VAN ZANDT SH 19 (0108-02-033)

Items: 117

County: VAN ZANDT
Length: N/A
Highway: SH 19
District: TYLER
Control Number: 0108-02-033
DBE Goal: N/A
Project: F 2021(821)
Guaranty: N/A
Time: 434 WORKING DAYS
Engineer's Estimate: $13,424,556.29
Date: 08/05/2021 (4 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$13,424,556.29
$12,108,565.85
Over/Under Est: -9.8% -$1,315,990.44
$12,422,020.68
Over/Under Est: -7.47% -$1,002,535.61
Amt Left: 2.59% $313,454.83
Over/Under Est: -2.05% -$275,533.75
Amt Left: 8.59% $1,040,456.69
Delta: -5.85% -$727,001.86
Over/Under Est: 3.2% $430,044.07
Amt Left: 14.42% $1,746,034.51
Delta: -5.37% -$705,577.82
Over/Under Est: 3.84% $515,745.54
Amt Left: 15.13% $1,831,735.98
Delta: -0.62% -$85,701.47
Over/Under Est: 21.38% $2,869,742.81
Amt Left: 34.57% $4,185,733.25
Delta: -16.89% -$2,353,997.27
Subcontractor Percentage Amount
BAHENA CONSTRUCTION CO.,INC. 4.68% $566,680.88
J. H. ODEN CONTRACTING COMPANY 2.47% $299,081.58
STRIPING TECHNOLOGY, L.P. 1.52% $184,050.20
FORTSON CONTRACTING, INC. 1.34% $162,254.78
COLD CREEK CONSTRUCTION, LTD 1.33% $161,043.93
SYNERGY SIGNS & SERVICES LLC 1.14% $138,037.65
SURFACE PREPARATION TECHNOLOGIES, LLC 0.26% $31,482.27
BARRICADES UNLIMITED 0.22% $26,638.84
HDZ CONSTRUCTION 0.15% $18,162.85
Total: 13.11% $1,587,432.98

Bid Items & Bid Tabulations

117 Total 0 of 117
VAN ZANDT  |  SH 19  |  TYLER  |  0108-02-033  |  08/05/2021  |  $13,424,556.29  |  F 2021(821)  |  HWY IMPRV  |  434 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
A. L. HELMCAMP, INC.
TEXAS MATERIALS GROUP, INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
LONGVIEW BRIDGE AND ROAD, LTD.
HIGHWAY 19 CONSTRUCTION LLC
PREPARING ROW
STA 321.800 $1,500.000 $750.000 $850.000 $1,000.000 $600.000 $900.000 $550.000
REMOVING CONC (DRIVEWAYS)
SY 129.000 $19.000 $25.000 $22.000 $22.000 $41.000 $20.000 $25.000
EXCAVATION (ROADWAY)
CY 16,775.200 $8.500 $17.000 $8.000 $10.250 $11.000 $8.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 9,766.900 $15.000 $17.000 $8.000 $11.900 $22.000 $12.000 $17.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 441.000 $25.000 $35.000 $25.000 $24.200 $35.000 $24.000 $30.000
BACKFILL (TY A)
STA 350.300 $250.000 $200.000 $170.000 $130.000 $200.000 $245.000 $350.000
BACKFILL (TY A)
LF 32,180.000 $5.850 $1.250 $1.700 $0.800 $0.800 $1.500 $10.000
BLADING
STA 112.000 $200.000 $200.000 $70.000 $500.000 $215.000 $190.000 $350.000
FURNISHING AND PLACING TOPSOIL (4")
SY 107,267.000 $1.450 $0.600 $0.900 $1.050 $2.000 $1.500 $4.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 87,714.000 $0.250 $0.140 $0.090 $0.100 $0.100 $0.110 $0.120
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 175,427.000 $0.730 $0.670 $0.750 $0.720 $0.700 $0.840 $0.660
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 87,714.000 $0.650 $0.650 $0.670 $0.640 $0.650 $0.750 $0.600
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 87,714.000 $0.650 $0.650 $0.670 $0.640 $0.650 $0.730 $0.600
VEGETATIVE WATERING
MG 5,789.000 $11.500 $5.000 $8.000 $0.010 $25.000 $1.000 $10.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 35,431.000 $15.000 $15.000 $15.500 $16.350 $24.000 $17.000 $35.000
LIME (HYDRATED LIME (DRY))
TON 792.000 $189.000 $160.000 $165.000 $180.000 $165.000 $220.000 $250.000
LIME TRT (EXST MATL)(8")
SY 38,264.000 $3.200 $2.000 $3.300 $1.150 $4.700 $3.000 $6.000
CEMENT
TON 792.000 $150.000 $200.000 $165.000 $160.000 $175.000 $205.000 $180.000
CEMENT TREAT(EXIST MATL)(8")
SY 38,264.000 $2.600 $4.000 $3.300 $1.250 $4.000 $2.750 $4.000
PRIME COAT & BLOTTER (MC-30)
