Bid Cobra

VAN ZANDT IH 20 (0495-02-069)

Items: 93

County: VAN ZANDT
Length: N/A
Highway: IH 20
District: TYLER
Control Number: 0495-02-069
DBE Goal: N/A
Project: C 495-2-69
Guaranty: N/A
Time: 94 WORKING DAYS
Engineer's Estimate: $6,031,827.00
Date: 03/07/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
LANCE POMYKAL
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$6,031,827.00
$5,701,599.66
Over/Under Est: -5.47% -$330,227.34
Over/Under Est: 9.5% $572,829.35
Amt Left: 15.84% $903,056.69
Over/Under Est: 22.78% $1,374,085.94
Amt Left: 29.89% $1,704,313.28
Delta: -12.13% -$801,256.59
Subcontractor Percentage Amount
FOUTSCO PAVING COMPANY, LLC 13.56% $787,164.95
JM YANEZ CONSTRUCTION, INC. 3.67% $213,045.38
DUSTIN ALLEN, INC. 1.63% $94,622.34
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.26% $73,143.65
LINEAR TRAFFIC MARKINGS LLC 1.17% $67,919.10
SOUTHWEST ENVIRONMENT SERVICES LLC 1.12% $65,016.57
JOSH & ERICA ENTERPRISES LLC 0.26% $15,093.13
FLEX SUPPLY, LLC 0.14% $8,127.07
CLEANVAC ENVIRONMENTAL LLC 0.10% $5,805.05
Total: 22.91% $1,329,937.24

