PREPARING ROW
|
STA
|
41.000
|
$3,301.000
|
$30,996.000
|
$149,094.340
|
$10,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
5,288.000
|
$15.000
|
$4.980
|
$19.000
|
$16.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
326.000
|
$80.000
|
$13.040
|
$30.000
|
$11.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
312.000
|
$24.000
|
$14.540
|
$30.000
|
$13.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
4,780.000
|
$18.000
|
$8.010
|
$6.000
|
$12.000
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
347.000
|
$25.000
|
$7.660
|
$32.000
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
145,364.000
|
$11.000
|
$7.500
|
$8.000
|
$20.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
718,050.000
|
$23.000
|
$22.000
|
$21.000
|
$45.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
217,336.000
|
$2.900
|
$0.220
|
$1.800
|
$5.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
217,336.000
|
$0.200
|
$0.180
|
$0.180
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
3,530.000
|
$31.400
|
$30.080
|
$38.000
|
$34.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
1,810.000
|
$1.300
|
$1.000
|
$1.000
|
$2.000
|
|
|
CEM TRT(PLNT MX) (CL M)(TY A)(GR 4)(6")
|
SY
|
130,615.000
|
$25.000
|
$15.510
|
$15.000
|
$27.000
|
|
|
CMT TRT(PLNT MX)(CL M)(TY A)(GR 4) 10"
|
SY
|
101.000
|
$55.000
|
$63.750
|
$80.000
|
$76.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
32,668.000
|
$6.000
|
$4.420
|
$4.250
|
$4.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
8,592.000
|
$95.000
|
$88.510
|
$67.000
|
$137.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
108,974.000
|
$120.000
|
$86.610
|
$69.000
|
$147.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,230.000
|
$200.000
|
$141.060
|
$100.000
|
$244.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,367.000
|
$14.000
|
$5.530
|
$9.000
|
$4.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
540.000
|
$136.000
|
$153.600
|
$200.000
|
$135.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
2,388.000
|
$315.000
|
$281.370
|
$300.000
|
$267.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
279.000
|
$200.000
|
$162.000
|
$340.000
|
$341.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
472.000
|
$290.000
|
$206.000
|
$206.000
|
$458.000
|
|
|
CL B CONC (MISC)
|
CY
|
8.000
|
$6,000.000
|
$969.470
|
$1,200.000
|
$900.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
288.600
|
$1,500.000
|
$816.400
|
$2,200.000
|
$2,072.000
|
|
|
CL C CONC (BENT)(HPC)
|
CY
|
166.200
|
$2,412.000
|
$985.100
|
$3,000.000
|
$2,442.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
146.600
|
$1,700.000
|
$1,286.110
|
$1,900.000
|
$1,273.000
|
|
|
REINF CONC SLAB
|
SF
|
56,120.000
|
$32.000
|
$21.760
|
$33.500
|
$31.000
|
|
|
APPROACH SLAB
|
CY
|
408.400
|
$755.000
|
$603.880
|
$960.000
|
$826.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
94,528.000
|
$70.000
|
$49.660
|
$79.000
|
$63.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
3,221.890
|
$269.000
|
$187.420
|
$190.000
|
$253.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
4,539.320
|
$269.000
|
$181.230
|
$195.000
|
$251.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
78,551.000
|
$2.000
|
$1.000
|
$0.990
|
$2.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
851.000
|
$550.000
|
$416.120
|
$465.000
|
$610.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
14.000
|
$1,236.000
|
$1,106.980
|
$485.000
|
$794.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
21.000
|
$997.000
|
$913.310
|
$465.200
|
$789.000
|
|
|
RIPRAP (STONE TY R)(DRY)(6 IN)
|
CY
|
92.000
|
$172.000
|
$226.000
|
$324.160
|
$725.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
662.000
|
$535.000
|
$587.190
|
$490.000
|
$650.000
|
|
|
RAIL (TY SSTR)
|
LF
|
2,760.000
|
$110.000
|
$101.510
|
$50.000
|
$124.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
1,420.000
|
$215.000
|
$70.770
|
$100.000
|
$155.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
378.000
|
$230.000
|
$183.900
|
$273.000
|
$275.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,070.000
|
$100.000
|
$96.200
|
$120.000
|
