|
6435-88-001 |
EL PASO |
EL PASO |
$1,247,490 |
IH0010 |
BPM - 643588001 |
09/06/2024 |
07/30/2024 |
BRIDGE PREVENT MAINT |
INTERNATIONAL EAGLE ENTERPRISES, INC.($1,220,296) |
|
6464-27-001 |
EL PASO |
EL PASO |
$402,500 |
IH0010 |
RMC - 646427001 |
06/06/2024 |
04/30/2024 |
CULVERT CLEANING |
INTERNATIONAL EAGLE ENTERPRISES, INC.($347,900) |
|
6464-35-001 |
EL PASO |
EL PASO |
$490,987 |
IH0010 |
RMC - 646435001 |
06/05/2024 |
04/24/2024 |
CULVERT CLEANING |
INTERNATIONAL EAGLE ENTERPRISES, INC.($397,900) |
|
6457-83-001 |
EL PASO |
EL PASO |
$49,680 |
SL0375 |
RMC - 645783001 |
03/07/2024 |
01/25/2024 |
PICNIC AREA MAINT |
C&C SOSA COMPANY, LLC($38,400) |
|
6455-25-001 |
EL PASO |
EL PASO |
$1,139,700 |
IH0010 |
RMC - 645525001 |
12/05/2023 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($1,129,614) |
|
6455-27-001 |
EL PASO |
EL PASO |
$1,238,400 |
IH0010 |
RMC - 645527001 |
11/01/2023 |
11/15/2023 |
RIGID PAVMT REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($1,508,402) |
|
6454-27-001 |
EL PASO |
EL PASO |
$807,925 |
IH0010 |
RMC - 645427001 |
11/01/2023 |
11/15/2023 |
BRIDGE REPAIR |
HAWK CONSTRUCTION($772,250) |
|
6451-29-001 |
EL PASO |
EL PASO |
$1,315,425 |
IH0010 |
RMC - 645129001 |
10/05/2023 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
INTERNATIONAL EAGLE ENTERPRISES, INC.($1,201,850) |
|
2121-02-162 |
EL PASO |
EL PASO |
$1,092,016 |
IH 10 |
BR 2024(032) |
09/06/2023 |
11/15/2023 |
BRIDGE REPL |
DAN WILLIAMS COMPANY($960,423) |
|
6442-64-001 |
EL PASO |
EL PASO |
$281,400 |
IH0010 |
RMC - 644264001 |
06/15/2023 |
11/15/2023 |
CULVERT CLEANING |
SYNERGY PROJECT CONTRACTORS, INC.($354,084) |
|
6435-00-001 |
EL PASO |
EL PASO |
$1,069,150 |
IH0010 |
RMC - 643500001 |
05/05/2023 |
11/15/2023 |
RIGID PAVMT REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($999,905) |
|
0924-00-130 |
EL PASO |
EL PASO |
$1,112,544 |
VA |
BR 2023(519) |
03/07/2023 |
08/21/2024 |
PREVENT MAINT |
DAN WILLIAMS COMPANY($1,135,875) |
|
0374-02-122 |
EL PASO |
EL PASO |
$100,498 |
US 62 |
STP 2023(536)HES |
03/07/2023 |
08/21/2024 |
HAZARD ELIM & SAFETY |
ZTEX CONSTRUCTION, INC.($103,530) |
|
6429-14-001 |
EL PASO |
EL PASO |
$1,221,390 |
IH0010 |
RMC - 642914001 |
02/01/2023 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
E. G. L. CONSTRUCTION, INC.($1,096,193) |
|
6425-30-001 |
EL PASO |
EL PASO |
$999,000 |
IH0010 |
RMC - 642530001 |
12/01/2022 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
INTERNATIONAL EAGLE ENTERPRISES, INC.($897,525) |
