Bid Cobra

BELL SL 363 (0320-06-008)

Items: 167

County: BELL
Length: N/A
Highway: SL 363
District: WACO
Control Number: 0320-06-008
DBE Goal: 500.0%
Project: F 2024(849)
Guaranty: N/A
Time: 540 WORKING DAYS
Engineer's Estimate: $65,858,238.61
Date: 02/02/2024 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT NEW ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$65,858,238.61
$53,775,774.97
Over/Under Est: -18.35% -$12,082,463.64
$61,746,143.81
Over/Under Est: -6.24% -$4,112,094.80
Amt Left: 14.82% $7,970,368.84
$84,184,429.32
Over/Under Est: 27.83% $18,326,190.71
Amt Left: 56.55% $30,408,654.35
Delta: -36.34% -$22,438,285.51
Subcontractor Percentage Amount
TEXAS CLEAR CUT LLC 5.87% $3,227,543.92
HERMANOS STEEL, LLC 4.13% $2,270,827.32
LONE STAR PAVING COMPANY 3.83% $2,105,876.19
F & W ELECTRICAL CONTRACTORS, INC. 2.55% $1,402,084.67
REYNALDO H ORTIZ LLC 2.03% $1,116,169.36
TRINITY SITE CONSTRUCTION, LLC 1.11% $610,319.21
BEAIRD DRILLING SERVICES, INC. 0.99% $544,338.75
FORTSON CONTRACTING, INC. 0.78% $428,872.96
MILLER SPRINGS MATERIALS, L.L.C. 0.73% $401,381.10
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.59% $324,403.90
TEXAS SOLUTIONS TRUCKING, INC. 0.53% $291,413.68
TRP CONSTRUCTION GROUP, LLC 0.53% $291,413.68
PINNACLE GRINDING AND GROOVING LLC 0.51% $280,416.93
GORDILLO TRANSPORTATION INC 0.47% $258,423.45
AARON CONCRETE CONTRACTORS, LLC 0.44% $241,928.33
PENHALL COMPANY 0.41% $225,433.22
SOUTH TEXAS PAINTING 0.35% $192,442.99
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.34% $186,944.62
SPEEDY PAVING 0.33% $181,446.25
TEXAS TRAFFIC AND BARRICADE, LLC 0.18% $98,970.68
SK CONCRETE SERVICES LLC 0.15% $82,475.57
PROFESSIONAL TRAFFIC CONTROL LLC 0.11% $60,482.08
AWP SAFETY 0.11% $60,482.08
TEXAS CUTTING & CORING GP, INC. 0.10% $54,983.71
STATEWIDE MATERIALS TRANSPORT, LTD. 0.09% $49,485.34
SOUTHEAST GRINDING AND GROOVING LLC 0.07% $38,488.60
PRIMATE CONSTRUCTION, LP 0.03% $16,495.11
TEXOP CONSTRUCTION 0.01% $5,498.37
GK CONSTRUCTION, LLC 0.00% $0.00
ROYAL REBAR INC 0.00% $0.00
HAYDEN CONCRETE, INC. 0.00% $0.00
Total: 27.37% $15,049,042.07

Bid Items & Bid Tabulations

167 Total 0 of 167
BELL  |  SL 363  |  WACO  |  0320-06-008  |  02/02/2024  |  $65,858,238.61  |  F 2024(849)  |  CONSTRUCT NEW ROAD  |  540 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
WEBBER, LLC
POSILLICO CIVIL, INC.
