Job Info for 0095-06-073

County: VAN ZANDT Highway: US 80 Date: 02/06/2020 (4 years ago) Engineer's Estimate: $2,971,188 Control Number: 0095-06-073
Project: STP 2020(560)HES District: TYLER Time: 185 WORKING DAYS Type: IMPROVING DRAINAGE, CULVERTS, UPGRADE GUARD RAIL

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,971,187.50
BAKER & COMPANY CONSTRUCTION, LLC   $2,544,980.75 1
-14.34% | -$426,206.75
HIGHWAY 19 CONSTRUCTION LLC   $2,712,298.00 2
-8.71% | -$258,889.50
6.57% | $167,317.25
STATELINE CONSTRUCTION, LLC   $2,746,583.00 3
-7.56% | -$224,604.50
7.92% | $201,602.25
1.26% | $34,285.00
SJ&J CONSTRUCTION, LLC   $2,914,576.00 4
-1.91% | -$56,611.50
14.52% | $369,595.25
6.12% | $167,993.00
LONGVIEW BRIDGE AND ROAD, LTD.   $3,098,660.00 5
4.29% | $127,472.50
21.76% | $553,679.25
6.32% | $184,084.00
EAST TEXAS BRIDGE, INC.   $3,135,532.00 6
5.53% | $164,344.50
23.2% | $590,551.25
1.19% | $36,872.00
ALTUS CONSTRUCTION LLC   $3,266,317.91 7
9.93% | $295,130.41
28.34% | $721,337.16
4.17% | $130,785.91
PIERCE R & B LLC   $3,287,323.00 8
10.64% | $316,135.50
29.17% | $742,342.25
0.64% | $21,005.09
FNH CONSTRUCTION, LLC   $4,694,792.00 9
58.01% | $1,723,604.50
84.47% | $2,149,811.25
42.82% | $1,407,469.00

Bid Items

Items: 76, 0 filtered
VAN ZANDT US 80  |  TYLER  |  0095-06-073  |  02/06/2020  |  $2,971,188  |  STP 2020(560)HES  |  IMPROVING DRAINAGE, CULVERTS, UPGRADE GUARD RAIL  |  185 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate BAKER & COMPANY CONSTRUCTION, LLC HIGHWAY 19 CONSTRUCTION LLC STATELINE CONSTRUCTION, LLC SJ&J CONSTRUCTION, LLC LONGVIEW BRIDGE AND ROAD, LTD. EAST TEXAS BRIDGE, INC. ALTUS CONSTRUCTION LLC PIERCE R & B LLC FNH CONSTRUCTION, LLC
100 6007 PREP ROW (TREE)(GREATER THAN 24" DIA) EA 2.000 $3,000.000 $2,800.000 $1,500.000 $1,200.000 $500.000 $2,600.000 $1,500.000 $3,430.900 $4,500.000 $5,000.000
104 6009 REMOVING CONC (RIPRAP) SY 1,251.000 $11.000 $4.000 $15.000 $13.000 $5.000 $14.000 $18.000 $8.110 $18.000 $50.000
104 6017 REMOVING CONC (DRIVEWAYS) SY 2,085.000 $15.000 $7.150 $15.000 $12.000 $15.000 $18.000 $18.000 $17.510 $20.000 $20.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 674.000 $18.750 $34.000 $30.000 $22.000 $12.000 $24.000 $30.000 $38.090 $32.000 $50.000
150 6002 BLADING HR 100.000 $115.000 $225.000 $250.000 $110.000 $80.000 $255.000 $100.000 $204.550 $200.000 $150.000
158 6003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 50.000 $170.000 $280.000 $100.000 $110.000 $80.000 $255.000 $125.000 $147.210 $175.000 $150.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 18,300.000 $2.000 $2.250 $4.000 $3.500 $2.500 $2.000 $2.850 $0.980 $3.500 $8.000
162 6002 BLOCK SODDING SY 100.000 $7.000 $10.600 $10.000 $8.000 $4.000 $22.000 $6.000 $11.830 $12.000 $8.000
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 18,300.000 $0.900 $1.000 $0.750 $0.900 $0.500 $1.050 $0.800 $0.890 $1.000 $1.000
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 9,150.000 $0.500 $0.500 $0.600 $0.800 $0.400 $1.050 $0.750 $0.710 $1.000 $1.000
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 9,150.000 $0.500 $0.500 $0.600 $0.800 $0.300 $1.050 $0.750 $0.710 $1.000 $1.000
