County: HIDALGO Highway: FM1015 Date: 03/06/2018 (6 years ago) Engineer's Estimate: $906,326 Control Number: 6318-29-001
Project: BPM - 631829001 District: PHARR Time: 120 W Type: BPM

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $906,325.50
VALLEY INFRASTRUCTURE, INC.   $827,634.40 1
-8.68% | -$78,691.10
ARANDA BROTHERS CONSTRUCTION CO., INC.   $862,305.20 2
-4.86% | -$44,020.30
4.19% | $34,670.80
IOC COMPANY LLC   $862,927.50 3
-4.79% | -$43,398.00
4.26% | $35,293.10
0.07% | $622.30
CHAMPION INFRASTRUCTURE, LLC   $1,064,103.70 4
17.41% | $157,778.20
28.57% | $236,469.30
23.31% | $201,176.20
FOREMOST PAVING, INC.   $1,467,777.77 5
61.95% | $561,452.27
77.35% | $640,143.37
37.94% | $403,674.07

Bid Items

Items: 32, 0 filtered
HIDALGO FM1015  |  PHARR  |  6318-29-001  |  03/06/2018  |  $906,326  |  BPM - 631829001  |  BPM  |  120 W
Item code Description Unit Quantity Engineer's Estimate VALLEY INFRASTRUCTURE, INC. ARANDA BROTHERS CONSTRUCTION CO., INC. IOC COMPANY LLC CHAMPION INFRASTRUCTURE, LLC FOREMOST PAVING, INC.
104 6037 REMOVE CONC (RAIL) LF 40.000 $200.000 $107.000 $10.000 $40.000 $300.000 $400.000
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 497.000 $35.000 $10.000 $20.000 $25.000 $40.000 $50.000
420 6071 CL C CONC (COLLAR) EA 1.000 $1,000.000 $1,250.000 $4,500.000 $2,500.000 $1,500.000 $1,800.000
432 6002 RIPRAP (CONC)(5 IN) CY 176.800 $275.000 $650.000 $425.000 $415.000 $680.000 $700.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 36.800 $450.000 $450.000 $325.000 $475.000 $650.000 $700.000
438 6001 CLEANING AND SEALING EXISTING JOINTS LF 189.000 $25.000 $41.000 $56.500 $40.000 $60.000 $30.000
451 6024 RETROFIT RAIL (TY SSTR) LF 918.760 $175.000 $150.000 $120.000 $175.000 $245.000 $250.000
464 6005 RC PIPE (CL III)(24 IN) LF 8.000 $100.000 $180.000 $50.000 $250.000 $400.000 $500.000
500 6001 MOBILIZATION LS 1.000 $75,000.000 $12,000.000 $85,000.000 $90,000.000 $80,000.000 $78,060.770
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $3,400.000 $5,700.000 $4,500.000 $4,000.000 $7,500.000 $30,000.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 25.000 $50.000 $50.000 $30.000 $70.000 $160.000 $150.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 25.000 $10.000 $25.000 $5.000 $50.000 $100.000 $30.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 303.000 $3.000 $4.000 $5.000 $5.000 $5.000 $7.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 303.000 $1.000 $1.000 $1.000 $2.500 $3.000 $2.000
512 6014 PORT CTB (DES SOURCE)(SGL SLP)(TY 2) LF 2,040.000 $30.000 $23.000 $30.000 $20.000 $35.000 $50.000
512 6026 PORT CTB (MOVE)(SGL SLP)(TY 2) LF 4,980.000 $15.000 $17.000 $20.000 $5.000 $30.000 $10.000
512 6038 PORT CTB (STKPL)(SGL SLP)(TY 2) LF 2,040.000 $30.000 $23.000 $20.000 $20.000 $35.000 $45.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 737.500 $20.000 $22.000 $20.000 $45.000 $30.000 $22.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 7.000 $2,000.000 $1,575.000 $1,650.000 $2,750.000 $60.000 $1,800.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 1,385.000 $2.000 $3.000 $5.000 $7.000 $10.000 $9.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 6.000 $250.000 $265.000 $350.000 $1,500.000 $1,500.000 $400.000
544 6004 GDRAIL END TRT(INST)(WOOD POST)(TY I) EA 9.000 $2,500.000 $2,650.000 $1,550.000 $4,000.000 $3,200.000 $2,500.000
545 6002 CRASH CUSH ATTEN (DES SOURCE) EA 3.000 $3,000.000 $3,000.000 $2,500.000 $4,500.000 $1,800.000 $4,000.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 13.000 $2,000.000 $3,000.000 $500.000 $1,500.000 $2,400.000 $4,000.000
545 6004 CRASH CUSH ATTEN (STKPL) EA 3.000 $1,500.000 $2,000.000 $2,500.000 $3,000.000 $1,800.000 $2,000.000
545 6026 CRASH CUSHION ATTEN (INSTALL) (QUAD)(N) EA 9.000 $25,000.000 $16,100.000 $25,000.000 $18,000.000 $2,700.000 $20,000.000
658 6002 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI) EA 16.000 $20.000 $50.000 $100.000 $125.000 $100.000 $90.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 24.000 $20.000 $25.000 $150.000 $125.000 $100.000 $40.000
752 6015 TREE AND BRUSH REMOVAL AC 0.207 $1,500.000 $5,200.000 $2,500.000 $7,500.000 $3,500.000 $10,000.000
764 6008 STORM SEWER CLEANING (PIPE)(19"-24"DIA) LF 510.000 $10.000 $10.000 $15.000 $45.000 $40.000 $10.000
778 6075 CONC RAIL REPAIR(REMOVE AND REPL RAIL) LF 80.000 $300.000 $565.000 $120.000 $210.000 $650.000 $2,500.000
780 6001 CNC CRACK REPAIR (DISCRETE)(GRAVITY) LF 40.000 $75.000 $51.000 $100.000 $50.000 $80.000 $40.000
Totals: $906,325.50 $827,634.40 $862,305.20 $862,927.50 $1,064,103.70 $1,467,777.77