PREPARING ROW
|
AC
|
18.730
|
$6,000.000
|
$20,228.300
|
$10,000.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
291.250
|
$500.000
|
$380.310
|
$500.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
10,714.000
|
$55.000
|
$21.420
|
$55.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,548.000
|
$59.000
|
$30.000
|
$75.000
|
|
|
BLADING
|
LF
|
508.000
|
$7.000
|
$5.230
|
$15.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
34,983.000
|
$0.350
|
$0.170
|
$0.210
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
34,983.000
|
$0.350
|
$0.170
|
$0.210
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
69,964.000
|
$1.000
|
$0.660
|
$0.230
|
|
|
VEGETATIVE WATERING
|
MG
|
82.000
|
$40.000
|
$0.010
|
$75.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
29,125.000
|
$35.000
|
$64.920
|
$53.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
4,787.000
|
$4.500
|
$7.610
|
$10.000
|
|
|
PRIME COAT & BLOTTER (AE-P)
|
GAL
|
488.000
|
$6.000
|
$14.840
|
$15.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
12,622.000
|
$5.500
|
$5.420
|
$5.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
249.000
|
$185.000
|
$261.700
|
$300.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
6,953.000
|
$3.500
|
$7.080
|
$5.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$3,500.000
|
$1,100.000
|
$2,400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
80.000
|
$100.000
|
$1,200.000
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
42.000
|
$100.000
|
$104.500
|
$75.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
4.000
|
$130.000
|
$514.800
|
$240.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,200.000
|
$1,848.000
|
$1,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,150.000
|
$3,520.000
|
$3,500.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$650.000
|
$852.500
|
$1,400.000
|
|
|
REMOV STR (PIPE)
|
LF
|
42.000
|
$25.000
|
$66.000
|
$70.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$800,000.000
|
$800,000.000
|
$950,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$5,200.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
500.000
|
$50.000
|
$52.800
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
500.000
|
$15.000
|
$13.200
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
30,100.000
|
$10.000
|
$8.800
|
$8.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
30,100.000
|
$2.000
|
$1.100
|
$1.250
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,953.000
|
$48.000
|
$48.870
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
52,760.000
|
$0.200
|
$0.310
|
$0.230
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
26,380.000
|
$0.200
|
$0.400
|
$0.270
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
750.000
|
$36.000
|
$27.500
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,200.000
|
$2,678.500
|
$2,100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
926.000
|
$10.000
|
$4.950
|
$2.750
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,200.000
|
$3,091.000
|
$3,775.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$220.000
|
$275.000
|
$325.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
13.000
|
$350.000
|
$242.000
|
$275.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$350.000
|
$297.000
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$700.000
|
$632.500
|
$765.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$630.000
|
$770.000
|
$690.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$962.500
|
$815.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
4.000
|
$500.000
|
$550.000
|
$485.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
17.000
|
$150.000
|
$110.000
|
$75.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
1.000
|
$50.000
|
$63.800
|
$225.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
31.000
|
$40.000
|
$49.500
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
6,800.000
|
$1.000
|
$0.550
|
$0.630
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
58,900.000
|
$1.000
|
$0.220
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
40.000
|
$11.000
|
$5.500
|
$6.340
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
65,110.000
|
$1.000
|
$0.220
|
$0.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,050.000
|
$1.000
|
$1.500
|
$0.830
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
6,260.000
|
$1.000
|
$1.100
|
$1.270
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
58,895.000
|
$1.000
|
$0.770
|
$0.890
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
65,160.000
|
$1.000
|
$0.770
|
$0.890
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
40.000
|
$18.000
|
$22.000
|
$25.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
8.000
|
$500.000
|
$330.000
|
$380.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
313.000
|
$6.000
|
$5.500
|
$6.340
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,282.000
|
$6.000
|
$4.400
|
$5.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
14,074.000
|
$160.000
|
$163.840
|
$180.000
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
12,405.000
|
$130.000
|
$154.340
|
$180.000
|
|
|
TACK COAT
|
GAL
|
20,385.000
|
$6.000
|
$5.510
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$30,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
163.000
|
$350.000
|
$250.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$350.000
|
$50.000
|
$750.000
|
|
Totals: |
$8,132,488.100
|
$9,062,104.586
|
$9,851,983.650
|