$131.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
975.000
|
$109.000
|
$134.710
|
$140.000
|
$158.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
322.000
|
$250.000
|
$157.250
|
$180.000
|
$279.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
5.000
|
$8,128.000
|
$7,694.240
|
$6,500.000
|
$11,497.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
8.000
|
$9,360.000
|
$7,749.500
|
$6,800.000
|
$12,399.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
8.000
|
$9,339.000
|
$7,749.500
|
$8,000.000
|
$12,825.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
8.000
|
$10,532.000
|
$9,214.430
|
$8,200.000
|
$14,241.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
8.000
|
$5,630.000
|
$4,505.520
|
$7,000.000
|
$13,213.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
9.000
|
$9,122.000
|
$8,082.900
|
$11,000.000
|
$18,624.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,964.000
|
$1,401.180
|
$2,500.000
|
$8,628.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$6,226.000
|
$4,074.850
|
$5,500.000
|
$12,392.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
13.000
|
$5,254.000
|
$3,542.610
|
$4,000.000
|
$8,658.000
|
|
|
ADJUSTING MANHOLES(CAP)
|
EA
|
3.000
|
$3,022.000
|
$3,541.310
|
$5,100.000
|
$7,307.000
|
|
|
REMOV STR (INLET)
|
EA
|
11.000
|
$1,252.000
|
$825.580
|
$2,500.000
|
$1,539.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$1,328.000
|
$752.750
|
$2,500.000
|
$2,276.000
|
|
|
REMOV STR (PIPE)
|
LF
|
830.000
|
$23.000
|
$14.040
|
$65.000
|
$51.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,971,140.570
|
$5,337,848.410
|
$6,174,614.410
|
$3,300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
36.000
|
$9,690.000
|
$4,811.380
|
$7,400.000
|
$5,173.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,151.000
|
$100.000
|
$35.500
|
$35.500
|
$36.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,151.000
|
$9.500
|
$8.000
|
$8.000
|
$16.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
440.000
|
$36.500
|
$36.680
|
$36.680
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
440.000
|
$9.500
|
$10.000
|
$10.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,390.000
|
$5.700
|
$3.000
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,362.000
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
1,972.000
|
$2.000
|
$6.000
|
$6.000
|
$9.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
597.000
|
$95.000
|
$113.960
|
$130.000
|
$123.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
28,151.000
|
$18.000
|
$17.360
|
$8.000
|
$11.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
10,110.000
|
$13.000
|
$6.170
|
$6.000
|
$8.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
13,440.000
|
$10.000
|
$5.640
|
$5.000
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$10.000
|
$7.220
|
$8.000
|
$13.000
|
|
|
PORT CTB CONNECT HARDWARE
|
EA
|
492.000
|
$95.000
|
$50.040
|
$90.000
|
$54.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
480.000
|
$200.000
|
$130.740
|
$80.000
|
$234.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
3,076.000
|
$135.000
|
$78.570
|
$72.940
|
$129.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
9,121.000
|
$47.000
|
$55.790
|
$26.960
|
$41.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
271.000
|
$139.000
|
$84.330
|
$80.080
|
$126.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
499.000
|
$172.000
|
$59.610
|
$67.160
|
$91.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
4.000
|
$2,809.000
|
$2,731.710
|
$1,932.000
|
$3,954.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
4.000
|
$1,600.000
|
$2,731.710
|
$2,100.000
|
$3,114.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
12.000
|
$7,939.000
|
$4,715.550
|
$3,900.000
|
$4,048.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
8,765.000
|
$35.000
|
$27.000
|
$27.000
|
$57.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,639.000
|
$2,200.000
|
$2,200.000
|
$2,879.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$1,440.000
|
$1,100.000
|
$1,100.000
|
$1,156.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$3,489.000
|
$2,850.000
