PREPARING ROW
|
STA
|
46.000
|
$2,880.000
|
$10,500.000
|
$3,699.630
|
$1,100.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
714.000
|
$40.000
|
$13.000
|
$25.770
|
$33.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
2,486.000
|
$10.000
|
$7.000
|
$16.650
|
$7.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
154.000
|
$8.210
|
$60.000
|
$66.600
|
$84.000
|
|
|
REMOVING CONC (HEADWALL)
|
CY
|
7.000
|
$484.100
|
$535.000
|
$666.000
|
$605.000
|
|
|
REMOVING STAB BASE & ASPH PAV(15"-20")
|
SY
|
8,354.000
|
$6.890
|
$9.850
|
$12.270
|
$18.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,255.000
|
$14.640
|
$14.500
|
$17.790
|
$19.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
11,836.000
|
$7.840
|
$15.500
|
$22.950
|
$13.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
33,637.000
|
$1.040
|
$1.200
|
$2.190
|
$1.600
|
|
|
BROADCAST SEED (PERM) (URBAN) (CLAY)
|
SY
|
33,637.000
|
$0.200
|
$0.180
|
$0.200
|
$0.200
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
33,637.000
|
$0.110
|
$0.150
|
$0.200
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
569.000
|
$22.280
|
$25.000
|
$13.140
|
$40.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
33,637.000
|
$0.900
|
$1.030
|
$1.500
|
$1.700
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
1,672.000
|
$53.320
|
$55.000
|
$85.320
|
$68.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
136.000
|
$103.130
|
$155.000
|
$210.000
|
$190.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
7,807.000
|
$2.750
|
$4.050
|
$4.560
|
$7.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
1,504.000
|
$4.200
|
$4.000
|
$5.430
|
$5.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
6,122.000
|
$115.000
|
$70.000
|
$90.900
|
$77.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
932.000
|
$79.060
|
$95.000
|
$114.210
|
$104.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
9,089.000
|
$111.690
|
$119.000
|
$136.050
|
$135.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
80.000
|
$95.830
|
$132.000
|
$128.700
|
$144.000
|
|
|
TOM - C (AGGREGATE) SAC - B
|
TON
|
1,199.000
|
$97.120
|
$129.000
|
$128.700
|
$144.000
|
|
|
TACK COAT
|
GAL
|
284.000
|
$2.970
|
$5.000
|
$3.830
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,046.000
|
$29.590
|
$50.000
|
$54.340
|
$46.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
101,060.000
|
$1.680
|
$1.500
|
$1.910
|
$3.000
|
|
|
CEM STABIL BKFL
|
CY
|
620.000
|
$147.710
|
$122.000
|
$175.000
|
$145.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
72.000
|
$137.430
|
$115.000
|
$175.000
|
$145.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
14.000
|
$135.510
|
$115.000
|
$175.000
|
$155.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,307.000
|
$5.110
|
$3.250
|
$12.000
|
$2.500
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
36.000
|
$437.620
|
$325.000
|
$330.020
|
$390.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
7.000
|
$120.000
|
$74.000
|
$73.110
|
$86.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
30.000
|
$410.000
|
$365.000
|
$370.750
|
$434.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
351.000
|
$551.340
|
$545.000
|
$552.470
|
$646.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
22.000
|
$536.330
|
$475.000
|
$807.040
|
$904.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
44.000
|
$581.950
|
$510.000
|
$644.500
|
$665.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
87.000
|
$600.000
|
$475.000
|
$598.690
|
$662.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
67.000
|
$509.460
|
$450.000
|
$698.150
|
$674.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
19.000
|
$482.600
|
$175.000
|
$245.030
|
$195.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
258.000
|
$431.370
|
$475.000
|
$610.170
|
$555.000
|
|
|
RIPRAP (CONC) (CHANNEL) (4IN)
|
CY
|
49.000
|
$500.000
|
$445.000
|
$792.080
|
$682.000
|
|
|
RAIL (TY SSTR)
|
LF
|
74.000
|
$72.250
|
$160.000
|
$358.800
|
$125.000
|
|
|
RETROFIT RAIL (TY T552)
|
LF
|
87.000
|
$250.000
|
$200.000
