Job Info for 0429-01-023

County: WOOD Highway: SH 182 Date: 01/04/2017 (7 years ago) Engineer's Estimate: $3,358,903 Control Number: 0429-01-023
Project: STP 2017(358)HES District: TYLER Time: 387 WORKING DAYS Type: SAFETY TREAT FIXED OBJECTS

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $3,358,902.95
HIGHWAY 19 CONSTRUCTION LLC   $3,239,526.94 1
-3.55% | -$119,376.01
LONGVIEW BRIDGE AND ROAD, LTD.   $3,523,595.80 2
4.9% | $164,692.85
8.77% | $284,068.86
HARRISON, WALKER AND HARPER, LP   $3,844,122.56 3
14.45% | $485,219.61
18.66% | $604,595.62
9.10% | $320,526.76
EAST TEXAS BRIDGE, INC.   $4,086,804.75 4
21.67% | $727,901.80
26.15% | $847,277.81
6.31% | $242,682.19
FNH CONSTRUCTION, LLC   $4,367,340.25 5
30.02% | $1,008,437.30
34.81% | $1,127,813.31
6.86% | $280,535.50

Bid Items

Items: 87, 0 filtered
WOOD SH 182  |  TYLER  |  0429-01-023  |  01/04/2017  |  $3,358,903  |  STP 2017(358)HES  |  SAFETY TREAT FIXED OBJECTS  |  387 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate HIGHWAY 19 CONSTRUCTION LLC LONGVIEW BRIDGE AND ROAD, LTD. HARRISON, WALKER AND HARPER, LP EAST TEXAS BRIDGE, INC. FNH CONSTRUCTION, LLC
100 6002 PREPARING ROW STA 26.800 $1,200.000 $2,500.000 $2,000.000 $757.000 $4,000.000 $10,000.000
132 6005 EMBANKMENT (FINAL)(ORD COMP)(TY C) CY 4,172.000 $14.000 $20.000 $16.500 $16.600 $18.000 $35.000
150 6001 BLADING STA 397.400 $300.000 $500.000 $350.000 $9.900 $400.000 $350.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 38,123.000 $1.400 $5.000 $2.650 $3.300 $4.000 $2.250
162 6002 BLOCK SODDING SY 9,670.000 $3.000 $5.000 $4.400 $4.500 $4.500 $5.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 38,123.000 $1.250 $0.860 $1.000 $1.000 $1.000 $0.500
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 19,061.000 $1.250 $0.780 $0.850 $0.900 $0.950 $0.500
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 19,061.000 $1.250 $0.780 $0.850 $0.900 $0.950 $0.500
168 6001 VEGETATIVE WATERING MG 1,050.000 $20.000 $100.000 $10.000 $168.900 $10.000 $38.000
400 6006 CUT & RESTORING PAV SY 111.000 $120.000 $180.000 $200.000 $19.700 $200.000 $20.000
400 6007 CUT & RESTORE CONC PAVING SY 210.000 $65.000 $200.000 $175.000 $65.200 $150.000 $20.000
400 6008 CUT & RESTORE ASPH PAVING SY 2,255.000 $40.000 $45.000 $75.000 $42.000 $70.000 $120.000
400 6012 CUT AND RESTORE PAV (FLEX BASE) SY 2,391.000 $10.000 $25.000 $32.000 $21.000 $50.000 $85.000
401 6001 FLOWABLE BACKFILL CY 76.000 $250.000 $180.000 $300.000 $132.800 $250.000 $400.000
403 6001 TEMPORARY SPL SHORING SF 1,480.000 $30.000 $60.000 $50.000 $64.900 $50.000 $45.000
420 6001 CL A CONC (SEAL) CY 1.000 $400.000 $1,000.000 $1,500.000 $189.000 $1,500.000 $2,000.000
420 6009 CL A CONC (COLLAR) EA 107.000 $1,000.000 $1,100.000 $1,200.000 $839.000 $1,200.000 $1,500.000
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 320.000 $170.000 $180.000 $175.000 $157.000 $200.000 $185.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 101.000 $500.000 $400.000 $525.000 $452.000 $550.000 $550.000
462 6046 CONC BOX CULV (3 FT X 3 FT)(EXTEND) LF 12.000 $450.000 $500.000 $740.000 $1,492.000 $1,000.000 $650.000
462 6051 CONC BOX CULV (5 FT X 3 FT)(EXTEND) LF 6.000 $700.000 $500.000 $1,375.000 $2,237.000 $1,000.000 $700.000
462 6052 CONC BOX CULV (5 FT X 4 FT)(EXTEND) LF 10.000 $700.000 $500.000 $900.000 $2,237.000 $1,000.000 $750.000
462 6057 CONC BOX CULV (6 FT X 6 FT)(EXTEND) LF 32.000 $800.000 $600.000 $630.000 $2,828.000 $1,200.000 $850.000
462 6060 CONC BOX CULV (7 FT X 5 FT)(EXTEND) LF 14.000 $800.000 $700.000 $900.000 $3,230.000 $1,200.000 $900.000
