Low bids by VALLEY INFRASTRUCTURE, INC.

Contact Information
Phone: N/A
Address: N/A
Fax:      N/A
Low: 6
Lost: 11
Bid: 17
Subs: 0
Win ratio: 35%
Win amount: $3,924,110
Loss amount: $13,542,974
Avg win amount: $654,018
Avg bid amount: $1,027,476
Control County District Estimate Highway Project Date Added Type Low bidder
0342-01-099 HIDALGO PHARR $240,752 SH 107 BR 2020(913) 06/04/2020 11/15/2023 BRIDGE MAINT VALLEY INFRASTRUCTURE, INC.($325,600)
6352-74-001 CAMERON PHARR $771,133 IH0069E BPM - 635274001 12/04/2019 11/15/2023 BRIDGE PREVENT MAINT VALLEY INFRASTRUCTURE, INC.($869,612)
6318-30-001 HIDALGO PHARR $1,054,565 FM0088 BPM - 631830001 02/05/2019 11/15/2023 BRIDGE PREVENT MAINT VALLEY INFRASTRUCTURE, INC.($1,227,644)
6331-35-001 ZAPATA PHARR $275,065 SH0016 RMC - 633135001 08/06/2018 11/15/2023 PARKING LOT IMPRVS,CONC REPAIRS,ETC VALLEY INFRASTRUCTURE, INC.($329,370)
6318-29-001 HIDALGO PHARR $906,326 FM1015 BPM - 631829001 03/06/2018 11/15/2023 BPM VALLEY INFRASTRUCTURE, INC.($827,634)
6295-91-001 HIDALGO PHARR $437,128 SH0336 BPM - 629591001 01/05/2017 11/15/2023 BPM VALLEY INFRASTRUCTURE, INC.($344,250)