|
$343.080
|
$132.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
24.000
|
$351.320
|
$500.000
|
$640.000
|
$720.000
|
|
|
JOINT SEALANT
|
LF
|
112.000
|
$12.090
|
$25.000
|
$16.000
|
$23.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
1,127.000
|
$72.280
|
$100.000
|
$125.000
|
$230.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
146.000
|
$1,257.790
|
$620.000
|
$1,200.000
|
$930.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
33.000
|
$67.500
|
$160.000
|
$200.000
|
$110.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
776.000
|
$130.000
|
$82.000
|
$120.000
|
$103.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
117.000
|
$230.000
|
$200.000
|
$210.000
|
$190.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
4.000
|
$4,782.030
|
$5,700.000
|
$8,200.000
|
$4,200.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
2.000
|
$5,743.090
|
$5,800.000
|
$6,200.000
|
$4,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$4,920.850
|
$4,200.000
|
$4,800.000
|
$3,200.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$4,718.100
|
$4,900.000
|
$5,800.000
|
$4,200.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX5FT-3FTX5FT)
|
EA
|
2.000
|
$7,100.000
|
$6,700.000
|
$9,200.000
|
$5,300.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,618.260
|
$6,700.000
|
$8,200.000
|
$4,500.000
|
|
|
INLET (COMPL)(CURB)(TY 1)(10')
|
EA
|
1.000
|
$3,987.380
|
$5,400.000
|
$8,800.000
|
$7,100.000
|
|
|
WINGWALL (FW - S) (HW=3 FT)
|
EA
|
1.000
|
$6,978.570
|
$25,000.000
|
$18,000.000
|
$37,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,057.390
|
$1,900.000
|
$1,600.000
|
$2,900.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,200.000
|
$1,900.000
|
$1,800.000
|
$2,800.000
|
|
|
SLOT DRAIN OUTFALL (GAL STL) (18 IN)
|
LF
|
222.000
|
$554.300
|
$105.000
|
$150.000
|
$290.000
|
|
|
REMOV STR (INLET)
|
EA
|
5.000
|
$1,022.580
|
$1,000.000
|
$750.000
|
$960.000
|
|
|
REMOV STR (PIPE)
|
LF
|
875.000
|
$19.390
|
$15.000
|
$20.000
|
$39.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$750,400.000
|
$820,000.000
|
$931,803.650
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$8,689.250
|
$15,000.000
|
$17,820.000
|
$23,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
342.000
|
$33.760
|
$26.000
|
$25.000
|
$28.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
60.000
|
$52.370
|
$48.000
|
$46.000
|
$52.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
402.000
|
$10.820
|
$14.000
|
$14.000
|
$16.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
80.000
|
$20.000
|
$26.000
|
$25.000
|
$28.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
80.000
|
$12.000
|
$21.000
|
$20.000
|
$22.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
970.000
|
$2.530
|
$5.000
|
$5.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
970.000
|
$0.650
|
$1.550
|
$1.500
|
$1.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
683.000
|
$2.290
|
$5.200
|
$5.000
|
$5.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
683.000
|
$1.000
|
$1.550
|
$1.500
|
$1.700
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
3,280.000
|
$75.000
|
$10.300
|
$20.000
|
$19.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$75.000
|
$42.700
|
$40.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,200.000
|
$5.180
|
$6.000
|
$16.000
|
$21.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
100.000
|
$12.890
|
$30.000
|
$36.000
|
$21.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
3,280.000
|
$25.000
|
$6.500
|
$12.000
|
$19.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$25.000
|
$30.000
|
$34.000
|
$19.000
|
|
|
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
|
LF
|
3,600.000
|
$19.600
|
$8.250
|
$18.000
|
$19.000
|
|
|
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
|
LF
|
6,150.000
|
$5.250
|
$8.000
|
$12.000
|
$19.000
|
|
|
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
|
LF
|
3,600.000
|
$19.600
|
$10.270
|
$10.000
|
$19.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
3,440.000
|
$14.590
|
