Show Job Controls
Bid Cobra

TRAVIS VA (0914-00-525)

Items: 30

County: TRAVIS
Length: N/A
Highway: VA
District: AUSTIN
Control Number: 0914-00-525
DBE Goal: 0.0%
Project: F 2024(759)
Guaranty: N/A
Time: 730 WORKING DAYS
Engineer's Estimate: $2,018,995.00
Date: 02/01/2024 (2 years ago)
Contract Number: N/A
Type: REPLACE GUARDRAIL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,018,995.00
$1,649,750.00
Over/Under Est: -18.29% -$369,245.00
$1,695,799.00
Over/Under Est: -16.01% -$323,196.00
Amt Left: 2.79% $46,049.00
Over/Under Est: -5.93% -$119,695.00
Amt Left: 15.13% $249,550.00
Delta: -12.00% -$203,501.00

Bid Items & Bid Tabulations

30 Total 0 of 30
TRAVIS  |  VA  |  AUSTIN  |  0914-00-525  |  02/01/2024  |  $2,018,995.00  |  F 2024(759)  |  REPLACE GUARDRAIL  |  730 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HAZMAT INTERNATIONAL, INC.
DIGG COMMERCIAL, LLC
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONCRETE(MOW STRIP)
LF 40.000 $15.000 $25.000 $1,000.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $650.000 $500.000 $1,000.000 $500.000
RETROFIT RAIL (TY T221)
LF 200.000 $275.000 $150.000 $80.000 $250.000
MOBILIZATION (CALLOUT)
EA 100.000 $1,500.000 $500.000 $1.000 $1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $7,000.000 $3,500.000 $1.000 $5,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $8.000 $15.000 $50.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $2.000 $10.000 $5.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,000.000 $27.000 $18.000 $30.000 $32.000
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $35.000 $26.000 $50.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 20.000 $2,500.000 $500.000 $1,100.000 $4,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 150.000 $1,500.000 $500.000 $750.000 $1,500.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 150.000 $1,318.520 $300.000 $400.000 $800.000
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $4.000 $1.000 $1.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 50.000 $350.000 $200.000 $1.000 $150.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 25.000 $250.000 $50.000 $200.000 $100.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 20.000 $300.000 $50.000 $200.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $3,350.000 $2,750.000 $2,105.000 $2,800.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 10.000 $75.000 $60.000 $50.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 50.000 $17.600 $35.000 $50.000 $10.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 10.000 $35.000 $35.000 $50.000 $10.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 50.000 $35.970 $35.000 $50.000 $10.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 10.000 $95.000 $120.000 $50.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 60.000 $39.600 $60.000 $50.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 50.000 $40.250 $60.000 $50.000 $30.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 2,000.000 $35.000 $40.000 $75.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 1,000.000 $40.000 $85.000 $100.000 $90.000
REALIGN POSTS
EA 200.000 $50.000 $10.000 $300.000 $75.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 200.000 $3,500.000 $3,200.000 $1,600.000 $2,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 80.000 $100.000 $50.000 $200.000 $100.000
TMA (STATIONARY)
DAY 100.000 $225.000 $3,200.000 $5,000.000 $2,250.000
Totals: $2,018,995.000 $1,649,750.000 $1,695,799.000 $1,899,300.000