462 6073 CONC BOX CULV (10 FT X 5 FT)(EXTEND) LF 8.000 $1,100.000 $800.000 $1,250.000 $3,532.000 $1,300.000 $1,000.000
462 6077 CONC BOX CULV (10 FT X 9 FT)(EXTEND) LF 8.000 $1,500.000 $1,100.000 $1,325.000 $3,607.000 $1,500.000 $1,200.000
462 6133 CONC BOX CULV (5 FT X 6.5 FT)(EXTEND) LF 4.000 $750.000 $700.000 $2,050.000 $3,356.000 $1,250.000 $700.000
464 6002 RC PIPE (CL III)(15 IN) LF 8.000 $50.000 $30.000 $85.000 $59.000 $50.000 $50.000
464 6003 RC PIPE (CL III)(18 IN) LF 8,624.000 $60.000 $35.000 $41.000 $62.000 $55.000 $55.000
464 6005 RC PIPE (CL III)(24 IN) LF 1,130.000 $50.000 $45.000 $60.000 $72.000 $75.000 $75.000
464 6007 RC PIPE (CL III)(30 IN) LF 248.000 $75.000 $55.000 $90.000 $94.000 $90.000 $85.000
464 6008 RC PIPE (CL III)(36 IN) LF 236.000 $95.000 $150.000 $112.000 $113.000 $125.000 $125.000
464 6009 RC PIPE (CL III)(42 IN) LF 24.000 $130.000 $166.000 $180.000 $144.000 $150.000 $185.000
464 6010 RC PIPE (CL III)(48 IN) LF 202.000 $170.000 $185.000 $185.000 $160.000 $175.000 $210.000
464 6011 RC PIPE (CL III)(54 IN) LF 80.000 $200.000 $230.000 $225.000 $203.000 $200.000 $250.000
465 6005 JCTBOX(COMPL)(PJB)(3FTX3FT) EA 1.000 $3,200.000 $3,500.000 $5,000.000 $5,145.000 $5,000.000 $5,000.000
465 6009 JCTBOX(COMPL)(PJB)(5FTX5FT) EA 2.000 $5,000.000 $5,000.000 $8,000.000 $7,778.000 $7,000.000 $5,000.000
466 6097 HEADWALL (CH - PW - 0) (DIA= 24 IN) EA 1.000 $5,500.000 $3,000.000 $5,700.000 $18,123.000 $5,500.000 $5,000.000
466 6101 HEADWALL (CH - PW - 0) (DIA= 36 IN) EA 1.000 $8,000.000 $3,500.000 $8,500.000 $18,481.000 $9,000.000 $7,000.000
466 6103 HEADWALL (CH - PW - 0) (DIA= 48 IN) EA 4.000 $10,500.000 $5,500.000 $10,750.000 $18,916.000 $11,000.000 $9,000.000
466 6104 HEADWALL (CH - PW - 0) (DIA= 54 IN) EA 4.000 $11,800.000 $7,500.000 $8,200.000 $18,255.000 $12,000.000 $12,500.000
466 6186 WINGWALL (PW - 2) (HW=11 FT) EA 1.000 $25,000.000 $30,000.000 $24,000.000 $24,797.000 $30,000.000 $48,500.000
466 6194 WINGWALL (PW - 2) (HW=5 FT) EA 4.000 $9,000.000 $6,500.000 $8,000.000 $23,126.000 $7,000.000 $1,400.000
466 6195 WINGWALL (PW - 2) (HW=6 FT) EA 4.000 $13,500.000 $7,000.000 $13,000.000 $24,630.000 $14,000.000 $15,000.000
466 6196 WINGWALL (PW - 2) (HW=7 FT) EA 3.000 $15,000.000 $8,000.000 $11,500.000 $24,965.000 $16,000.000 $16,000.000
466 6197 WINGWALL (PW - 2) (HW=8 FT) EA 2.000 $20,000.000 $9,500.000 $18,000.000 $27,484.000 $23,000.000 $23,500.000
467 6004 SET (REPLACE PIPE RUNNER) EA 12.000 $500.000 $4,000.000 $2,000.000 $604.000 $1,500.000 $500.000
467 6338 SET (TY II) (15 IN) (RCP) (4: 1) (C) EA 2.000 $400.000 $350.000 $530.000 $1,059.000 $550.000 $500.000
467 6341 SET (TY II) (15 IN) (RCP) (6: 1) (P) EA 4.000 $550.000 $400.000 $550.000 $1,115.000 $600.000 $550.000
467 6356 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 3.000 $800.000 $375.000 $515.000 $1,087.000 $600.000 $850.000
467 6358 SET (TY II) (18 IN) (RCP) (4: 1) (C) EA 29.000 $750.000 $400.000 $550.000 $1,086.000 $600.000 $850.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 512.000 $750.000 $525.000 $640.000 $1,009.000 $600.000 $550.000
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1.000 $950.000 $500.000 $615.000 $1,019.000 $600.000 $850.000
467 6390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 36.000 $1,000.000 $650.000 $750.000 $1,181.000 $900.000 $950.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 34.000 $1,100.000 $800.000 $950.000 $1,392.000 $1,000.000 $1,250.000