|
6421-87-001 |
EL PASO |
EL PASO |
$973,645 |
IH0010 |
RMC - 642187001 |
11/02/2022 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
INTERNATIONAL EAGLE ENTERPRISES, INC.($968,500) |
|
6418-81-001 |
EL PASO |
EL PASO |
$709,200 |
IH0010 |
RMC - 641881001 |
10/06/2022 |
11/15/2023 |
RIGID PAVMT REPAIR |
DOUBLE H CONTRACTING INC.($1,148,000) |
|
2552-03-070 |
EL PASO |
EL PASO |
$831,043 |
SL 375 |
F 2022(824) |
08/04/2022 |
11/15/2023 |
HAZARD ELIM & SAFETY |
INTERNATIONAL EAGLE ENTERPRISES, INC.($678,787) |
|
6405-10-001 |
EL PASO |
EL PASO |
$369,630 |
IH0010 |
RMC - 640510001 |
06/30/2022 |
11/15/2023 |
CULVERT CLEANING |
SYNERGY PROJECT CONTRACTORS, INC.($435,554) |
|
6405-12-001 |
CULBERSON |
EL PASO |
$862,630 |
IH0010 |
RMC - 640512001 |
06/30/2022 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
APACHE BARRICADE & SIGN($921,772) |
|
6408-18-001 |
EL PASO |
EL PASO |
$341,000 |
IH0010 |
RMC - 640818001 |
06/30/2022 |
11/15/2023 |
SWEEPING AND DEBRIS RMVL |
SYNERGY PROJECT CONTRACTORS, INC.($402,262) |
|
6399-24-001 |
EL PASO |
EL PASO |
$553,760 |
IH0010 |
RMC - 639924001 |
06/01/2022 |
09/03/2024 |
BRIDGE JOINT CLEANING AND SEALING |
DOUBLE H CONTRACTING INC.($498,725) |
|
0924-06-649 |
EL PASO |
EL PASO |
$499,042 |
VA |
C 924-6-649 |
03/04/2022 |
11/15/2023 |
PREVENT MAINT |
MIJELUM, L.L.C.($485,120) |
|
6396-17-001 |
EL PASO |
EL PASO |
$48,000 |
SL0375 |
RMC - 639617001 |
02/15/2022 |
11/15/2023 |
PICNIC AREA MAINT |
C&C SOSA COMPANY, LLC($43,200) |
|
6392-94-001 |
EL PASO |
EL PASO |
$781,640 |
IH0010 |
RMC - 639294001 |
01/06/2022 |
11/15/2023 |
FLEXIBLE PAVMT STRUCT REPAIR |
ALLEN CONCRETE, LLC($875,238) |
|
6392-91-001 |
EL PASO |
EL PASO |
$718,525 |
IH0010 |
RMC - 639291001 |
12/01/2021 |
11/15/2023 |
METAL BEAM GUARD FENCE & CHAIN LINK FENCE REPAIR |
E. G. L. CONSTRUCTION, INC.($894,441) |
|
6391-01-001 |
EL PASO |
EL PASO |
$526,970 |
IH0010 |
RMC - 639101001 |
12/01/2021 |
11/15/2023 |
FLEXIBLE PAVMT STRUCT REPAIR |
DOUBLE H CONTRACTING INC.($478,715) |
|
6389-94-001 |
EL PASO |
EL PASO |
$659,243 |
IH0010 |
RMC - 638994001 |
11/04/2021 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
E. G. L. CONSTRUCTION, INC.($609,597) |
|
6388-50-001 |
EL PASO |
EL PASO |
$614,501 |
IH0010 |
RMC - 638850001 |
10/07/2021 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
INTERNATIONAL EAGLE ENTERPRISES, INC.($648,600) |
|
6381-59-001 |
CULBERSON |
EL PASO |
$290,415 |
IH0010 |
RMC - 638159001 |
06/15/2021 |
11/15/2023 |
