|
|
|
PREPARING ROW
|
STA
|
462.220
|
$600.000
|
$200.000
|
$260.250
|
$275.000
|
$304.000
|
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
19.000
|
$15.000
|
$25.000
|
$18.200
|
$19.000
|
$14.280
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
451.770
|
$150.000
|
$100.000
|
$160.600
|
$135.000
|
$198.430
|
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
428.000
|
$15.000
|
$30.000
|
$23.550
|
$25.000
|
$16.370
|
|
|
|
BACKFILL (TY B)
|
STA
|
462.220
|
$150.000
|
$175.000
|
$160.600
|
$155.000
|
$198.350
|
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
462.220
|
$175.000
|
$200.000
|
$91.200
|
$165.000
|
$198.350
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
120,765.000
|
$0.100
|
$0.050
|
$0.070
|
$0.050
|
$0.050
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
120,765.000
|
$0.100
|
$0.050
|
$0.070
|
$0.050
|
$0.050
|
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
241,530.000
|
$0.220
|
$0.200
|
$0.230
|
$0.170
|
$0.200
|
|
|
|
VEGETATIVE WATERING
|
MG
|
1,449.000
|
$15.000
|
$10.000
|
$14.650
|
$0.010
|
$3.540
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
129,960.000
|
$10.000
|
$14.000
|
$10.800
|
$14.060
|
$12.530
|
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
101,059.000
|
$1.750
|
$2.830
|
$3.150
|
$3.340
|
$2.100
|
|
|
|
ASPH (AC-20XP)
|
GAL
|
107,404.000
|
$5.000
|
$3.420
|
$3.500
|
$4.050
|
$4.000
|
|
|
|
ASPH (RC-250)
|
GAL
|
36,389.000
|
$5.000
|
$4.150
|
$5.150
|
$4.870
|
$4.190
|
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
928.000
|
$100.000
|
$151.000
|
$143.050
|
$87.050
|
$117.770
|
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
1,102.000
|
$110.000
|
$180.000
|
$189.750
|
$131.630
|
$161.180
|
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
1,240.000
|
$100.000
|
$131.000
|
$134.000
|
$93.300
|
$123.920
|
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
192.000
|
$139.000
|
$180.000
|
$160.000
|
$163.000
|
$188.500
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
86.000
|
$1.500
|
$68.000
|
$78.050
|
$50.000
|
$61.200
|
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
336.000
|
$450.000
|
$180.000
|
$162.600
|
$125.000
|
$127.500
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
199.000
|
$15.000
|
$10.000
|
$19.500
|
$15.000
|
$15.300
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,069.000
|
$55.000
|
$30.000
|
$26.000
|
$65.660
|
$71.400
|
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
36.000
|
$600.000
|
$100.000
|
$227.600
|
$175.000
|
$178.500
|
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
4.500
|
$600.000
|
$600.000
|
$585.250
|
$450.000
|
$459.000
|
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
43.000
|
$150.000
|
$180.000
|
$185.150
|
$142.000
|
$201.680
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
161.400
|
$450.000
|
$400.000
|
$552.750
|
$425.000
|
$433.500
|
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
100.000
|
$185.000
|
$226.000
|
$273.100
|
$160.900
|
$368.120
|
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
80.000
|
$600.000
|
$625.000
|
$1,055.500
|
$850.000
|
$867.000
|
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
5.000
|
$500.000
|
$600.000
|
$812.850
|
$625.000
|
$637.500
|
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
51.000
|
$600.000
|
$600.000
|
$786.600
|
$650.000
|
$663.000
|
|
|
|
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
|
LF
|
54.000
|
$550.000
|
$658.000
|
$873.400
|
$700.000
|
$714.000
|
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
33.000
|
$700.000
|
$700.000
|
$817.300
|
$675.000
|
$688.500
|
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
46.000
|
$600.000
|
$800.000
|
$823.400
|
$700.000
|
$714.000
|
|
|
|
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
|
LF
|
9.000
|
$500.000
|
$600.000
|
$812.850
|
$625.000
|
$637.500
|
|
|
|
CONC BOX CULVERT (10 FT X 4 FT)(EXTEND)
|
LF
|
12.500
|
$900.000
|
$850.000
|
$910.400
|
$700.000
|
$714.000
|
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
50.000
|
$50.000
|
$30.000
|
$45.500
|
$35.000
|
$35.700
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
340.000
|
$125.000
|
$90.000
|
$162.600
|
$125.000
|
$127.500
|
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
54.000
|
$200.000
|
$113.000
|
$260.100
|
$200.000
|
$204.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
6.000
|
$6,500.000
|
$5,000.000
|
$7,470.100
|
$6,000.000
|
$6,120.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$6,500.000
|
$7,322.000
|
$9,754.250
|
$7,500.000
|
$7,650.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
1.000
|
$6,500.000
|
$8,000.000
|
$10,404.500
|
$8,000.000
|
$8,160.000
|
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
2.000
|
$6,100.000
|
$6,500.000
|
$8,453.700
|
$6,500.000