Bid Items & Bid Tabulations

93 Total 0 of 93
VAN ZANDT  |  IH 20  |  TYLER  |  0495-02-069  |  03/07/2023  |  $6,031,827.00  |  C 495-2-69  |  REHAB EXIST ROADWAY  |  94 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
H. V. CAVER, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
HIGHWAY 19 CONSTRUCTION LLC
PREPARING ROW
STA 25.500 $3,500.000 $2,600.000 $13,500.000 $3,000.000
REMOVING CONC (DRIVEWAYS)
SY 143.000 $25.000 $25.000 $35.000 $25.000
REMOVING STAB BASE AND ASPH PAV (4"-8")
SY 3,404.000 $8.000 $4.500 $15.000 $10.000
EXCAVATION (ROADWAY)
CY 838.000 $10.000 $19.000 $25.000 $50.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 4,239.000 $25.000 $35.000 $19.000 $40.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 260.000 $25.000 $42.000 $36.500 $30.000
BACKFILL (TY A)
STA 23.790 $275.000 $400.000 $650.000 $500.000
FURNISHING AND PLACING TOPSOIL (4")
SY 51,600.000 $3.000 $4.500 $3.500 $3.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 25,800.000 $0.150 $0.130 $0.150 $1.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 53,715.000 $0.700 $0.650 $0.720 $1.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 25,800.000 $0.700 $0.540 $0.600 $1.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 25,800.000 $0.700 $0.540 $0.600 $1.000
VEGETATIVE WATERING
MG 1,442.000 $5.000 $0.010 $15.500 $20.000
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
CY 100.000 $100.000 $60.000 $160.000 $150.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 66,084.000 $20.000 $14.750 $17.500 $35.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 58,742.000 $5.000 $18.000 $13.000 $4.500
CEMENT
TON 1,233.000 $270.000 $220.000 $250.000 $250.000
CEMENT TREAT(EXIST MATL)(8")
SY 68,531.000 $4.500 $4.500 $3.500 $4.500
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 3,096.000 $8.000 $4.920 $5.500 $10.000
ASPH (RC-250)
GAL 12,728.000 $7.000 $6.460 $6.250 $5.750
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 54,433.000 $6.500 $4.680 $6.500 $6.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 720.000 $180.000 $141.000 $240.000 $180.000
AGGR(TY-PD GR-4 OR TY-PL GR-4)
CY 560.000 $180.000 $126.000 $230.000 $185.000
AGGR (TY-PD GR-5 OR TY-PL GR-5)
CY 509.000 $300.000 $121.000 $232.000 $180.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,391.000 $5.000 $3.500 $7.500 $15.000
PLANE ASPH CONC PAV (4")
SY 7,972.000 $5.500 $3.000 $5.250 $6.500
TEMPORARY SPL SHORING
SF 260.000 $80.000 $60.000 $77.000 $55.000
CL C CONC (COLLAR)
EA 4.000 $1,500.000 $1,750.000 $1,750.000 $1,500.000
CL E CONC (SEAL SLAB)
CY 1.400 $650.000 $1,200.000 $3,500.000 $1,000.000
RIPRAP (CONC)(4 IN)
CY 22.100 $600.000 $550.000 $900.000 $750.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 130.000 $200.000 $190.000 $205.000 $180.000
RIPRAP (MOW STRIP)(4 IN)
CY 124.000 $600.000 $500.000 $690.000 $550.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 7.000 $1,050.000 $900.000 $3,500.000 $1,000.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 7.000 $1,150.000 $975.000 $3,600.000 $1,300.000
RC PIPE (CL III)(30 IN)
LF 12.000 $120.000 $95.000 $260.000 $160.000
RC PIPE (CL III)(36 IN)
LF 12.000 $160.000 $150.000 $300.000 $250.000
RC PIPE (CL III)(42 IN)
LF 16.000 $200.000 $185.000 $300.000 $450.000
WINGWALL (PW - 2) (HW=10 FT)
EA 1.000 $35,000.000 $27,350.000 $36,600.000 $60,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 1.000 $25,000.000 $15,750.000 $31,250.000 $27,500.000
SET (TY I) (30 IN) (3: 1) (C)
EA 1.000 $7,500.000 $1,575.000 $3,000.000 $3,600.000
SET (TY I) (36 IN) (3: 1) (C)
EA 1.000 $8,500.000 $3,750.000 $3,900.000 $5,600.000
SET (TY I) (42 IN) (3: 1) (C)
EA 4.000 $11,000.000 $5,500.000 $5,600.000 $7,500.000
CLEAN EXIST CULVERTS
EA 6.000 $2,000.000 $1,750.000 $3,100.000 $1,800.000
REMOVE STR (BOLLARD)
EA 42.000 $190.000 $200.000 $150.000 $100.000
MOBILIZATION
LS 1.000 $548,350.200 $470,000.000 $650,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $9,000.000 $10,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 900.000 $30.000 $24.000 $31.000 $35.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 450.000 $35.000 $28.000 $45.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 1,350.000 $10.000 $9.750 $9.000 $10.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 55.000 $25.000 $35.000 $60.000 $50.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 50.000 $70.000 $95.000 $200.000 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,600.000 $3.000 $2.650 $3.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,600.000 $0.700 $0.600 $1.000 $1.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 30.000 $100.000 $225.000 $250.000 $100.000
DRIVEWAYS (ACP)
SY 593.000 $100.000 $62.000 $46.000 $75.000
TURNOUTS (ACP)
SY 83.000 $100.000 $62.000 $90.000 $150.000
DRIVEWAYS (CONC) (HES)
SY 122.000 $150.000 $145.000 $158.000 $110.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,275.000 $25.000 $23.750 $25.000 $25.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 200.000 $35.000 $33.500 $26.000 $25.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 125.000 $90.000 $87.000 $100.000 $75.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $3,400.000 $2,895.000 $3,050.000 $2,850.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 3.000 $375.000 $302.500 $330.000 $24.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $425.000 $355.000 $370.000 $380.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 11.000 $700.000 $750.000 $720.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 2.000 $725.000 $858.770 $875.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $800.000 $868.190 $890.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 20.000 $100.000 $100.000 $110.000 $160.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 34.000 $20.000 $30.000 $38.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 40.000 $30.000 $33.000 $28.000 $45.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 34.000 $75.000 $66.000 $70.000 $65.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 50,778.000 $1.500 $0.250 $0.300 $0.350
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 28.000 $4.000 $4.000 $3.300 $23.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,810.000 $1.500 $28.000 $0.300 $0.430
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 32,705.000 $1.500 $0.250 $0.300 $0.330
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,940.000 $1.000 $1.500 $2.000 $1.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 540.000 $1.000 $1.200 $2.000 $10.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 963.000 $1.000 $1.200 $2.000 $10.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 405.000 $2.000 $0.900 $1.100 $0.330
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 56.000 $6.500 $7.000 $9.000 $0.250
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 50,778.000 $0.600 $0.470 $0.700 $0.330
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,810.000 $1.000 $0.520 $0.700 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 32,705.000 $0.600 $0.470 $0.670 $0.460
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 16.000 $35.000 $40.000 $55.000 $109.000
REFL PAV MRKR TY II-A-A
EA 547.000 $4.000 $3.880 $4.400 $5.000
REFL PAV MRKR TY II-C-R
EA 20.000 $4.150 $4.000 $11.000 $5.000
SP MIXES SP-C PG64-22
TON 3,897.000 $190.000 $128.000 $161.000 $250.000
SP MIXES SP-C SAC-A PG70-22
TON 1,048.000 $170.000 $142.000 $175.000 $280.000
TACK COAT
GAL 1,161.000 $3.750 $7.500 $6.000 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $100.000 $200.000 $220.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $5,000.000 $12,000.000 $20,000.000 $20,000.000
DEAD END ROADWAY BARRICADE
LF 32.000 $75.000 $150.000 $230.000 $180.000
TMA (STATIONARY)
DAY 90.000 $250.000 $200.000 $275.000 $200.000
TMA (MOBILE OPERATION)
DAY 12.000 $250.000 $250.000 $1,100.000 $1,000.000
Totals: $6,031,827.000 $5,701,599.660 $6,604,656.350 $7,405,912.940