PREPARING ROW
|
STA
|
25.500
|
$3,500.000
|
$2,600.000
|
$13,500.000
|
$3,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
143.000
|
$25.000
|
$25.000
|
$35.000
|
$25.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (4"-8")
|
SY
|
3,404.000
|
$8.000
|
$4.500
|
$15.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
838.000
|
$10.000
|
$19.000
|
$25.000
|
$50.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
4,239.000
|
$25.000
|
$35.000
|
$19.000
|
$40.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
260.000
|
$25.000
|
$42.000
|
$36.500
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
23.790
|
$275.000
|
$400.000
|
$650.000
|
$500.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
51,600.000
|
$3.000
|
$4.500
|
$3.500
|
$3.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
25,800.000
|
$0.150
|
$0.130
|
$0.150
|
$1.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
53,715.000
|
$0.700
|
$0.650
|
$0.720
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
25,800.000
|
$0.700
|
$0.540
|
$0.600
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
25,800.000
|
$0.700
|
$0.540
|
$0.600
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,442.000
|
$5.000
|
$0.010
|
$15.500
|
$20.000
|
|
|
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
|
CY
|
100.000
|
$100.000
|
$60.000
|
$160.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
66,084.000
|
$20.000
|
$14.750
|
$17.500
|
$35.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
58,742.000
|
$5.000
|
$18.000
|
$13.000
|
$4.500
|
|
|
CEMENT
|
TON
|
1,233.000
|
$270.000
|
$220.000
|
$250.000
|
$250.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
68,531.000
|
$4.500
|
$4.500
|
$3.500
|
$4.500
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
3,096.000
|
$8.000
|
$4.920
|
$5.500
|
$10.000
|
|
|
ASPH (RC-250)
|
GAL
|
12,728.000
|
$7.000
|
$6.460
|
$6.250
|
$5.750
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
54,433.000
|
$6.500
|
$4.680
|
$6.500
|
$6.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
720.000
|
$180.000
|
$141.000
|
$240.000
|
$180.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
560.000
|
$180.000
|
$126.000
|
$230.000
|
$185.000
|
|
|
AGGR (TY-PD GR-5 OR TY-PL GR-5)
|
CY
|
509.000
|
$300.000
|
$121.000
|
$232.000
|
$180.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,391.000
|
$5.000
|
$3.500
|
$7.500
|
$15.000
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
7,972.000
|
$5.500
|
$3.000
|
$5.250
|
$6.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
260.000
|
$80.000
|
$60.000
|
$77.000
|
$55.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
4.000
|
$1,500.000
|
$1,750.000
|
$1,750.000
|
$1,500.000
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
1.400
|
$650.000
|
$1,200.000
|
$3,500.000
|
$1,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
22.100
|
$600.000
|
$550.000
|
$900.000
|
$750.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
130.000
|
$200.000
|
$190.000
|
$205.000
|
$180.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
124.000
|
$600.000
|
$500.000
|
$690.000
|
$550.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
7.000
|
$1,050.000
|
$900.000
|
$3,500.000
|
$1,000.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
7.000
|
$1,150.000
|
$975.000
|
$3,600.000
|
$1,300.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
12.000
|
$120.000
|
$95.000
|
$260.000
|
$160.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
12.000
|
$160.000
|
$150.000
|
$300.000
|
$250.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
16.000
|
$200.000
|
$185.000
|
$300.000
|
$450.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
1.000
|
$35,000.000
|
$27,350.000
|
$36,600.000
|
$60,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$25,000.000
|
$15,750.000
|
$31,250.000
|
$27,500.000
|
|
|
SET (TY I) (30 IN) (3: 1) (C)
|
EA
|
1.000
|
$7,500.000
|
$1,575.000
|
$3,000.000
|
$3,600.000
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
1.000
|
$8,500.000
|
$3,750.000
|
$3,900.000
|
$5,600.000
|
|
|
SET (TY I) (42 IN) (3: 1) (C)
|
EA
|
4.000
|
$11,000.000
|
$5,500.000
|
$5,600.000
|
$7,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$2,000.000
|
$1,750.000
|
$3,100.000
|
$1,800.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
42.000
|
$190.000
|
$200.000
|
$150.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$548,350.200
|
$470,000.000
|
$650,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$10,000.000
|