METAL BEAM GUARD FENCE REPAIR |
DIGG COMMERCIAL, LLC($451,725) |
|
6381-16-001 |
EL PASO |
EL PASO |
$190,030 |
IH0010 |
RMC - 638116001 |
06/08/2021 |
11/15/2023 |
CULVERT & STORM SEWER CLEANING |
DEL MAR CONTRACTING, INC.($229,550) |
|
6376-98-001 |
EL PASO |
EL PASO |
$732,700 |
IH0010 |
RMC - 637698001 |
04/07/2021 |
11/15/2023 |
ASPH PAVMT REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($636,334) |
|
0924-06-627 |
EL PASO |
EL PASO |
$509,882 |
VA |
C 924-6-627 |
03/05/2021 |
11/15/2023 |
BRIDGE MAINT |
SCR CIVIL CONSTRUCTION, LLC($431,802) |
|
0924-00-143 |
EL PASO |
EL PASO |
$584,867 |
VA |
C 924-00-143 |
02/04/2021 |
11/15/2023 |
REPLACE GUARDRAIL |
E. G. L. CONSTRUCTION, INC.($469,044) |
|
0167-01-117 |
EL PASO |
EL PASO |
$1,849,005 |
US 54 |
STP 2B20(101)HES |
12/03/2020 |
11/15/2023 |
MODIFY EXIST RAMPS, SIGNING & PAVMT MRK |
SYNERGY PROJECT CONTRACTORS, INC.($1,650,011) |
|
6372-89-001 |
EL PASO |
EL PASO |
$1,368,917 |
SL0375 |
RMC - 637289001 |
12/02/2020 |
11/15/2023 |
RMVL AND PROPOSED CHAIN LINK FENCE |
INTERNATIONAL EAGLE ENTERPRISES, INC.($1,077,631) |
|
2121-02-174 |
EL PASO |
EL PASO |
$2,526,198 |
IH 10 |
C 2121-2-174 |
12/02/2020 |
11/15/2023 |
INSTL OF CONC TRAF BARRIER |
J. A. R. CONCRETE, INC.($2,186,645) |
|
6373-74-001 |
EL PASO |
EL PASO |
$873,830 |
IH0010 |
RMC - 637374001 |
12/02/2020 |
11/15/2023 |
METAL BEAM, CHAINLINK FENCE & ROCK WALL REPAIR |
APACHE BARRICADE & SIGN($728,750) |
|
6372-23-001 |
EL PASO |
EL PASO |
$873,811 |
IH0010 |
RMC - 637223001 |
11/04/2020 |
11/15/2023 |
MBGF, CHAINLINK FENCE & ROCK WALL REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($794,293) |
|
6372-48-001 |
EL PASO |
EL PASO |
$427,500 |
IH0010 |
RMC - 637248001 |
11/04/2020 |
11/15/2023 |
BARRICADES, SIGNS AND TRAF CONTROL |
APACHE BARRICADE & SIGN($342,860) |
|
2121-06-047 |
HUDSPETH |
EL PASO |
$1,122,167 |
IH 10 |
STP 2B20(235)HES |
09/03/2020 |
11/15/2023 |
INSTL ADVANCE WARN SIGNS/CHEVRONS |
PMI PAVEMENT MARKING, LLC($960,979) |
|
6363-57-001 |
EL PASO |
EL PASO |
$379,752 |
IH0010 |
RMC - 636357001 |
09/03/2020 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
INTERNATIONAL EAGLE ENTERPRISES, INC.($486,280) |
|
6363-58-001 |
EL PASO |
EL PASO |
$309,295 |
IH0010 |
RMC - 636358001 |
09/03/2020 |
11/15/2023 |
MISCELLANEOUS CONC REPAIR |
E. G. L. CONSTRUCTION, INC.($363,194) |
|
6346-00-001 |
EL PASO |
EL PASO |
$34,900 |
SL0375 |
RMC - 634600001 |
08/31/2020 |
11/15/2023 |
PICNIC AREA MAINT |
SYNERGY PROJECT CONTRACTORS, INC.($38,736) |