PREPARING ROW
STA 41.000 $3,301.000 $30,996.000 $149,094.340 $10,000.000
REMOVING CONC (PAV)
SY 5,288.000 $15.000 $4.980 $19.000 $16.000
REMOVING CONC (RIPRAP)
SY 326.000 $80.000 $13.040 $30.000 $11.000
REMOVING CONC (DRIVEWAYS)
SY 312.000 $24.000 $14.540 $30.000 $13.000
REMOVING CONC (CURB AND GUTTER)
LF 4,780.000 $18.000 $8.010 $6.000 $12.000
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 347.000 $25.000 $7.660 $32.000 $11.000
EXCAVATION (ROADWAY)
CY 145,364.000 $11.000 $7.500 $8.000 $20.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 718,050.000 $23.000 $22.000 $21.000 $45.000
FURNISHING AND PLACING TOPSOIL (4")
SY 217,336.000 $2.900 $0.220 $1.800 $5.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 217,336.000 $0.200 $0.180 $0.180 $1.000
VEGETATIVE WATERING
MG 3,530.000 $31.400 $30.080 $38.000 $34.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 1,810.000 $1.300 $1.000 $1.000 $2.000
CEM TRT(PLNT MX) (CL M)(TY A)(GR 4)(6")
SY 130,615.000 $25.000 $15.510 $15.000 $27.000
CMT TRT(PLNT MX)(CL M)(TY A)(GR 4) 10"
SY 101.000 $55.000 $63.750 $80.000 $76.000
PRIME COAT(MC-30 OR AE-P)
GAL 32,668.000 $6.000 $4.420 $4.250 $4.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 8,592.000 $95.000 $88.510 $67.000 $137.000
CONC PVMT (CONT REINF - CRCP) (12")
SY 108,974.000 $120.000 $86.610 $69.000 $147.000
CEM STABIL BKFL
CY 1,230.000 $200.000 $141.060 $100.000 $244.000
TRENCH EXCAVATION PROTECTION
LF 2,367.000 $14.000 $5.530 $9.000 $4.000
DRILL SHAFT (18 IN)
LF 540.000 $136.000 $153.600 $200.000 $135.000
DRILL SHAFT (36 IN)
LF 2,388.000 $315.000 $281.370 $300.000 $267.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 279.000 $200.000 $162.000 $340.000 $341.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 472.000 $290.000 $206.000 $206.000 $458.000
CL B CONC (MISC)
CY 8.000 $6,000.000 $969.470 $1,200.000 $900.000
CL C CONC (ABUT)(HPC)
CY 288.600 $1,500.000 $816.400 $2,200.000 $2,072.000
CL C CONC (BENT)(HPC)
CY 166.200 $2,412.000 $985.100 $3,000.000 $2,442.000
CL C CONC (COLUMN)(HPC)
CY 146.600 $1,700.000 $1,286.110 $1,900.000 $1,273.000
REINF CONC SLAB
SF 56,120.000 $32.000 $21.760 $33.500 $31.000
APPROACH SLAB
CY 408.400 $755.000 $603.880 $960.000 $826.000
RETAINING WALL (MSE)
SF 94,528.000 $70.000 $49.660 $79.000 $63.000
PRESTR CONC GIRDER (TX40)
LF 3,221.890 $269.000 $187.420 $190.000 $253.000
PRESTR CONC GIRDER (TX46)
LF 4,539.320 $269.000 $181.230 $195.000 $251.000
CONCRETE PAINT FINISH
SF 78,551.000 $2.000 $1.000 $0.990 $2.000
RIPRAP (CONC)(4 IN)
CY 851.000 $550.000 $416.120 $465.000 $610.000
RIPRAP (CONC)(5 IN)
CY 14.000 $1,236.000 $1,106.980 $485.000 $794.000
RIPRAP (CONC) (CL B) (4")
CY 21.000 $997.000 $913.310 $465.200 $789.000
RIPRAP (STONE TY R)(DRY)(6 IN)
CY 92.000 $172.000 $226.000 $324.160 $725.000
RIPRAP (MOW STRIP)(4 IN)
CY 662.000 $535.000 $587.190 $490.000 $650.000
RAIL (TY SSTR)
LF 2,760.000 $110.000 $101.510 $50.000 $124.000
RETROFIT RAIL (TY SSTR)
LF 1,420.000 $215.000 $70.770 $100.000 $155.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 378.000 $230.000 $183.900 $273.000 $275.000
RC PIPE (CL III)(18 IN)
LF 1,070.000 $100.000 $96.200 $120.000 $131.000
RC PIPE (CL III)(24 IN)
LF 975.000 $109.000 $134.710 $140.000 $158.000
RC PIPE (CL III)(36 IN)
LF 322.000 $250.000 $157.250 $180.000 $279.000
MANH (COMPL)(PRM)(48IN)
