DALLAS IH 20 (2374-03-094)

Items: 43

County: DALLAS
Length: N/A
Highway: IH 20
District: DALLAS
Control Number: 2374-03-094
DBE Goal: N/A
Project: NH 2020(719)
Guaranty: N/A
Time: 149 WORKING DAYS
Engineer's Estimate: $5,845,940.70
Date: 04/09/2020 (6 years ago)
Contract Number: N/A
Type: FOR THE CONSTRUCTION OF BRIDGE DECK REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$5,845,940.70
$4,328,705.98
Over/Under Est: -25.95% -$1,517,234.72
Over/Under Est: -23.05% -$1,347,309.96
Amt Left: 3.93% $169,924.76
Over/Under Est: -10.3% -$601,966.19
Amt Left: 21.14% $915,268.53
Delta: -16.57% -$745,343.77
Over/Under Est: -1.47% -$86,112.02
Amt Left: 33.06% $1,431,122.70
Delta: -9.84% -$515,854.17
Over/Under Est: 8.84% $516,689.30
Amt Left: 46.99% $2,033,924.02
Delta: -10.47% -$602,801.32
Over/Under Est: 46.29% $2,706,210.35
Amt Left: 97.57% $4,223,445.07
Delta: -34.41% -$2,189,521.05

Bid Items & Bid Tabulations

43 Total 0 of 43
DALLAS  |  IH 20  |  DALLAS  |  2374-03-094  |  04/09/2020  |  $5,845,940.70  |  NH 2020(719)  |  FOR THE CONSTRUCTION OF BRIDGE DECK...  |  149 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SILVER CREEK CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
RAGLE CONSTRUCTION, INC.
HIGHWAY 19 CONSTRUCTION LLC
SOUTHERN ROAD & BRIDGE, LLC
SEMA CONSTRUCTION, INC.
CL C CONC (ABUT)(EXTEND)
CY 1.800 $4,000.000 $4,500.000 $21,000.000 $5,000.000 $10,000.000 $5,000.000 $18,500.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 5,825.000 $30.000 $10.000 $17.000 $6.000 $50.000 $25.000 $25.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 3,100.000 $70.000 $60.000 $50.000 $120.000 $200.000 $250.000 $160.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 2,900.000 $160.000 $100.000 $75.000 $150.000 $200.000 $288.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,840.000 $245.000 $120.000 $160.000 $155.000 $300.000 $250.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 191.000 $450.000 $450.000 $500.000 $550.000 $600.000 $750.000 $625.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,158.000 $45.000 $25.000 $44.000 $23.000 $55.000 $50.000 $55.000
CONCRETE OVERLAY (2 IN)
SY 14,051.000 $95.000 $102.000 $68.750 $100.000 $81.000 $88.000 $125.000
MULTI-LAYER POLYMER OVERLAY
SY 2,606.000 $50.000 $32.000 $21.000 $45.000 $55.000 $75.000 $90.000
MILLING CONCRETE SLAB (1 IN)
SY 14,051.000 $6.500 $8.680 $7.150 $4.500 $10.000 $6.000 $20.000
HYDRO-DEMOLITION (1 IN)
SY 14,051.000 $115.000 $50.000 $92.000 $75.000 $45.000 $58.000 $125.000
MOBILIZATION
LS 1.000 $570,000.000 $432,000.000 $449,000.000 $550,000.000 $700,000.000 $650,000.000 $847,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $50,000.000 $25,000.000 $42,000.000 $72,000.000 $60,000.000 $88,000.000 $220,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 500.000 $6.000 $4.000 $6.000 $5.210 $5.000 $10.000 $5.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 500.000 $2.000 $1.000 $4.000 $1.440 $5.000 $5.000 $1.500
MTL W-BEAM GD FEN (TIM POST)
LF 3,787.500 $25.000 $25.000 $20.350 $18.500 $21.000 $30.000 $20.000
MTL THRIE-BEAM GD FEN (TIM POST)
EA 8.000 $800.000 $1,800.000 $1,650.000 $1,500.000 $2,000.000 $1,800.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 4,137.000 $3.000 $2.000 $2.590 $2.350 $3.000 $5.000 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $3,000.000 $2,860.000 $2,600.000 $2,800.000 $3,000.000 $2,750.000
REMOVE RD IL ASM (U/P)
EA 24.000 $235.000 $350.000 $361.350 $250.000 $380.000 $300.000 $1,000.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $1,000.000 $1,400.000 $1,378.960 $1,350.000 $1,180.000 $1,500.000 $3,000.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 8.000 $1,200.000 $1,500.000 $1,534.830 $1,500.000 $1,108.000 $2,000.000 $3,000.000
CONDT (RM) (3/4")
LF 521.000 $10.000 $40.000 $32.210 $12.150 $13.000 $15.000 $35.000
ELEC CONDR (NO.8) BARE
LF 521.000 $1.000 $2.000 $1.830 $1.570 $0.890 $2.000 $1.650
ELEC CONDR (NO.8) INSULATED
LF 521.000 $1.500 $2.000 $2.050 $1.570 $0.890 $2.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 222.000 $10.000 $8.000 $5.000 $1.110 $1.000 $5.000 $2.000
PAVEMENT SEALER 4"
LF 19,854.000 $0.300 $0.500 $0.110 $0.500 $0.500 $1.000 $0.600
PAVEMENT SEALER 6"
LF 600.000 $0.500 $1.000 $0.170 $1.000 $1.000 $2.000 $1.100
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 140.000 $1.000 $2.000 $0.830 $2.000 $2.000 $1.000 $2.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 9,857.000 $1.000 $2.000 $0.830 $2.000 $2.000 $1.000 $2.100
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 600.000 $1.000 $2.000 $1.320 $2.000 $2.000 $2.000 $2.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,857.000 $1.000 $2.000 $0.830 $2.000 $2.000 $1.000 $2.100
REFL PAV MRKR TY II-C-R
EA 15.000 $6.600 $50.000 $5.500 $50.000 $50.000 $30.000 $52.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,966.000 $0.800 $2.000 $1.100 $2.000 $2.000 $1.500 $2.100
ELIM EXT PAV MRK & MRKS (6")
LF 600.000 $1.000 $3.000 $2.200 $3.000 $3.000 $1.500 $3.200
PAV SURF PREP FOR MRK (4")
LF 19,854.000 $0.300 $0.200 $0.060 $0.200 $0.200 $0.500 $0.250
PAV SURF PREP FOR MRK (6")
LF 600.000 $0.600 $0.500 $0.090 $0.500 $0.500 $0.500 $0.600
CLEANING / SWEEPING (HANDWORK)
SY 50.000 $50.000 $200.000 $110.000 $10.000 $300.000 $100.000 $800.000
BRIDGE JOINT REPAIR (ARMOR)
LF 264.000 $450.000 $600.000 $610.000 $300.000 $350.000 $550.000 $275.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $11,000.000 $10,000.000 $15,000.000 $15,000.000 $10,000.000 $10,000.000 $17,500.000
TMA (STATIONARY)
DAY 150.000 $200.000 $400.000 $200.000 $350.000 $250.000 $250.000 $250.000
TMA (MOBILE OPERATION)
HR 8.000 $65.000 $75.000 $100.000 $125.000 $1,000.000 $100.000 $100.000
TEMPORARY QUEUE DETECTION SYSTEM
DAY 8.000 $300.000 $2,500.000 $1,550.000 $2,000.000 $5,000.000 $300.000 $1,650.000
Totals: $5,845,940.700 $4,328,705.980 $4,498,630.745 $5,243,974.510 $5,759,828.680 $6,362,630.000 $8,552,151.050