|
6344-59-001 |
CULBERSON |
EL PASO |
$61,930 |
IH0010 |
RMC - 634459001 |
08/31/2020 |
11/15/2023 |
PICNIC AREA MAINT |
ABOVE ALL CONSTRUCTION($53,100) |
|
6363-60-001 |
HUDSPETH |
EL PASO |
$47,490 |
US0062 |
RMC - 636360001 |
08/31/2020 |
11/15/2023 |
PICNIC AREA MAINT |
ABOVE ALL CONSTRUCTION($42,000) |
|
0167-01-117 |
EL PASO |
EL PASO |
$1,458,170 |
US 54 |
STP 2B20(101)HES |
08/06/2020 |
11/15/2023 |
MODIFY EXIST RAMPS, SIGNING & PAVMT MRK |
MARTINEZ BROS. CONTRACTORS, LLC($1,639,703) |
|
0957-01-019 |
HUDSPETH |
EL PASO |
$582,867 |
FM 192 |
BR 2B20(113) |
08/05/2020 |
11/15/2023 |
INSTL OF BOX CULVERT AND ROADWAY APPROACHES |
INTERNATIONAL EAGLE ENTERPRISES, INC.($423,112) |
|
2121-02-174 |
EL PASO |
EL PASO |
$2,536,214 |
IH 10 |
C 2121-2-174 |
08/05/2020 |
11/15/2023 |
INSTL OF CONC TRAF BARRIER |
SYNERGY PROJECT CONTRACTORS, INC.($2,235,502) |
|
2121-02-171 |
EL PASO |
EL PASO |
$645,428 |
IH 10 |
C 2121-2-171 |
07/09/2020 |
11/15/2023 |
GREEN RIBBON LANDSCAPE IMPRV |
INTERNATIONAL EAGLE ENTERPRISES, INC.($507,007) |
|
2121-05-051 |
EL PASO |
EL PASO |
$5,397,225 |
IH 10 |
C 2121-5-51 |
07/08/2020 |
11/15/2023 |
INSTL MEDIAN CABLE BARRIER |
LESNA CONSTRUCTION, INC.($4,020,480) |
|
2552-02-034 |
EL PASO |
EL PASO |
$982,043 |
SL 375 |
C 2552-2-34 |
06/04/2020 |
11/15/2023 |
MILL & OVERLAY CLEANING/RESEAL BRIDGE JOINTS |
DAN WILLIAMS COMPANY($777,686) |
|
6359-28-001 |
EL PASO |
EL PASO |
$2,828,049 |
SL0375 |
RMC - 635928001 |
05/08/2020 |
11/15/2023 |
REHAB OF ROADWAY |
J. A. R. CONCRETE, INC.($2,225,975) |
|
6339-57-001 |
EL PASO |
EL PASO |
$526,870 |
US0054 |
BPM - 633957001 |
05/08/2020 |
11/15/2023 |
BPM |
MARTINEZ BROS. CONTRACTORS, LLC($485,855) |
|
0002-05-050 |
HUDSPETH |
EL PASO |
$2,203,954 |
IH 10 |
C 2-5-50 |
05/08/2020 |
11/15/2023 |
REPLACE SUBSTANDARD METAL BEAM GUARD FENCE |
SYNERGY PROJECT CONTRACTORS, INC.($1,883,865) |
|
6361-89-001 |
CULBERSON |
EL PASO |
$456,700 |
US0062 |
RMC - 636189001 |
05/07/2020 |
11/15/2023 |
FLEXIBLE PAVMT REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($431,376) |
|
0924-06-601 |
EL PASO |
EL PASO |
$2,896,650 |
VA |
C 924-6-601 |
05/07/2020 |
11/15/2023 |
FY 2020 BRIDGE MAINT (EL PASO COUNTY) |
J.D. ABRAMS, L.P.($2,570,503) |
|
6361-88-001 |
EL PASO |
EL PASO |
$740,500 |
IH0010 |
RMC - 636188001 |
05/07/2020 |
11/15/2023 |
CLEANING & SWEEPING |
E. G. L. CONSTRUCTION, INC.($605,650) |
|
6361-90-001 |
EL PASO |
EL PASO |
$201,450 |
IH0010 |
RMC - 636190001 |
04/29/2020 |