GAL 10,587.000 $5.000 $4.000 $4.000 $4.300 $6.000 $4.250 $4.500
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 4,291.000 $4.300 $3.500 $3.800 $4.950 $5.000 $4.000 $4.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 182,802.000 $3.050 $3.250 $3.300 $3.800 $3.400 $4.000 $4.500
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 4,352.000 $107.000 $125.000 $120.000 $150.000 $130.000 $170.000 $140.000
D-GR HMA(SQ) TY-D PG64-22
TON 781.000 $130.000 $140.000 $180.000 $200.000 $152.000 $150.000 $120.000
PFC (ASPHALT) PG76-22
TON 1,674.000 $125.000 $125.000 $140.000 $140.000 $0.010 $140.000 $130.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 26,231.000 $125.000 $125.000 $140.000 $140.000 $155.000 $140.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 3,500.000 $54.000 $45.000 $50.000 $48.500 $57.000 $62.000 $90.000
PLANE ASPH CONC PAV (6")
SY 14,320.000 $4.300 $5.000 $3.800 $4.300 $5.400 $5.300 $15.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 1,466.000 $2.500 $5.000 $4.000 $4.750 $5.650 $4.500 $8.000
FLOWABLE BACKFILL
CY 14.000 $225.000 $350.000 $210.000 $230.000 $220.000 $300.000 $180.000
TEMPORARY SPL SHORING
SF 1,895.000 $25.000 $50.000 $42.000 $27.500 $26.000 $35.000 $55.000
CL B CONC (FLUME)
CY 4.000 $500.000 $750.000 $1,050.000 $880.000 $820.000 $600.000 $800.000
CL E CONC (SEAL SLAB)(NON-REINF)
CY 4.000 $500.000 $500.000 $1,050.000 $1,100.000 $1,025.000 $450.000 $750.000
RIPRAP (CONC)(5 IN)
CY 2.000 $530.000 $750.000 $1,050.000 $660.000 $615.000 $875.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 160.000 $450.000 $550.000 $630.000 $650.000 $545.000 $510.000 $450.000
RETROFIT RAIL (TY T131RC)
LF 348.000 $170.000 $225.000 $189.700 $198.000 $225.000 $195.000 $203.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 54.000 $430.000 $500.000 $525.000 $420.000 $400.000 $550.000 $600.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 8.000 $450.000 $550.000 $577.500 $560.000 $535.000 $700.000 $500.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 50.000 $475.000 $700.000 $577.500 $495.000 $475.000 $720.000 $650.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 7.000 $520.000 $750.000 $682.500 $845.000 $810.000 $880.000 $800.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 13.000 $700.000 $850.000 $735.000 $1,020.000 $970.000 $950.000 $900.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 20.000 $575.000 $900.000 $756.000 $910.000 $870.000 $975.000 $900.000
RC PIPE (CL III)(18 IN)
LF 1,812.000 $38.000 $50.000 $50.400 $55.000 $52.000 $48.000 $38.000
RC PIPE (CL III)(24 IN)
LF 144.000 $55.000 $70.000 $63.000 $77.000 $73.000 $70.000 $55.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $4,500.000 $6,000.000 $4,725.000 $5,500.000 $5,300.000 $6,000.000 $5,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $12,000.000 $20,000.000 $21,000.000 $16,500.000 $16,000.000 $18,000.000 $15,000.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $17,000.000 $25,000.000 $30,450.000 $19,200.000 $18,500.000 $22,000.000 $18,700.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $25,000.000 $30,000.000 $38,850.000 $25,600.000 $24,500.000 $30,000.000 $22,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $23,000.000 $35,000.000 $48,037.500 $32,200.000 $31,000.000 $32,000.000 $32,000.000
SET (TY I)(S=3 FT)(HW=2FT)(4:1)(C)