EA 5.000 $8,128.000 $7,694.240 $6,500.000 $11,497.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 8.000 $9,360.000 $7,749.500 $6,800.000 $12,399.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 8.000 $9,339.000 $7,749.500 $8,000.000 $12,825.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 8.000 $10,532.000 $9,214.430 $8,200.000 $14,241.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 8.000 $5,630.000 $4,505.520 $7,000.000 $13,213.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 9.000 $9,122.000 $8,082.900 $11,000.000 $18,624.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 2.000 $1,964.000 $1,401.180 $2,500.000 $8,628.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 1.000 $6,226.000 $4,074.850 $5,500.000 $12,392.000
ADJUSTING INLET (CAP)
EA 13.000 $5,254.000 $3,542.610 $4,000.000 $8,658.000
ADJUSTING MANHOLES(CAP)
EA 3.000 $3,022.000 $3,541.310 $5,100.000 $7,307.000
REMOV STR (INLET)
EA 11.000 $1,252.000 $825.580 $2,500.000 $1,539.000
REMOV STR (MANHOLE)
EA 1.000 $1,328.000 $752.750 $2,500.000 $2,276.000
REMOV STR (PIPE)
LF 830.000 $23.000 $14.040 $65.000 $51.000
MOBILIZATION
LS 1.000 $5,971,140.570 $5,337,848.410 $6,174,614.410 $3,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 36.000 $9,690.000 $4,811.380 $7,400.000 $5,173.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,151.000 $100.000 $35.500 $35.500 $36.000
ROCK FILTER DAMS (REMOVE)
LF 1,151.000 $9.500 $8.000 $8.000 $16.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 440.000 $36.500 $36.680 $36.680 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 440.000 $9.500 $10.000 $10.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,390.000 $5.700 $3.000 $3.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,362.000 $1.500 $1.000 $1.000 $1.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 1,972.000 $2.000 $6.000 $6.000 $9.000
CONSTRUCTING DETOURS
SY 597.000 $95.000 $113.960 $130.000 $123.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 28,151.000 $18.000 $17.360 $8.000 $11.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 10,110.000 $13.000 $6.170 $6.000 $8.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 13,440.000 $10.000 $5.640 $5.000 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 600.000 $10.000 $7.220 $8.000 $13.000
PORT CTB CONNECT HARDWARE
EA 492.000 $95.000 $50.040 $90.000 $54.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 480.000 $200.000 $130.740 $80.000 $234.000
LANDSCAPE PAVERS
SY 3,076.000 $135.000 $78.570 $72.940 $129.000
CONC CURB & GUTTER (TY II)
LF 9,121.000 $47.000 $55.790 $26.960 $41.000
DRIVEWAYS (CONC) (HES)
SY 271.000 $139.000 $84.330 $80.080 $126.000
CONC SIDEWALKS (4")
SY 499.000 $172.000 $59.610 $67.160 $91.000
CURB RAMPS (TY 2)
EA 4.000 $2,809.000 $2,731.710 $1,932.000 $3,954.000
CURB RAMPS (TY 7)
EA 4.000 $1,600.000 $2,731.710 $2,100.000 $3,114.000
CURB RAMPS (TY 22)
EA 12.000 $7,939.000 $4,715.550 $3,900.000 $4,048.000
MTL W-BEAM GD FEN (STEEL POST)
LF 8,765.000 $35.000 $27.000 $27.000 $57.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,639.000 $2,200.000 $2,200.000 $2,879.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 7.000 $1,440.000 $1,100.000 $1,100.000 $1,156.000
GUARDRAIL END TREATMENT (INSTALL)
EA 11.000 $3,489.000 $2,850.000 $2,850.000 $3,186.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 7.000 $2,667.000 $1,000.000 $1,000.000 $1,145.000
CRASH CUSH ATTEN (REMOVE)