467 6419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 25.000 $1,700.000 $1,175.000 $1,100.000 $1,546.000 $1,600.000 $1,850.000
467 6423 SET (TY II) (30 IN) (RCP) (6: 1) (P) EA 4.000 $1,900.000 $1,900.000 $1,450.000 $1,839.000 $1,800.000 $2,000.000
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 17.000 $2,400.000 $2,625.000 $2,400.000 $2,486.000 $4,500.000 $3,000.000
467 6454 SET (TY II) (36 IN) (RCP) (6: 1) (P) EA 2.000 $2,600.000 $4,000.000 $4,800.000 $3,492.000 $6,000.000 $3,500.000
467 6463 SET (TY II) (42 IN) (RCP) (4: 1) (C) EA 6.000 $3,600.000 $4,400.000 $3,700.000 $3,145.000 $6,500.000 $4,000.000
467 6474 SET (TY II) (48 IN) (RCP) (3: 1) (C) EA 2.000 $4,500.000 $3,500.000 $3,800.000 $3,465.000 $6,500.000 $5,000.000
467 6477 SET (TY II) (48 IN) (RCP) (4: 1) (C) EA 8.000 $4,800.000 $4,900.000 $4,400.000 $3,938.000 $7,000.000 $5,000.000
480 6001 CLEAN EXIST CULVERTS EA 12.000 $1,800.000 $1,500.000 $3,000.000 $945.000 $2,500.000 $1,000.000
496 6007 REMOV STR (PIPE) LF 190.000 $18.000 $20.000 $45.000 $21.000 $25.000 $30.000
496 6016 REMOV STR (PIPE) EA 275.000 $400.000 $250.000 $550.000 $143.000 $500.000 $250.000
496 6099 REMOVE STR (RAIL) LF 1,455.000 $20.000 $10.000 $10.000 $17.000 $12.000 $30.000
500 6001 MOBILIZATION LS 1.000 $306,511.000 $240,000.000 $285,000.000 $134,492.000 $350,000.000 $400,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 28.000 $4,000.000 $5,000.000 $2,750.000 $1,560.000 $10,000.000 $8,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 1,095.000 $30.000 $25.000 $40.000 $59.000 $35.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,095.000 $8.000 $10.000 $11.000 $42.000 $8.000 $15.000
506 6027 EXCAV (EROSN & SEDMT CONT, IN VEH) CY 1,000.000 $25.000 $15.000 $15.000 $4.600 $25.000 $20.000
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 250.000 $115.000 $50.000 $180.000 $123.000 $75.000 $150.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 8,647.000 $2.750 $3.000 $5.500 $3.600 $3.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 8,647.000 $0.750 $1.000 $1.950 $1.400 $0.750 $2.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 2,720.000 $5.000 $5.000 $16.750 $4.700 $5.500 $12.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 2,720.000 $0.500 $1.000 $4.800 $2.700 $1.000 $8.000
506 6046 TRACKHOE WORK (EROSION & SEDMT CONT) HR 150.000 $230.000 $100.000 $210.000 $176.000 $100.000 $150.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 625.000 $20.000 $17.000 $22.000 $20.500 $20.000 $25.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 50.000 $40.000 $72.000 $95.000 $62.500 $60.000 $45.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,600.000 $1,600.000 $1,800.000 $1,704.000 $1,800.000 $1,850.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 678.000 $2.500 $5.000 $5.500 $2.300 $2.200 $3.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 2.000 $210.000 $400.000 $135.000 $140.400 $165.000 $1,500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 10.000 $2,200.000 $2,250.000 $2,300.000 $1,307.000 $1,300.000 $2,850.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $300.000 $300.000 $250.000 $170.400 $175.000 $1,500.000
658 6013 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 12.000 $28.000 $22.000 $30.000 $17.000 $20.000 $100.000
658 6048 INSTL OM ASSM (OM-2Z)(FLX)GND EA 144.000 $65.000 $55.000 $71.000 $51.000 $50.000 $100.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 30.000 $50.000 $37.000 $46.500 $28.000 $30.000 $100.000
Totals: $3,358,902.95 $3,239,526.94 $3,523,595.80 $3,844,122.56 $4,086,804.75 $4,367,340.25