EA 3.000 $7,000.000 $6,000.000 $3,465.000 $2,500.000 $2,400.000 $5,000.000 $8,500.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 2.000 $7,800.000 $7,000.000 $5,544.000 $3,200.000 $3,000.000 $5,750.000 $9,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 3.000 $7,952.000 $7,500.000 $6,300.000 $3,750.000 $3,600.000 $8,000.000 $10,500.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $9,000.000 $8,000.000 $8,190.000 $5,050.000 $5,000.000 $8,500.000 $11,700.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $9,000.000 $9,000.000 $9,030.000 $6,050.000 $6,000.000 $8,750.000 $12,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 87.000 $600.000 $750.000 $787.500 $935.000 $900.000 $650.000 $684.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $900.000 $1,500.000 $892.500 $1,200.000 $1,200.000 $1,050.000 $1,156.000
REMOV STR (PIPE)
EA 47.000 $400.000 $300.000 $315.000 $16.600 $16.000 $250.000 $300.000
MOBILIZATION
LS 1.000 $970,000.000 $1,000,000.000 $750,000.000 $1,221,000.000 $735,000.000 $1,100,000.000 $1,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 28.000 $5,500.000 $5,000.000 $7,500.000 $10,000.000 $10,000.000 $3,200.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 640.000 $28.500 $25.000 $33.000 $26.000 $27.000 $28.000 $25.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 560.000 $31.500 $30.000 $38.000 $27.000 $28.000 $30.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 1,200.000 $9.000 $5.000 $12.000 $11.080 $8.000 $8.250 $10.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 105.000 $20.000 $30.000 $23.000 $21.000 $29.000 $25.000 $50.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 400.000 $75.000 $50.000 $55.000 $0.010 $195.000 $250.000 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,590.000 $2.600 $3.000 $2.100 $2.890 $3.000 $3.200 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,590.000 $0.850 $0.500 $0.450 $0.350 $0.400 $0.400 $0.500
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 400.000 $95.000 $50.000 $80.000 $0.010 $200.000 $250.000 $50.000
INTERSECTIONS (ACP)
SY 3,343.000 $44.000 $30.000 $38.000 $60.000 $45.000 $49.250 $85.000
DRIVEWAYS (ACP)
SY 5,112.000 $35.000 $25.000 $29.000 $44.450 $40.000 $32.750 $65.000
DRIVEWAYS (CONC) (HES)
SY 151.000 $86.000 $150.000 $135.000 $117.000 $82.000 $125.000 $110.000
RUMBLE STRIPS (SHOULDER)
LF 184,384.000 $0.180 $0.150 $0.160 $0.180 $0.200 $0.140 $0.100
RUMBLE STRIPS (CENTERLINE)
LF 68,212.000 $0.180 $0.150 $0.160 $0.180 $0.200 $0.140 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 1,737.500 $21.000 $30.000 $23.000 $28.600 $25.000 $26.000 $21.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,550.000 $2,000.000 $1,800.000 $2,330.000 $3,200.000 $1,650.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,262.500 $2.300 $3.000 $2.600 $2.750 $2.050 $2.200 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $170.000 $500.000 $160.000 $165.000 $160.000 $165.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $2,600.000 $2,800.000 $2,700.000 $2,800.000 $2,900.000 $3,025.000 $2,625.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $250.000 $250.000 $260.000 $275.000 $205.000 $220.000 $250.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 46.000 $266.000 $250.000 $240.000 $235.000 $300.000 $315.000 $250.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 16.000 $300.000 $260.000 $250.000 $240.000 $345.000 $360.000 $250.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 79.000 $450.000 $550.000 $540.000 $360.000 $495.000 $520.000 $550.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 48.000 $610.000 $650.000 $690.000 $735.000 $800.000 $840.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 6.000 $750.000 $850.000 $890.000 $980.000 $1,000.000 $1,095.000 $850.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 11.000 $980.000 $1,200.000 $1,200.000 $1,250.000 $1,300.000 $1,360.000 $400.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 100.000 $360.000 $450.000 $450.000 $375.000 $485.000 $510.000 $450.000