|
$6,630.000
|
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
10.000
|
$7,100.000
|
$6,000.000
|
$9,254.250
|
$7,500.000
|
$7,650.000
|
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
3.000
|
$9,400.000
|
$7,500.000
|
$11,054.800
|
$8,500.000
|
$8,670.000
|
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$9,200.000
|
$8,000.000
|
$13,005.650
|
$10,000.000
|
$10,200.000
|
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$8,500.000
|
$9,000.000
|
$12,355.350
|
$9,500.000
|
$9,690.000
|
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
2.000
|
$15,000.000
|
$18,417.000
|
$39,016.900
|
$30,000.000
|
$30,600.000
|
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$13,500.000
|
$10,000.000
|
$20,809.000
|
$16,000.000
|
$16,320.000
|
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
6.000
|
$15,000.000
|
$12,000.000
|
$26,011.300
|
$20,000.000
|
$20,400.000
|
|
|
|
WINGWALL (SW - 0) (HW=6 FT)
|
EA
|
1.000
|
$9,000.000
|
$8,000.000
|
$11,705.100
|
$9,000.000
|
$9,180.000
|
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$495.000
|
$500.000
|
$650.300
|
$500.000
|
$510.000
|
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$500.000
|
$465.000
|
$650.300
|
$500.000
|
$500.000
|
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
18.000
|
$520.000
|
$500.000
|
$682.800
|
$525.000
|
$535.500
|
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$600.000
|
$465.000
|
$682.800
|
$525.000
|
$535.500
|
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
50.000
|
$670.000
|
$557.000
|
$825.000
|
$650.000
|
$663.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$700.000
|
$600.000
|
$824.600
|
$650.000
|
$663.000
|
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$1,000.000
|
$1,000.000
|
$1,235.550
|
$950.000
|
$969.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$900.000
|
$750.000
|
$1,040.450
|
$800.000
|
$816.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,035.000
|
$909.000
|
$1,173.050
|
$950.000
|
$969.000
|
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,600.000
|
$1,500.000
|
$3,641.600
|
$2,800.000
|
$2,856.000
|
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$4,500.000
|
$4,500.000
|
$6,242.700
|
$4,800.000
|
$4,896.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$4,000.000
|
$3,860.000
|
$6,242.700
|
$4,800.000
|
$4,896.000
|
|
|
|
SET (TY II) (48 IN) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$4,300.000
|
$7,000.000
|
$8,843.850
|
$6,800.000
|
$6,936.000
|
|
|
|
SET (TY II) (48 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$5,600.000
|
$3,172.000
|
$5,202.250
|
$4,000.000
|
$4,080.000
|
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$6,500.000
|
$6,290.000
|
$8,843.850
|
$6,800.000
|
$6,936.000
|
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
12.000
|
$40.000
|
$100.000
|
$45.500
|
$35.000
|
$35.700
|
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
12.000
|
$60.000
|
$100.000
|
$78.000
|
$60.000
|
$61.200
|
|
|
|
REMOV & RE - LAY PIPE (48 IN)
|
LF
|
12.000
|
$75.000
|
$100.000
|
$97.550
|
$75.000
|
$76.500
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$1,950.850
|
$1,500.000
|
$1,530.000
|
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$300.000
|
$500.000
|
$455.200
|
$50.000
|
$357.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
26.000
|
$650.000
|
$500.000
|
$1,040.450
|
$800.000
|
$816.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
407.000
|
$15.000
|
$10.000
|
$13.000
|
$10.000
|
$10.200
|
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
70.000
|
$60.000
|
$50.000
|
$78.050
|
$60.000
|
$61.200
|
|
|
|
REMOV STR (RAILROAD CROSSING)
|
EA
|
1.000
|
$9,000.000
|
$5,000.000
|
$2,913.000
|
$4,500.000
|
$2,500.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$534,764.260
|
$500,000.000
|
$291,690.000
|
$576,000.000
|
$728,917.230
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
27.000
|
$5,000.000
|
$1,266.000
|
$9,000.000
|
$3,162.000
|
$7,377.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,568.000
|
$35.000
|
$30.000
|
$40.300
|
$33.000
|
$36.720
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,568.000
|
$8.000
|
$5.000
|
$9.100
|
$5.000
|
$5.100
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,776.000
|
$2.000
|
$2.250
|
$3.150
|
$2.100
|
$2.300
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,776.000
|
$0.750
|
$0.750
|
$0.550
|
$0.650
|
$0.770
|
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
570.000
|
$15.000
|
$25.000
|
$41.900
|
$35.000
|
$39.290
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
570.000
|
$5.000
|
$10.000
|
$33.000
|
$10.000
|
$39.290
|
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
570.000
|
$5.000
|
$25.000
|
$30.750
|
$35.000
|
$39.290
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