|
$2,850.000
|
$3,186.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
7.000
|
$2,667.000
|
$1,000.000
|
$1,000.000
|
$1,145.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
14.000
|
$1,313.000
|
$900.000
|
$900.000
|
$1,190.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
14.000
|
$9,000.000
|
$7,550.000
|
$7,550.000
|
$6,935.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
7.000
|
$3,200.000
|
$3,888.000
|
$3,888.000
|
$3,380.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$1,106.000
|
$645.000
|
$645.000
|
$500.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
16.000
|
$1,587.000
|
$2,225.000
|
$2,225.000
|
$2,200.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
43.000
|
$4,550.000
|
$4,600.000
|
$4,600.000
|
$4,570.000
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
9.000
|
$7,300.000
|
$5,135.000
|
$5,135.000
|
$5,100.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
17,610.000
|
$15.000
|
$20.000
|
$20.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,685.000
|
$30.000
|
$45.000
|
$45.000
|
$62.000
|
|
|
CONDT (RM) (1 1/2")
|
LF
|
310.000
|
$32.000
|
$16.000
|
$16.000
|
$40.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
32,544.000
|
$3.000
|
$1.500
|
$1.500
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
65,574.000
|
$1.850
|
$1.750
|
$1.750
|
$2.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
71.000
|
$1,300.000
|
$1,350.000
|
$1,350.000
|
$1,680.000
|
|
|
INSTL GND BX(W/SECURE LIDS/DIST KEYING)
|
EA
|
43.000
|
$2,662.000
|
$2,600.000
|
$2,600.000
|
$1,650.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
|
EA
|
9.000
|
$8,999.000
|
$6,540.000
|
$6,540.000
|
$7,700.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,768.250
|
$31.000
|
$26.900
|
$27.770
|
$29.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
39.000
|
$725.000
|
$661.000
|
$635.000
|
$703.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
17.000
|
$925.000
|
$865.000
|
$715.000
|
$920.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$907.000
|
$870.000
|
$840.000
|
$925.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
1.000
|
$927.000
|
$693.000
|
$690.000
|
$737.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
4.000
|
$884.000
|
$926.000
|
$765.000
|
$985.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
6.000
|
$800.000
|
$864.000
|
$745.000
|
$919.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
15.000
|
$400.000
|
$1,054.000
|
$905.000
|
$1,121.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
14.000
|
$900.000
|
$1,250.000
|
$1,070.000
|
$1,330.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
3.000
|
$400.000
|
$893.000
|
$800.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
1.000
|
$400.000
|
$1,012.000
|
$960.000
|
$1,076.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
|
EA
|
4.000
|
$1,650.000
|
$2,200.000
|
$2,325.000
|
$2,340.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
8.000
|
$2,000.000
|
$1,965.000
|
$3,000.000
|
$2,090.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,000.000
|
$2,012.000
|
$3,000.000
|
$2,140.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
12.000
|
$537.000
|
$660.000
|
$565.000
|
$702.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
56.000
|
$126.000
|
$90.000
|
$105.000
|
$96.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
9,495.630
|
$10.000
|
$5.600
|
$5.180
|
$6.000
|
|
|
REMOVE LRSA
|
EA
|
7.000
|
$950.000
|
$870.000
|
$921.540
|
$925.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
56.000
|
$30.000
|
$60.000
|
$50.000
|
$64.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
15.000
|
$14.000
|
$24.000
|
$20.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
156.000
|
$22.000
|
$24.000
|
$20.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
7.000
|
$5.000
|
$24.000
|
$20.500
|
$26.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
82.000
|
$49.000
|
$62.000
|
$38.000
|
$66.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
15.000
|
$80.000
|
$62.000
|
$38.000
|
$66.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
19,006.000
|
$1.300
|
$0.450
|
$0.450
