Show Job Controls
Bid Cobra

MCLENNAN SH 6 (0049-01-095)

Items: 44

County: MCLENNAN
Length: N/A
Highway: SH 6
District: WACO
Control Number: 0049-01-095
DBE Goal: 200.0%
Project: F 2024(764)
Guaranty: N/A
Time: 120 WORKING DAYS
Engineer's Estimate: $29,068,891.09
Date: 02/02/2024 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$29,068,891.09
$22,852,587.83
Over/Under Est: -21.38% -$6,216,303.26
Over/Under Est: -9.67% -$2,809,677.42
Amt Left: 14.91% $3,406,625.84
Over/Under Est: -7.87% -$2,286,478.72
Amt Left: 17.2% $3,929,824.54
Delta: -1.99% -$523,198.70
Subcontractor Percentage Amount
KING GEORGE TRAFFIC SOLUTIONS LLC 2.77% $621,407.23
D. I. J. CONSTRUCTION, INC. 2.33% $522,699.95
ROADWAY SPECIALTIES, INC. 1.71% $383,612.41
WILKO INDUSTRIAL, L.L.C. 1.03% $231,064.78
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. 0.48% $107,680.68
PRIMATE CONSTRUCTION, LP 0.39% $87,490.55
PROFESSIONAL TRAFFIC CONTROL LLC 0.15% $33,650.21
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.05% $11,216.74
Total: 8.91% $1,998,822.55

Bid Items & Bid Tabulations

44 Total 0 of 44
MCLENNAN  |  SH 6  |  WACO  |  0049-01-095  |  02/02/2024  |  $29,068,891.09  |  F 2024(764)  |  SURF/ROADWAY RESTOR  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
REMOVING CONCRETE(MOW STRIP)
LF 4,750.000 $15.000 $14.000 $8.000 $10.250
BACKFILL (TY A)
STA 1,932.100 $222.500 $150.000 $160.000 $210.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 5,000.000 $95.000 $60.000 $68.000 $88.500
PLANE ASPH CONC PAV (0" TO 2" MICRO)
SY 932,640.000 $2.000 $1.280 $1.850 $1.810
RIPRAP (MOW STRIP)(4 IN)
CY 404.100 $621.310 $650.000 $625.000 $645.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 1,124.000 $38.600 $40.000 $27.640 $38.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,607.700 $50.350 $40.000 $33.510 $43.000
ADJUSTING MANHOLES
EA 2.000 $3,000.000 $1,500.000 $1,800.000 $2,300.000
MOBILIZATION
LS 1.000 $2,600,000.000 $1,625,000.000 $780,000.000 $2,350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $10,000.000 $3,000.000 $2,560.000 $40,000.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 363,717.000 $0.400 $0.200 $0.180 $0.250
MTL W-BEAM GD FEN (STEEL POST)
LF 4,910.000 $31.290 $35.000 $27.000 $31.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 29.000 $2,560.000 $2,900.000 $2,700.000 $3,000.000
SHORT RADIUS
LF 65.000 $150.000 $50.000 $24.000 $48.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,400.000 $1,411.000 $1,100.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 4,750.000 $3.790 $9.000 $3.000 $2.700
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 29.000 $366.670 $340.000 $250.000 $270.000
GUARDRAIL END TREATMENT (INSTALL)
EA 30.000 $3,312.500 $3,500.000 $2,850.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 29.000 $452.120 $475.000 $275.000 $270.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 56.000 $62.500 $50.000 $38.000 $45.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 47,760.000 $0.400 $0.220 $0.500 $0.540
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 189,669.000 $0.330 $0.220 $0.220 $0.240
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 30,427.000 $0.570 $0.260 $0.500 $0.540
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 183,008.000 $0.330 $0.220 $0.220 $0.240
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 19,087.000 $1.170 $1.500 $0.930 $1.450
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,591.000 $2.070 $1.500 $0.930 $1.450
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 7,596.000 $2.030 $1.250 $1.300 $1.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 30,427.000 $1.370 $1.250 $1.000 $1.080
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,055.000 $17.520 $7.000 $6.250 $6.720
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 47,760.000 $0.660 $0.880 $0.800 $0.860
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 189,669.000 $0.710 $0.920 $0.700 $0.750
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 183,008.000 $0.690 $0.880 $0.700 $0.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 127.000 $300.000 $250.000 $205.000 $220.000
PREFAB PAV MRK TY C (W) (WORD)
EA 100.000 $400.000 $300.000 $240.000 $258.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 863.000 $50.000 $60.000 $40.000 $43.000
REFL PAV MRKR TY I-C
EA 2,277.000 $4.300 $6.000 $5.000 $5.250
D-GR HMA TY-D PG70-22 (LEVEL-UP)
TON 51,297.000 $120.000 $88.000 $102.200 $119.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 102,590.000 $131.000 $120.000 $145.000 $134.000
TACK COAT
GAL 93,264.000 $3.380 $3.500 $2.950 $0.010
UNDERSEAL COURSE
GAL 233,166.000 $7.500 $1.500 $4.850 $0.010
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $11,810.000 $7,500.000 $10,000.000 $15,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $25.000 $25.000 $25.000 $26.500
TMA (STATIONARY)
DAY 270.000 $628.190 $350.000 $240.000 $250.000
TMA (MOBILE OPERATION)
HR 1,800.000 $24.330 $73.000 $40.000 $20.000
Totals: $29,068,891.086 $22,852,587.830 $26,259,213.677 $26,782,412.370