WILLACY IH0069E (6363-38-001)

Items: 40

County: WILLACY
Length: N/A
Highway: IH0069E
District: PHARR
Control Number: 6363-38-001
DBE Goal: N/A
Project: BPM - 636338001
Guaranty: N/A
Time: 180 W
Engineer's Estimate: $878,812.50
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: HIGHWAY BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$878,812.50
$848,211.00
Over/Under Est: -3.48% -$30,601.50
$1,291,413.50
Over/Under Est: 46.95% $412,601.00
Amt Left: 52.25% $443,202.50
Over/Under Est: 94.86% $833,685.00
Amt Left: 101.9% $864,286.50
Delta: -32.61% -$421,084.00

Bid Items & Bid Tabulations

40 Total 0 of 40
WILLACY  |  IH0069E  |  PHARR  |  6363-38-001  |  08/06/2020  |  $878,812.50  |  BPM - 636338001  |  HWY BRIDGE PREVENT MAINT  |  180 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
LUCANIA CONSTRUCTION LLC
FNH CONSTRUCTION, LLC
VALLEY INFRASTRUCTURE, INC.
PREPARING ROW
STA 4.000 $500.000 $5,000.000 $22,000.000 $5,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 720.000 $20.000 $51.000 $35.000 $50.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 150.000 $3.000 $13.500 $3.000 $25.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 150.000 $3.000 $13.500 $3.000 $25.000
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 250.000 $10.000 $10.500 $10.000 $20.000
FLOWABLE BACKFILL
CY 254.000 $300.000 $145.000 $350.000 $385.000
RIPRAP (CONC)(5 IN)
CY 330.000 $650.000 $300.000 $650.000 $1,700.000
RIPRAP (MOW STRIP)(4 IN)
CY 157.000 $475.000 $300.000 $550.000 $585.000
CLEANING AND SEALING EXISTING JOINTS
LF 420.000 $50.000 $42.500 $100.000 $85.000
RETROFIT RAIL (TY SSTR)
LF 804.000 $160.000 $140.000 $185.000 $285.000
RC PIPE (CL III)(36 IN)
LF 80.000 $100.000 $140.000 $200.000 $175.000
SET (TY II) (36 IN) (RCP) (4: 1) (P)
EA 1.000 $1,500.000 $7,150.000 $3,500.000 $4,500.000
MOBILIZATION
LS 1.000 $18,000.000 $100,000.000 $135,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $1,825.000 $8,500.000 $10,000.000
CONSTRUCTION PERIMETER FENCE
LF 100.000 $50.000 $78.500 $25.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 781.000 $4.000 $5.000 $4.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 781.000 $1.000 $2.000 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 20.000 $2.000 $6.700 $18.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 20.000 $1.000 $2.500 $9.000 $3.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 2)
LF 360.000 $30.000 $32.000 $50.000 $65.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 1,440.000 $25.000 $27.000 $20.000 $50.000
PORT CTB (STKPL)(SGL SLP)(TY 2)
LF 360.000 $30.000 $28.000 $50.000 $65.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,053.000 $20.000 $25.000 $25.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $2,000.000 $1,950.000 $1,850.000 $1,600.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,200.000 $1,425.000 $1,850.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 2,237.500 $3.000 $6.000 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $100.000 $875.000 $500.000 $175.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $890.000 $500.000 $175.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $500.000 $450.000 $1,000.000 $350.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 20.000 $2,500.000 $2,880.000 $2,500.000 $3,000.000
CRASH CUSH ATTEN (DES SOURCE)
EA 2.000 $3,000.000 $1,450.000 $5,000.000 $4,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $2,000.000 $1,200.000 $5,000.000 $2,500.000
CRASH CUSH ATTEN (STKPL)
EA 2.000 $2,000.000 $1,450.000 $2,500.000 $4,000.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 110.000 $50.000 $65.000 $50.000 $50.000
INSTL OM ASSM (OM-2Z)(FLX)SRF(BI)
EA 20.000 $50.000 $96.000 $50.000 $25.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $20.000 $15.000 $20.000 $14.000
REFL PAV MRKR TY II-A-A
EA 240.000 $5.000 $10.500 $15.000 $10.000
BIRD EXCLUSION METHOD
SF 600.000 $6.000 $20.000 $85.000 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 6.000 $2,000.000 $4,000.000 $150.000 $750.000
TMA (STATIONARY)
DAY 20.000 $250.000 $550.000 $350.000 $450.000
Totals: $878,812.500 $848,211.000 $1,291,413.500 $1,712,497.500