168 6001 VEGETATIVE WATERING MG 403.000 $15.000 $22.500 $10.000 $25.000 $20.000 $5.000 $10.000 $17.750 $15.000 $55.000
401 6001 FLOWABLE BACKFILL CY 19.000 $182.000 $280.000 $250.000 $310.000 $150.000 $460.000 $275.000 $188.170 $350.000 $350.000
420 6071 CL C CONC (COLLAR) EA 1.000 $800.000 $1,120.000 $1,000.000 $1,500.000 $800.000 $2,600.000 $1,500.000 $1,478.270 $1,200.000 $1,500.000
432 6001 RIPRAP (CONC)(4 IN) CY 30.000 $400.000 $460.000 $500.000 $485.000 $500.000 $625.000 $675.000 $454.360 $600.000 $650.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 267.000 $475.000 $480.000 $400.000 $435.000 $500.000 $500.000 $445.000 $441.290 $525.000 $450.000
451 6004 RETROFIT RAIL (TY T131RC) LF 407.000 $187.000 $146.000 $175.000 $175.000 $140.000 $190.000 $220.000 $169.690 $190.000 $165.000
451 6019 RETROFIT RAIL (TY T631) LF 369.000 $101.500 $67.000 $85.000 $90.000 $90.000 $115.000 $200.000 $100.570 $100.000 $165.000
462 6045 CONC BOX CULV (3 FT X 2 FT)(EXTEND) LF 4.000 $500.000 $855.000 $500.000 $800.000 $500.000 $2,000.000 $700.000 $868.820 $1,850.000 $3,000.000
464 6003 RC PIPE (CL III)(18 IN) LF 1,312.000 $50.000 $32.000 $42.000 $41.000 $80.000 $40.000 $42.000 $48.830 $40.000 $80.000
464 6005 RC PIPE (CL III)(24 IN) LF 5,218.000 $60.000 $48.000 $53.000 $58.000 $96.000 $55.000 $55.000 $67.920 $64.000 $95.000
465 6372 INLET (COMPL) (DROP) (SPL) EA 6.000 $4,000.000 $5,000.000 $5,000.000 $3,540.000 $3,000.000 $7,500.000 $5,000.000 $4,930.210 $6,200.000 $8,000.000
466 6179 WINGWALL (PW - 1) (HW=4 FT) EA 1.000 $6,600.000 $11,300.000 $4,187.000 $14,225.000 $11,000.000 $10,500.000 $11,000.000 $10,030.900 $10,500.000 $12,500.000
467 6091 SET (TY I)(S=2 FT)(HW=3FT)(4:1)(C) EA 1.000 $5,200.000 $8,300.000 $5,482.000 $4,425.000 $5,000.000 $5,500.000 $4,000.000 $7,315.460 $5,000.000 $7,500.000
467 6096 SET (TY I)(S=2 FT)(HW=4FT)(4:1)(C) EA 2.000 $5,300.000 $9,000.000 $5,600.000 $4,425.000 $5,500.000 $5,500.000 $5,500.000 $7,315.460 $7,000.000 $8,500.000
467 6112 SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C) EA 9.000 $5,400.000 $9,300.000 $6,500.000 $6,100.000 $6,000.000 $6,500.000 $6,000.000 $7,315.460 $8,000.000 $9,000.000
467 6144 SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C) EA 1.000 $5,500.000 $10,400.000 $7,000.000 $5,970.000 $6,500.000 $5,750.000 $7,500.000 $8,870.120 $8,500.000 $11,500.000
467 6150 SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C) EA 2.000 $5,600.000 $10,100.000 $7,682.000 $7,550.000 $7,000.000 $7,000.000 $7,500.000 $10,105.340 $8,750.000 $12,500.000
467 6155 SET (TY I)(S= 4 FT)(HW= 6 FT)(4:1) (C) EA 1.000 $5,700.000 $12,125.000 $8,000.000 $7,550.000 $7,500.000 $8,600.000 $8,500.000 $12,075.300 $8,750.000 $15,000.000
467 6219 SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C) EA 2.000 $6,000.000 $11,115.000 $10,000.000 $11,250.000 $7,500.000 $7,500.000 $10,000.000 $13,885.530 $16,000.000 $16,500.000
467 6224 SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C) EA 4.000 $6,200.000 $14,000.000 $10,568.000 $13,500.000 $8,000.000 $10,000.000 $13,500.000 $11,450.700 $16,000.000 $20,000.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 79.000 $950.000 $575.000 $550.000 $585.000 $800.000 $625.000 $610.000 $1,071.260 $675.000 $1,850.000