11/15/2023 |
STORM SEWER & CULVERT CLEANING |
SYNERGY PROJECT CONTRACTORS, INC.($192,888) |
|
6353-31-001 |
EL PASO |
EL PASO |
$184,600 |
IH0010 |
RMC - 635331001 |
04/29/2020 |
11/15/2023 |
STORM SEWER & CULVERT CLEANING |
MARTINEZ BROS. CONTRACTORS, LLC($174,240) |
|
0924-06-603 |
EL PASO |
EL PASO |
$1,876,431 |
VA |
NH 2020(773) |
04/09/2020 |
11/15/2023 |
FY 2020 SIGNING PROJECT |
TRI STATE ELECTRIC, LTD.($1,766,831) |
|
0167-01-120 |
EL PASO |
EL PASO |
$993,343 |
US 54 |
NH 2020(874) |
04/09/2020 |
11/15/2023 |
MILL AND INLAY (FRONTAGE ROAD) |
ALLIED PAVING CO.($719,532) |
|
6349-88-001 |
CULBERSON |
EL PASO |
$213,835 |
IH0010 |
RMC - 634988001 |
03/25/2020 |
11/15/2023 |
METAL BEAM GUARDRAIL REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($266,840) |
|
6349-85-001 |
CULBERSON |
EL PASO |
$200,365 |
IH0010 |
RMC - 634985001 |
11/12/2019 |
11/15/2023 |
BARRICADES, SIGNS, TRAF CONTROL |
NIXON ENGINEERING($247,750) |
|
6341-64-001 |
EL PASO |
EL PASO |
$184,150 |
IH0010 |
RMC - 634164001 |
03/14/2019 |
09/27/2024 |
STORM SEWER & CULVERT CLEANING |
INTERNATIONAL EAGLE ENTERPRISES, INC.($209,730) |
|
6341-01-001 |
EL PASO |
EL PASO |
$536,950 |
IH0010 |
RMC - 634101001 |
02/06/2019 |
11/15/2023 |
ROADWAY SPALL & FULL DEPTH REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($542,137) |
|
6341-00-001 |
EL PASO |
EL PASO |
$649,470 |
IH0010 |
RMC - 634100001 |
02/06/2019 |
11/15/2023 |
ROADWAY SPALL & FULL DEPTH REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($689,827) |
|
6339-72-001 |
EL PASO |
EL PASO |
$446,650 |
IH0010 |
RMC - 633972001 |
01/09/2019 |
11/15/2023 |
BARRICADES, SIGNS AND TRAF CONTROL |
NIXON ENGINEERING($401,465) |
|
6339-47-001 |
EL PASO |
EL PASO |
$561,178 |
IH0010 |
RMC - 633947001 |
01/09/2019 |
11/15/2023 |
METAL BEAM GUARD FENCE |
APACHE BARRICADE & SIGN($647,900) |
|
6321-74-001 |
EL PASO |
EL PASO |
$212,900 |
IH0010 |
RMC - 632174001 |
01/08/2019 |
11/15/2023 |
STORM SEWER & CULVERT CLEANING |
INTERNATIONAL EAGLE ENTERPRISES, INC.($174,100) |
|
6339-71-001 |
EL PASO |
EL PASO |
$440,200 |
IH0010 |
RMC - 633971001 |
01/08/2019 |
11/15/2023 |
BARRICADES, SIGNS AND TRAF CONTROL |
APACHE BARRICADE & SIGN($417,400) |
|
6336-69-001 |
EL PASO |
EL PASO |
$433,130 |
IH0010 |
RMC - 633669001 |
12/06/2018 |
11/15/2023 |
PATHOLE REPAIR |
MIJELUM($394,551) |
|
6336-71-001 |
EL PASO |
EL PASO |
$435,180 |
IH0010 |
RMC - 633671001 |
12/06/2018 |
11/15/2023 |
ROADWAY POTHOLE REPAIR |
SYNERGY PROJECT CONTRACTORS, INC.($458,334) |