.000 $350.000 $1,000.000 $160.000 $375.000 $500.000 $1,800.000 $50.000
EXCAVATION (CHANNEL)
CY 730.000 $9.000 $20.000 $35.000 $30.000 $35.000 $32.000 $20.000 $60.000 $20.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 265.000 $14.000 $22.000 $40.000 $40.000 $60.000 $36.000 $35.000 $60.000 $60.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 100.000 $0.250 $3.000 $5.000 $6.000 $2.200 $7.000 $2.000 $2.000 $3.000
FLOWABLE BACKFILL
CY 143.000 $175.000 $250.000 $350.000 $275.000 $250.000 $767.000 $450.000 $220.000 $350.000
TEMPORARY SPL SHORING
SF 388.000 $40.000 $35.000 $75.000 $60.000 $43.000 $37.000 $45.000 $40.000 $25.000
CL C CONC (MISC)
CY 2.300 $1,000.000 $1,000.000 $1,500.000 $1,600.000 $1,300.000 $1,200.000 $1,100.000 $1,500.000 $2,000.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 80.000 $150.000 $80.000 $250.000 $100.000 $165.000 $55.000 $300.000 $350.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,348.000 $150.000 $190.000 $145.000 $140.000 $185.000 $175.000 $185.000 $240.000 $295.000
BEDDING MATERIAL (6 IN)
CY 390.000 $150.000 $180.000 $140.000 $160.000 $165.000 $88.000 $6.500 $40.000 $240.000
RIPRAP (MOW STRIP)(4 IN)
CY 300.400 $525.000 $425.000 $400.000 $450.000 $425.000 $510.000 $550.000 $600.000 $500.000
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
LF 14.000 $1,500.000 $2,500.000 $1,500.000 $3,000.000 $1,400.000 $1,287.000 $1,000.000 $3,200.000 $1,600.000
WINGWALL (FW - S) (HW=10 FT)
EA 2.000 $3,600.000 $1,000.000 $10,000.000 $30,000.000 $12,500.000 $12,000.000 $25,000.000 $12,000.000 $20,000.000
CLEAN EXIST CULVERTS
CY 100.000 $220.000 $100.000 $60.000 $80.000 $150.000 $57.000 $200.000 $60.000 $75.000
MOBILIZATION
LS 1.000 $58,447.720 $75,000.000 $80,000.000 $60,000.000 $81,000.000 $67,000.000 $85,000.000 $50,000.000 $75,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $2,500.000 $3,000.000 $10,000.000 $6,000.000 $7,500.000 $5,700.000 $8,500.000 $4,500.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 50.000 $70.000 $45.000 $65.000 $60.000 $41.500 $57.000 $30.000 $30.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $8.000 $18.000 $20.000 $20.000 $12.500 $37.000 $15.000 $30.000 $10.000
MTL W-BEAM GD FEN (TIM POST)
LF 896.875 $20.000 $23.000 $21.000 $24.000 $20.600 $28.000 $25.000 $25.000 $30.000
SHORT RADIUS
LF 25.000 $34.000 $46.000 $50.000 $60.000 $51.010 $63.000 $35.000 $40.000 $55.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,100.000 $925.000 $1,000.000 $1,000.000 $945.000 $1,225.000 $1,850.000 $3,500.000 $1,500.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 75.000 $70.000 $100.000 $80.000 $100.000 $78.500 $115.000 $30.000 $75.000 $85.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,350.000 $2,300.000 $2,500.000 $2,200.000 $2,329.000 $2,700.000 $2,850.000 $1,500.000 $3,000.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 12.000 $60.000 $70.000 $45.000 $60.000 $47.000 $87.000 $100.000 $150.000 $100.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 152.000 $4.400 $5.000 $11.000 $10.000 $11.000 $15.000 $15.000 $10.000 $20.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 20.000 $2.400 $5.000 $12.000 $10.000 $13.890 $15.000 $15.000 $20.000 $20.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 300.000 $0.560 $5.000 $11.000 $10.000 $11.000 $15.000 $15.000 $20.000 $20.000
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
EA 8.000 $21.220 $50.000 $40.000 $120.000 $43.500 $55.000 $150.000 $500.000 $30.000
Totals: $665,849.780 $743,840.725 $787,996.375 $789,690.000 $818,018.175 $829,982.500 $861,066.875 $908,216.875 $993,006.250