467 6388 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1.000 $960.000 $1,100.000 $600.000 $550.000 $1,100.000 $735.000 $650.000 $1,081.380 $800.000 $2,000.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 250.000 $970.000 $900.000 $825.000 $785.000 $1,000.000 $940.000 $935.000 $1,466.820 $1,050.000 $2,000.000
480 6001 CLEAN EXIST CULVERTS EA 36.000 $2,700.000 $1,500.000 $1,000.000 $1,200.000 $1,000.000 $3,500.000 $1,200.000 $1,785.050 $1,000.000 $2,500.000
496 6006 REMOV STR (HEADWALL) EA 24.000 $2,000.000 $670.000 $500.000 $1,000.000 $300.000 $325.000 $1,800.000 $1,231.910 $1,100.000 $2,500.000
496 6050 REMOV STR (DRIVEWAY CULVERT) EA 182.000 $300.000 $300.000 $250.000 $500.000 $300.000 $225.000 $300.000 $734.910 $450.000 $850.000
500 6001 MOBILIZATION LS 1.000 $265,000.000 $152,000.000 $250,000.000 $255,000.000 $100,000.000 $275,000.000 $285,000.000 $325,368.060 $320,000.000 $500,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 10.000 $2,500.000 $3,000.000 $5,000.000 $2,900.000 $4,000.000 $3,500.000 $12,000.000 $11,831.570 $10,000.000 $8,500.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 5,760.000 $30.000 $28.000 $25.000 $27.000 $15.000 $33.000 $30.000 $29.580 $28.000 $30.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 5,760.000 $10.000 $7.000 $5.000 $7.000 $6.000 $10.000 $7.000 $5.920 $5.500 $15.000
506 6029 EARTHWORK (EROSN & SEDMT CONT, IN VEH) CY 200.000 $25.000 $45.000 $15.000 $75.000 $6.000 $25.000 $40.000 $14.200 $65.000 $50.000
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 100.000 $55.000 $106.000 $1.000 $55.000 $50.000 $255.000 $125.000 $82.820 $55.000 $150.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 18,360.000 $2.800 $3.000 $2.250 $2.850 $2.000 $2.550 $2.750 $2.660 $2.500 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 18,360.000 $1.000 $0.750 $0.500 $0.750 $1.000 $0.850 $0.500 $0.590 $1.000 $2.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 400.000 $4.500 $5.600 $4.000 $5.500 $4.000 $4.400 $7.000 $4.730 $5.000 $18.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 400.000 $2.000 $1.150 $1.000 $1.100 $1.000 $2.200 $1.000 $1.180 $2.000 $9.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 900.000 $76.000 $44.000 $78.000 $65.000 $50.000 $85.000 $75.000 $29.580 $70.000 $90.000
512 6029 PORT CTB (MOVE)(F-SHAPE)(TY 1) LF 900.000 $9.000 $3.300 $15.000 $14.000 $55.000 $10.000 $10.000 $6.690 $20.000 $30.000
512 6041 PORT CTB (STKPL)(F-SHAPE)(TY 1) LF 900.000 $10.500 $3.300 $25.000 $28.000 $25.000 $18.000 $10.000 $15.690 $20.000 $30.000
530 6002 INTERSECTIONS (ACP) SY 486.000 $42.000 $50.000 $65.000 $65.000 $50.000 $60.000 $50.000 $36.670 $55.000 $42.000
530 6005 DRIVEWAYS (ACP) SY 6,710.000 $48.000 $32.000 $46.000 $43.000 $50.000 $44.000 $38.000 $35.200 $48.000 $42.000
530 6017 DRIVEWAYS (CONC) (HES) SY 2,145.000 $100.000 $75.000 $86.000 $65.000 $125.000 $120.000 $135.000 $91.770 $105.000 $125.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 3,000.000 $25.500 $20.000 $16.000 $19.000 $30.000 $21.000 $21.000 $18.930 $21.000 $25.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,550.000 $1,650.000 $1,325.000 $1,375.000 $1,800.000 $1,500.000 $1,500.000 $1,567.680 $1,485.000 $1,850.000
