PREPARING ROW
|
STA
|
61.000
|
|
|
TREE PROTECTION (INSTALL)
|
EA
|
15.000
|
|
|
TREE PROTECTION (REMOVE)
|
EA
|
15.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
700.000
|
|
|
REMOV CONC (MISC)
|
CY
|
13.000
|
|
|
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
18,680.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
24,332.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
53,856.000
|
|
|
FURN & PLACE TOPSOIL (6")
|
SY
|
50,414.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
50,414.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
39,470.000
|
|
|
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
|
SY
|
4,407.000
|
|
|
PROOF ROLLING
|
HR
|
270.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
4,503.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
5,296.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
13,483.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
11,416.000
|
|
|
D-GR HMA TY-C SAC-A PG76-22
|
TON
|
2,746.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
20.000
|
|
|
CEM STABIL BKFL
|
CY
|
442.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
43.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,489.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
180.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
500.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
760.000
|
|
|
DRILL SHAFT (66 IN)
|
LF
|
420.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
32.000
|
|
|
CL C CONC (ABUT)
|
CY
|
116.800
|
|
|
CL C CONC (CAP)
|
CY
|
175.800
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
248.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
242.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
520.000
|
|
|
REINF CONC SLAB
|
SF
|
74,001.000
|
|
|
APPROACH SLAB
|
CY
|
77.000
|
|
|
PRESTR CONC GIRDER (TX70)
|
LF
|
8,850.420
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2.300
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
1.600
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
55.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
635.000
|
|
|
RAIL (TY SSTR)
|
LF
|
3,040.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
295.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
61.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 3 FT)(3:1)(C)
|
EA
|
2.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
160.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
150.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
120.000
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
120.000
|
|
|
BLADING WORK (EROSION & SEDMT CONT)
|
HR
|
120.000
|
|
|
BULLDOZER WORK (EROSION & SEDMT CONT)
|
HR
|
120.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,255.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,255.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,761.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
6,600.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
4,650.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
6,600.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
8,600.000
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
8,600.000
|
|
|
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
|
LF
|
5,780.000
|
|
|
FILL MILLED ASPH RMBL STRIP(CENTERLINE)
|
LF
|
5,130.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
650.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,300.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
|
EA
|
20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
|
EA
|
18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
58.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
24,010.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
24,010.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,201.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
15,498.000
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
14,484.000
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
260.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
390.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
12.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
5.000
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
9.000
|
|
|
TREE REMOVAL (36" - 42" DIA)
|
EA
|
2.000
|
|
|
TREE REMOVAL (42" - 48" DIA)
|
EA
|
1.000
|
|
|
TREE REMOVAL (60" - 72" DIA)
|
EA
|
2.000
|
|
|
BONDING COURSE
|
GAL
|
4,929.000
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
4.000
|
|
|
REMOVE LEAD-CONTAINING COATING (OTHER)
|
LS
|
1.000
|
|
|
Placeholder for requested Special Specification
|
LS
|
11.000
|