EA 14.000 $1,313.000 $900.000 $900.000 $1,190.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 14.000 $9,000.000 $7,550.000 $7,550.000 $6,935.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 7.000 $3,200.000 $3,888.000 $3,888.000 $3,380.000
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $1,106.000 $645.000 $645.000 $500.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $1,587.000 $2,225.000 $2,225.000 $2,200.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 43.000 $4,550.000 $4,600.000 $4,600.000 $4,570.000
IN RD IL (TY SA) 50T-8 (400W EQ) LED
EA 9.000 $7,300.000 $5,135.000 $5,135.000 $5,100.000
CONDT (PVC) (SCH 40) (2")
LF 17,610.000 $15.000 $20.000 $20.000 $18.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,685.000 $30.000 $45.000 $45.000 $62.000
CONDT (RM) (1 1/2")
LF 310.000 $32.000 $16.000 $16.000 $40.000
ELEC CONDR (NO.8) BARE
LF 32,544.000 $3.000 $1.500 $1.500 $2.000
ELEC CONDR (NO.8) INSULATED
LF 65,574.000 $1.850 $1.750 $1.750 $2.000
GROUND BOX TY A (122311)W/APRON
EA 71.000 $1,300.000 $1,350.000 $1,350.000 $1,680.000
INSTL GND BX(W/SECURE LIDS/DIST KEYING)
EA 43.000 $2,662.000 $2,600.000 $2,600.000 $1,650.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
EA 9.000 $8,999.000 $6,540.000 $6,540.000 $7,700.000
ALUMINUM SIGNS (TY G)
SF 1,768.250 $31.000 $26.900 $27.770 $29.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 39.000 $725.000 $661.000 $635.000 $703.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 17.000 $925.000 $865.000 $715.000 $920.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $907.000 $870.000 $840.000 $925.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 1.000 $927.000 $693.000 $690.000 $737.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 4.000 $884.000 $926.000 $765.000 $985.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $800.000 $864.000 $745.000 $919.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 15.000 $400.000 $1,054.000 $905.000 $1,121.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 14.000 $900.000 $1,250.000 $1,070.000 $1,330.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 3.000 $400.000 $893.000 $800.000 $950.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $400.000 $1,012.000 $960.000 $1,076.000
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
EA 4.000 $1,650.000 $2,200.000 $2,325.000 $2,340.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 8.000 $2,000.000 $1,965.000 $3,000.000 $2,090.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,000.000 $2,012.000 $3,000.000 $2,140.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 12.000 $537.000 $660.000 $565.000 $702.000
REMOVE SM RD SN SUP&AM
EA 56.000 $126.000 $90.000 $105.000 $96.000
INSTALL LRSS (STRUCT STEEL)
LB 9,495.630 $10.000 $5.600 $5.180 $6.000
REMOVE LRSA
EA 7.000 $950.000 $870.000 $921.540 $925.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 56.000 $30.000 $60.000 $50.000 $64.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 15.000 $14.000 $24.000 $20.000 $26.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 156.000 $22.000 $24.000 $20.000 $26.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 7.000 $5.000 $24.000 $20.500 $26.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 82.000 $49.000 $62.000 $38.000 $66.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 15.000 $80.000 $62.000 $38.000 $66.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 19,006.000 $1.300 $0.450 $0.450 $1.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 11,424.000 $1.900 $1.490 $1.490 $2.000
