Job Info for 0054-03-027

County: COLEMAN Highway: US 84 Date: 01/04/2024 (10 months ago) Engineer's Estimate: $16,227,563 Control Number: 0054-03-027
Project: C 54-3-27 District: BROWNWOOD Time: 89 WORKING DAYS Type: RESURFACE ROADWAY
Bidder's List
Informational:
Email All | Notice | Questions
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $16,227,562.50
ALLEN KELLER COMPANY   $14,784,351.67 1
-8.89% | -$1,443,210.83
DUININCK, INC.   $16,657,612.21 2
2.65% | $430,049.71
12.67% | $1,873,260.54
CK NEWBERRY, LLC   $19,762,633.40 3
21.78% | $3,535,070.90
33.67% | $4,978,281.73
18.64% | $3,105,021.19
Subcontractor Percentage Amount
TEXOP CONSTRUCTION 3.69% $545,542.58
D. I. J. CONSTRUCTION, INC. 3.41% $504,146.39
GIBSON & ASSOCIATES, INC. 1.34% $198,110.31
PROFESSIONAL TRAFFIC CONTROL LLC 0.23% $34,004.01
PENHALL COMPANY 0.08% $11,827.48
NELSON INDUSTRIAL SERVICES, INC. 0.03% $4,435.31
Total: 8.78% $1,298,066.08

Bid Items

Items: 43, 0 filtered
COLEMAN US 84  |  BROWNWOOD  |  0054-03-027  |  01/04/2024  |  $16,227,563  |  C 54-3-27  |  RESURF ROADWAY  |  89 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate ALLEN KELLER COMPANY DUININCK, INC. CK NEWBERRY, LLC
110 6001 EXCAVATION (ROADWAY) CY 441.000 $15.000 $33.610 $46.000 $75.000
150 6001 BLADING STA 1,128.000 $144.000 $39.180 $150.000 $300.000
316 6224 AGGR(TY-PB GR-4 SAC-B) CY 5,347.000 $180.000 $175.010 $180.000 $125.000
316 6405 ASPH (AC-20-5TR OR AC-20XP) GAL 180,361.000 $5.500 $4.590 $4.300 $4.250
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 21,500.000 $42.500 $40.850 $56.500 $75.000
354 6051 PLANE ASPH CONC PAV (0" TO 1 1/2") SY 642,656.000 $2.250 $1.140 $2.100 $2.000
354 6064 PLANE ASPH CONC PAV (2 1/2") SY 3,164.000 $3.000 $4.580 $4.650 $5.250
354 6127 PLANE ASPH CONC PAV (1.5" TO 4") SY 1,244.000 $4.500 $8.480 $10.000 $15.000
438 6002 CLEANING AND SEALING EXIST JOINTS(CL3) LF 176.000 $40.000 $81.810 $50.500 $75.000
438 6004 CLEANING AND SEALING EXIST JOINTS(CL7) LF 406.000 $38.000 $81.810 $36.000 $85.000
439 6013 MULTI-LAYER POLYMER OVERLAY SY 3,164.000 $40.000 $49.110 $38.000 $50.000
483 6013 SHOT BLASTING SY 3,164.000 $5.000 $6.250 $3.700 $10.000
500 6001 MOBILIZATION LS 1.000 $1,200,000.000 $1,050,000.000 $1,600,000.000 $1,800,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $8,000.000 $5,536.680 $70,000.000 $25,000.000
530 6008 TURNOUTS (ACP) SY 758.000 $80.000 $125.520 $30.500 $50.000
533 6003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 224,890.000 $0.200 $0.070 $0.120 $0.250
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 116,695.000 $0.400 $0.070 $0.160 $0.250
662 6005 WK ZN PAV MRK NON-REMOV (W)6"(BRK) LF 35,488.000 $1.000 $0.400 $0.410 $0.500
662 6008 WK ZN PAV MRK NON-REMOV (W)6"(SLD) LF 226,247.000 $0.300 $0.340 $0.260 $0.500
662 6035 WK ZN PAV MRK NON-REMOV (Y)6"(BRK) LF 9,478.000 $0.300 $0.400 $0.410 $0.500
662 6037 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) LF 180,053.000 $0.250 $0.380 $0.260 $0.500
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 9,414.000 $1.000 $2.780 $1.450 $1.500
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 50,251.000 $1.200 $3.060 $1.450 $2.000
666 6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 703.000 $1.250 $1.300 $2.050 $2.500
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 1,357.000 $1.100 $1.300 $1.250 $1.200
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 154.000 $7.000 $13.640 $6.650 $10.000
666 6054 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 10.000 $145.000 $215.880 $145.000 $225.000
666 6078 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 4.000 $175.000 $386.310 $195.000 $250.000
666 6102 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 20.000 $40.000 $56.810 $66.500 $85.000
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 35,488.000 $0.550 $0.810 $0.870 $0.800
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 224,890.000 $0.550 $0.780 $0.720 $0.800
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 9,478.000 $0.850 $0.800 $0.870 $0.800
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 189,654.000 $0.850 $0.790 $0.720 $0.800
672 6007 REFL PAV MRKR TY I-C EA 1,458.000 $4.000 $4.830 $4.100 $6.000
672 6009 REFL PAV MRKR TY II-A-A EA 2,033.000 $3.500 $4.830 $4.100 $6.000
672 6012 TRAFFIC BUTTON TY I-C EA 282.000 $4.000 $4.830 $4.100 $4.000
3076 6001 D-GR HMA TY-B PG64-22 TON 870.000 $135.000 $138.930 $170.000 $175.000
3076 6051 D-GR HMA TY-D PG76-22 (LEVEL-UP) TON 1,120.000 $135.000 $153.130 $165.000 $200.000
3076 6066 TACK COAT GAL 1,026.000 $6.000 $5.080 $7.500 $8.500
3077 6034 SP MIXES SP-C SAC-B PG76-22 TON 74,077.000 $125.000 $118.560 $120.100 $155.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 180.000 $100.000 $186.940 $130.000 $200.000
6185 6002 TMA (STATIONARY) DAY 150.000 $300.000 $246.350 $300.000 $400.000
6185 6003 TMA (MOBILE OPERATION) HR 160.000 $80.000 $107.940 $110.000 $60.000
Totals: $16,227,562.50 $14,784,351.67 $16,657,612.21 $19,762,633.40