$9,000.000
|
$10,000.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
900.000
|
$30.000
|
$24.000
|
$31.000
|
$35.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
450.000
|
$35.000
|
$28.000
|
$45.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,350.000
|
$10.000
|
$9.750
|
$9.000
|
$10.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
55.000
|
$25.000
|
$35.000
|
$60.000
|
$50.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$70.000
|
$95.000
|
$200.000
|
$50.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,600.000
|
$3.000
|
$2.650
|
$3.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,600.000
|
$0.700
|
$0.600
|
$1.000
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
30.000
|
$100.000
|
$225.000
|
$250.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
593.000
|
$100.000
|
$62.000
|
$46.000
|
$75.000
|
|
|
TURNOUTS (ACP)
|
SY
|
83.000
|
$100.000
|
$62.000
|
$90.000
|
$150.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
122.000
|
$150.000
|
$145.000
|
$158.000
|
$110.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,275.000
|
$25.000
|
$23.750
|
$25.000
|
$25.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
200.000
|
$35.000
|
$33.500
|
$26.000
|
$25.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
125.000
|
$90.000
|
$87.000
|
$100.000
|
$75.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$3,400.000
|
$2,895.000
|
$3,050.000
|
$2,850.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
3.000
|
$375.000
|
$302.500
|
$330.000
|
$24.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$425.000
|
$355.000
|
$370.000
|
$380.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$700.000
|
$750.000
|
$720.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$725.000
|
$858.770
|
$875.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$800.000
|
$868.190
|
$890.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
20.000
|
$100.000
|
$100.000
|
$110.000
|
$160.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
34.000
|
$20.000
|
$30.000
|
$38.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
40.000
|
$30.000
|
$33.000
|
$28.000
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
34.000
|
$75.000
|
$66.000
|
$70.000
|
$65.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
50,778.000
|
$1.500
|
$0.250
|
$0.300
|
$0.350
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
28.000
|
$4.000
|
$4.000
|
$3.300
|
$23.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,810.000
|
$1.500
|
$28.000
|
$0.300
|
$0.430
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
32,705.000
|
$1.500
|
$0.250
|
$0.300
|
$0.330
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,940.000
|
$1.000
|
$1.500
|
$2.000
|
$1.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
540.000
|
$1.000
|
$1.200
|
$2.000
|
$10.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
963.000
|
$1.000
|
$1.200
|
$2.000
|
$10.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
405.000
|
$2.000
|
$0.900
|
$1.100
|
$0.330
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
56.000
|
$6.500
|
$7.000
|
$9.000
|
$0.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
50,778.000
|
$0.600
|
$0.470
|
$0.700
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,810.000
|
$1.000
|
$0.520
|
$0.700
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
32,705.000
|
$0.600
|
$0.470
|
$0.670
|
$0.460
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
16.000
|
$35.000
|
$40.000
|
$55.000
|
$109.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
547.000
|
$4.000
|
$3.880
|
$4.400
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
20.000
|
$4.150
|
$4.000
|
$11.000
|
$5.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
3,897.000
|
$190.000
|
$128.000
|
$161.000
|
$250.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
1,048.000
|
$170.000
|
$142.000
|
$175.000
|
$280.000
|
|
|
TACK COAT
|
GAL
|
1,161.000
|
$3.750
|
$7.500
|
$6.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$100.000
|
$200.000
|
$220.000
|
$100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$5,000.000
|
$12,000.000
|
$20,000.000
|
$20,000.000
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
32.000
|
$75.000
|
$150.000
|
$230.000
|
$180.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$250.000
|
$200.000
|
$275.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$250.000
|
$250.000
|
$1,100.000
|
$1,000.000
|
|
Totals: |
$6,031,827.000
|
$5,701,599.660
|
$6,604,656.350
|
$7,405,912.940
|