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 110.000 $1.600 $2.540 $2.540 $3.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,567.000 $1.400 $0.840 $0.840 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 5.000 $285.000 $252.000 $252.000 $267.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 8.000 $403.000 $315.900 $315.900 $335.000
PREFAB PAV MRK TY C (W) (WORD)
EA 16.000 $383.000 $270.000 $270.000 $286.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 92.000 $63.000 $74.700 $74.700 $79.000
REFL PAV MRKR TY I-C
EA 164.000 $8.000 $4.500 $4.500 $5.000
REFL PAV MRKR TY II-A-A
EA 32.000 $13.000 $7.560 $7.560 $8.000
REFL PAV MRKR TY II-C-R
EA 1,849.000 $11.000 $4.500 $4.500 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 54,480.000 $3.000 $0.360 $0.360 $1.000
ELIM EXT PAV MRK & MRKS (8")
LF 6,190.000 $3.000 $0.570 $0.570 $1.000
ELIM EXT PAV MRK & MRKS (12")
LF 380.000 $3.000 $1.870 $1.870 $2.000
ELIM EXT PAV MRK & MRKS (24")
LF 80.000 $16.000 $4.500 $4.500 $5.000
PAV SURF PREP FOR MRK (6")
LF 109,700.000 $0.500 $0.150 $0.150 $1.000
PAV SURF PREP FOR MRK (8")
LF 16,483.000 $0.400 $0.100 $0.100 $1.000
PAV SURF PREP FOR MRK (12")
LF 4,711.000 $0.800 $0.230 $0.230 $1.000
PAV SURF PREP FOR MRK (24")
LF 352.000 $14.500 $2.970 $2.970 $3.000
PAV SURF PREP FOR MRK (ARROW)
EA 5.000 $100.000 $34.200 $34.200 $36.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 8.000 $33.200 $38.250 $38.250 $41.000
PAV SURF PREP FOR MRK (WORD)
EA 16.000 $100.000 $45.000 $45.000 $48.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 16.000 $58.000 $22.500 $22.500 $24.000
PAV SURF PREP FOR MRK (RPM)
EA 196.000 $5.100 $0.470 $0.470 $1.000
REMOVAL OF CABLES
LF 9,842.000 $4.000 $0.750 $0.750 $1.000
CONCRETE RAIL REPAIR (MISC)
LF 600.000 $303.000 $77.870 $500.000 $41.000
SP MIXES SP-B PG64-22
TON 45.000 $168.000 $400.000 $400.000 $403.000
SP MIXES SP-C PG64-22
TON 14,380.000 $125.000 $126.500 $126.500 $128.000
TACK COAT
GAL 13,075.000 $4.000 $2.500 $2.500 $3.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 12.000 $149.000 $600.000 $600.000 $605.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $11,745.000 $10,693.720 $46,000.000 $26,694.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 33,737.000 $1.000 $1.130 $1.130 $1.000
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 10,635.000 $1.000 $0.900 $0.900 $1.000
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 1,471.000 $2.100 $1.890 $1.890 $2.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 15,633.000 $4.400 $1.660 $1.660 $2.000
MULTIPOLYMER PAV MRK (W)(8")(DOT)
LF 850.000 $2.100 $1.820 $1.820 $2.000
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 3,570.000 $5.800 $3.780 $3.780 $4.000
MULTIPOLYMER PAV MRK (W)(12")(LNDP)
LF 1,141.000 $3.200 $7.180 $7.180 $8.000
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 352.000 $11.900 $6.300 $6.300 $7.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 53,214.000 $2.400 $0.770 $0.770 $1.000
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 10,643.000 $1.600 $0.840 $0.840 $1.000
TMA (STATIONARY)
DAY 560.000 $150.000 $374.410 $500.000 $334.000
TMA (MOBILE OPERATION)
HR 260.000 $89.000 $102.900 $110.000 $941.000
Totals: $65,858,238.610 $53,775,774.998 $61,746,143.816 $84,184,429.320