19.000
|
$90.000
|
$150.000
|
$130.100
|
$105.000
|
$102.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
728.000
|
$35.000
|
$45.000
|
$18.900
|
$43.900
|
$39.680
|
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
964.000
|
$35.000
|
$19.000
|
$65.050
|
$63.750
|
$59.930
|
|
|
|
DRIVEWAYS (BASE)
|
SY
|
2,928.000
|
$30.000
|
$25.000
|
$13.000
|
$20.000
|
$20.630
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,725.000
|
$25.000
|
$18.250
|
$27.300
|
$21.250
|
$21.680
|
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$29.000
|
$24.000
|
$26.000
|
$18.500
|
$18.870
|
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
4.000
|
$2,200.000
|
$1,650.000
|
$1,050.850
|
$1,640.000
|
$1,672.800
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,650.000
|
$2.250
|
$2.000
|
$3.250
|
$2.750
|
$2.810
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
68.000
|
$250.000
|
$250.000
|
$260.100
|
$150.000
|
$153.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
14.000
|
$2,500.000
|
$2,400.000
|
$3,218.900
|
$2,575.000
|
$2,626.500
|
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,750.000
|
$1,500.000
|
$2,601.150
|
$1,425.000
|
$1,453.500
|
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$600.000
|
$1,000.000
|
$1,300.500
|
$950.000
|
$969.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$9,500.000
|
$8,000.000
|
$11,705.100
|
$7,753.000
|
$7,908.060
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$350.000
|
$325.000
|
$483.400
|
$750.000
|
$357.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
32.000
|
$150.000
|
$150.000
|
$205.000
|
$150.000
|
$147.900
|
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
3.000
|
$250.000
|
$160.000
|
$257.800
|
$250.000
|
$204.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
137.000
|
$525.000
|
$465.000
|
$688.000
|
$505.000
|
$479.400
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$600.000
|
$710.000
|
$804.700
|
$857.000
|
$652.800
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$850.000
|
$715.000
|
$872.400
|
$826.000
|
$734.400
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$900.000
|
$850.000
|
$995.450
|
$1,031.000
|
$775.200
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$925.000
|
$850.000
|
$1,232.000
|
$1,009.000
|
$938.400
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
125.000
|
$100.000
|
$70.000
|
$144.600
|
$60.000
|
$91.800
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$20.000
|
$35.000
|
$19.500
|
$24.000
|
$24.480
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
74.000
|
$70.000
|
$60.000
|
$65.000
|
$45.000
|
$66.300
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
28.000
|
$25.000
|
$29.000
|
$32.500
|
$33.000
|
$33.660
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
87,120.000
|
$0.200
|
$0.180
|
$0.350
|
$0.180
|
$0.260
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
7,310.000
|
$0.200
|
$0.240
|
$0.350
|
$0.240
|
$0.260
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
42,087.000
|
$0.170
|
$0.180
|
$0.350
|
$0.180
|
$0.260
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,729.000
|
$1.000
|
$1.000
|
$1.100
|
$1.150
|
$2.250
|
|
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
64.000
|
$7.000
|
$10.000
|
$8.450
|
$10.000
|
$6.630
|
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
87,120.000
|
$0.750
|
$0.670
|
$1.100
|
$0.670
|
$0.870
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
7,310.000
|
$0.750
|
$0.670
|
$1.550
|
$0.670
|
$1.220
|
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
42,087.000
|
$0.750
|
$0.670
|
$1.100
|
$0.670
|
$0.870
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
927.000
|
$3.250
|
$5.000
|
$4.800
|
$5.000
|
$3.770
|
|
|
|
THERMOPLASTIC PIPE (24 IN)(PP)(TYPE I)
|
LF
|
111.000
|
$70.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
|
LF
|
72.000
|
$70.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE(12 IN)(PP)(TYPE III)
|
LF
|
50.000
|
$45.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
|
LF
|
50.000
|
$55.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
129,960.000
|
$1.750
|
$1.490
|
$0.730
|
$2.016
|
$1.600
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$5,000.000
|
$19,965.000
|
$22,500.000
|
$13,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
420.000
|
$250.000
|
$200.000
|
$341.000
|
$0.010
|
$250.000
|
|
1
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
50.000
|
$45.000
|
$33.000
|
$39.000
|
$30.000
|
$30.600
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
50.000
|
$55.000
|
$40.000
|
$49.400
|
$38.000
|
$38.760
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
183.000
|
$70.000
|
$54.000
|
$71.550
|
$55.000
|
$56.100
|
|
Totals: |
$6,035,216.900
|
$5,973,029.700
|
$6,327,263.088
|
$6,353,035.340
|
$6,608,067.445
|