REMOVE SM RD SN SUP&AM
EA 165.000 $105.000 $75.000 $110.000 $82.500 $100.000 $105.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 64.000 $32.000 $50.000 $26.000 $27.500 $26.000 $28.000 $62.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 58.000 $50.000 $65.000 $65.000 $44.000 $47.000 $50.000 $35.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 7,280.000 $0.350 $0.150 $0.150 $0.220 $0.150 $0.160 $0.150
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 137,020.000 $0.200 $0.150 $0.150 $0.200 $0.150 $0.160 $0.150
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,040.000 $0.650 $0.400 $0.350 $0.520 $0.400 $0.380 $0.350
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 486.000 $2.400 $2.000 $2.000 $2.000 $2.050 $2.200 $2.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 4,680.000 $0.300 $0.150 $0.150 $0.200 $0.150 $0.160 $0.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 134,890.000 $0.300 $0.150 $0.150 $0.200 $0.150 $0.420 $0.150
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 658.000 $0.900 $1.000 $0.750 $1.850 $2.200 $1.200 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,038.000 $0.900 $1.000 $0.750 $1.750 $2.000 $1.200 $1.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 15,107.000 $0.900 $1.500 $0.750 $1.300 $1.700 $1.400 $2.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 785.000 $1.000 $1.000 $1.050 $0.710 $1.030 $1.100 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,145.000 $1.000 $1.000 $0.850 $0.880 $0.850 $0.880 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 486.000 $5.350 $6.000 $5.800 $6.600 $5.800 $6.050 $6.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 7,100.000 $0.350 $0.470 $0.500 $0.420 $0.500 $0.500 $0.460
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 134,620.000 $0.350 $0.400 $0.400 $0.370 $0.390 $0.420 $0.380
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,240.000 $0.350 $0.470 $0.500 $0.370 $0.500 $0.500 $0.460
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 142,255.000 $0.350 $0.400 $0.400 $0.370 $0.390 $0.420 $0.380
PREFAB PAV MRK TY C (W) (ARROW)
EA 16.000 $200.000 $200.000 $200.000 $245.000 $200.000 $205.000 $188.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 4.000 $550.000 $360.000 $370.000 $440.000 $370.000 $390.000 $355.000
PREFAB PAV MRK TY C (W) (WORD)
EA 16.000 $275.000 $230.000 $240.000 $325.000 $240.000 $250.000 $228.000
PREFAB PAV MRK TY C (Y) (4") (SLD)
LF 488.000 $2.750 $4.000 $4.200 $3.000 $4.100 $4.400 $4.000
REFL PAV MRKR TY I-A
EA 396.000 $3.500 $4.000 $3.700 $4.250 $3.700 $3.850 $4.000
REFL PAV MRKR TY I-C
EA 491.000 $3.250 $4.000 $3.700 $4.250 $3.700 $3.850 $4.000
REFL PAV MRKR TY II-A-A
EA 3,509.000 $3.050 $4.000 $3.300 $4.250 $3.300 $3.500 $3.000
SP MIXES SP-B PG64-22
TON 5,639.000 $95.000 $85.000 $89.000 $83.970 $108.000 $112.000 $130.000
SP MIXES SP-C PG64-22
TON 17,126.000 $150.000 $85.000 $93.000 $92.000 $105.000 $110.000 $150.000
TACK COAT
GAL 6,615.000 $2.750 $3.000 $3.200 $0.010 $3.750 $3.500 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,500.000 $10,000.000 $15,000.000 $18,000.000 $10,000.000 $16,000.000 $10,000.000
TMA (STATIONARY)
DAY 310.000 $130.000 $150.000 $175.000 $0.010 $65.000 $200.000 $250.000
TMA (MOBILE OPERATION)
DAY 60.000 $85.000 $250.000 $50.000 $900.000 $150.000 $200.000 $500.000
Totals: $13,424,556.290 $12,108,565.850 $12,422,020.680 $13,149,022.545 $13,854,600.365 $13,940,301.830 $16,294,299.100