540 6014 SHORT RADIUS LF 50.000 $40.000 $23.000 $60.000 $42.000 $40.000 $50.000 $50.000 $70.990 $50.000 $50.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 7.000 $1,100.000 $1,120.000 $975.000 $1,100.000 $1,100.000 $1,250.000 $1,250.000 $1,153.580 $1,240.000 $1,850.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 125.000 $80.000 $50.000 $82.000 $78.000 $55.000 $90.000 $90.000 $97.020 $90.000 $40.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,475.000 $2.500 $2.500 $2.000 $2.000 $3.000 $2.200 $2.200 $2.370 $3.000 $4.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 3.000 $300.000 $112.000 $200.000 $500.000 $300.000 $220.000 $220.000 $236.630 $220.000 $650.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 25.000 $2,800.000 $2,800.000 $2,500.000 $2,375.000 $2,635.000 $2,700.000 $2,800.000 $2,957.890 $2,700.000 $3,200.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 10.000 $250.000 $250.000 $200.000 $500.000 $600.000 $220.000 $220.000 $295.790 $220.000 $1,500.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 4.000 $2,300.000 $1,500.000 $1,500.000 $1,200.000 $1,000.000 $2,200.000 $2,200.000 $1,514.440 $3,000.000 $5,000.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $980.000 $785.000 $1,000.000 $1,500.000 $1,000.000 $550.000 $550.000 $1,165.410 $550.000 $2,500.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000 $12,050.000 $9,000.000 $8,500.000 $8,125.000 $10,000.000 $11,000.000 $10,000.000 $8,027.720 $9,800.000 $20,000.000
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 1.000 $262.000 $840.000 $350.000 $850.000 $300.000 $525.000 $500.000 $598.250 $1,500.000 $650.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 1.000 $385.000 $925.000 $1,000.000 $950.000 $400.000 $935.000 $1,200.000 $342.510 $1,000.000 $650.000
658 6049 INSTL OM ASSM (OM-2Z)(FLX)GND(BI) EA 72.000 $48.000 $54.000 $50.000 $65.000 $35.000 $50.000 $50.000 $99.920 $50.000 $100.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 20.000 $30.000 $31.000 $39.000 $65.000 $20.000 $28.000 $30.000 $42.590 $30.000 $100.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 35.000 $40.000 $31.000 $37.000 $65.000 $25.000 $28.000 $30.000 $43.780 $30.000 $100.000
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 20.000 $30.000 $31.000 $39.000 $65.000 $25.000 $28.000 $30.000 $46.140 $30.000 $100.000
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 98.000 $16.000 $22.000 $20.000 $25.000 $60.000 $22.000 $25.000 $65.070 $25.000 $100.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 4.000 $275.000 $1,120.000 $250.000 $275.000 $400.000 $275.000 $300.000 $414.100 $300.000 $500.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 100.000 $83.000 $84.000 $70.000 $85.000 $100.000 $100.000 $150.000 $84.260 $125.000 $150.000
6185 6002 TMA (STATIONARY) DAY 129.000 $165.000 $205.000 $200.000 $145.000 $150.000 $125.000 $300.000 $295.790 $200.000 $400.000
6185 6005 TMA (MOBILE OPERATION) DAY 126.000 $50.000 $225.000 $200.000 $75.000 $150.000 $220.000 $300.000 $295.790 $220.000 $650.000
Totals: $2,971,187.50 $2,544,980.75 $2,712,298.00 $2,746,583.00 $2,914,576.00 $3,098,660.00 $3,135,532.00 $3,266,317.91 $3,287,323.00 $4,694,792.00