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
11,424.000
|
$1.900
|
$1.490
|
$1.490
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(DOT)
|
LF
|
110.000
|
$1.600
|
$2.540
|
$2.540
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
16,567.000
|
$1.400
|
$0.840
|
$0.840
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
5.000
|
$285.000
|
$252.000
|
$252.000
|
$267.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
8.000
|
$403.000
|
$315.900
|
$315.900
|
$335.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
16.000
|
$383.000
|
$270.000
|
$270.000
|
$286.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
92.000
|
$63.000
|
$74.700
|
$74.700
|
$79.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
164.000
|
$8.000
|
$4.500
|
$4.500
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
32.000
|
$13.000
|
$7.560
|
$7.560
|
$8.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,849.000
|
$11.000
|
$4.500
|
$4.500
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
54,480.000
|
$3.000
|
$0.360
|
$0.360
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
6,190.000
|
$3.000
|
$0.570
|
$0.570
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
380.000
|
$3.000
|
$1.870
|
$1.870
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
80.000
|
$16.000
|
$4.500
|
$4.500
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
109,700.000
|
$0.500
|
$0.150
|
$0.150
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
16,483.000
|
$0.400
|
$0.100
|
$0.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
4,711.000
|
$0.800
|
$0.230
|
$0.230
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
352.000
|
$14.500
|
$2.970
|
$2.970
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
5.000
|
$100.000
|
$34.200
|
$34.200
|
$36.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
8.000
|
$33.200
|
$38.250
|
$38.250
|
$41.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
16.000
|
$100.000
|
$45.000
|
$45.000
|
$48.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
16.000
|
$58.000
|
$22.500
|
$22.500
|
$24.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
196.000
|
$5.100
|
$0.470
|
$0.470
|
$1.000
|
|
|
REMOVAL OF CABLES
|
LF
|
9,842.000
|
$4.000
|
$0.750
|
$0.750
|
$1.000
|
|
|
CONCRETE RAIL REPAIR (MISC)
|
LF
|
600.000
|
$303.000
|
$77.870
|
$500.000
|
$41.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
45.000
|
$168.000
|
$400.000
|
$400.000
|
$403.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
14,380.000
|
$125.000
|
$126.500
|
$126.500
|
$128.000
|
|
|
TACK COAT
|
GAL
|
13,075.000
|
$4.000
|
$2.500
|
$2.500
|
$3.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
12.000
|
$149.000
|
$600.000
|
$600.000
|
$605.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$11,745.000
|
$10,693.720
|
$46,000.000
|
$26,694.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(SLD)
|
LF
|
33,737.000
|
$1.000
|
$1.130
|
$1.130
|
$1.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
10,635.000
|
$1.000
|
$0.900
|
$0.900
|
$1.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(DOT)
|
LF
|
1,471.000
|
$2.100
|
$1.890
|
$1.890
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
15,633.000
|
$4.400
|
$1.660
|
$1.660
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(DOT)
|
LF
|
850.000
|
$2.100
|
$1.820
|
$1.820
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
3,570.000
|
$5.800
|
$3.780
|
$3.780
|
$4.000
|
|
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
|
LF
|
1,141.000
|
$3.200
|
$7.180
|
$7.180
|
$8.000
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
352.000
|
$11.900
|
$6.300
|
$6.300
|
$7.000
|
|
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
|
LF
|
53,214.000
|
$2.400
|
$0.770
|
$0.770
|
$1.000
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
10,643.000
|
$1.600
|
$0.840
|
$0.840
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
560.000
|
$150.000
|
$374.410
|
$500.000
|
$334.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
260.000
|
$89.000
|
$102.900
|
$110.000
|
$941.000
|
|
Totals: |
$65,858,238.610
|
$53,775,774.998
|
$61,746,143.816
|
$84,184,429.320
|