$19.000
|
$18.610
|
$17.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
3,682.000
|
$16.240
|
$19.000
|
$18.830
|
$18.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,057.000
|
$21.840
|
$22.000
|
$21.300
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$1,910.180
|
$1,500.000
|
$1,885.830
|
$1,800.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
15.000
|
$1,181.360
|
$1,100.000
|
$1,091.360
|
$1,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,782.000
|
$1.750
|
$1.700
|
$1.640
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
17.000
|
$2,802.610
|
$2,900.000
|
$2,833.000
|
$3,300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,558.600
|
$1,300.000
|
$1,250.000
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,100.000
|
$790.000
|
$750.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$7,791.590
|
$12,000.000
|
$7,250.000
|
$9,100.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
52.000
|
$352.880
|
$260.000
|
$261.090
|
$305.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
13.000
|
$277.720
|
$310.000
|
$313.310
|
$370.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
17.000
|
$38,769.780
|
$28,000.000
|
$28,197.940
|
$33,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
10,225.000
|
$8.460
|
$8.250
|
$8.350
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
905.000
|
$35.110
|
$26.000
|
$26.110
|
$31.000
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
520.000
|
$0.990
|
$2.150
|
$2.090
|
$2.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
10,815.000
|
$1.150
|
$0.850
|
$0.840
|
$1.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
22,400.000
|
$1.810
|
$1.000
|
$0.940
|
$1.100
|
|
|
GROUND BOX TY A (122311)
|
EA
|
19.000
|
$1,068.140
|
$920.000
|
$922.180
|
$1,100.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
18.000
|
$903.020
|
$1,020.000
|
$1,033.920
|
$1,200.000
|
|
|
REMOVE GROUND BOX
|
EA
|
7.000
|
$284.790
|
$315.000
|
$313.310
|
$370.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
2.000
|
$733.260
|
$430.000
|
$426.100
|
$500.000
|
|
|
ELC SRV TY A 240/480 060(NS)AL(E)SP(O)
|
EA
|
8.000
|
$5,870.850
|
$6,700.000
|
$6,683.960
|
$7,900.000
|
|
|
ELC SRV TY D 120/240 100(NS)AL(N)SP(O)
|
EA
|
1.000
|
$5,500.000
|
$5,500.000
|
$5,535.150
|
$6,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
38.000
|
$22.140
|
$24.000
|
$24.020
|
$28.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
246.000
|
$26.050
|
$31.000
|
$31.330
|
$37.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
410.000
|
$38.000
|
$29.000
|
$29.240
|
$35.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
$563.730
|
$510.000
|
$487.250
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$590.920
|
$585.000
|
$559.290
|
$770.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$544.600
|
$560.000
|
$532.970
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$686.150
|
$820.000
|
$781.510
|
$975.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
17.000
|
$97.690
|
$95.000
|
$90.780
|
$140.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
223.000
|
$4.080
|
$4.250
|
$4.180
|
$5.000
|
|
|
RELOCATE LRSA
|
EA
|
2.000
|
$3,016.670
|
$1,575.000
|
$1,566.550
|
$1,900.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$509.090
|
$645.000
|
$639.150
|
$750.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$22,000.000
|
$26,000.000
|
$26,216.770
|
$31,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
1.000
|
$4,040.000
|
$2,600.000
|
$2,610.920
|
$3,100.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
1.000
|
$794.190
|
$630.000
|
$626.620
|
$735.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
4.000
|
$20.000
|
$19.000
|
$18.160
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
299.000
|
$11.830
|
$19.000
|
$18.160
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
1.000
|
$49.000
|
$58.000
|
$55.350
|
$57.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
56.000
|
$272.000
|
$14.300
|
$14.210
|
$34.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
104.000
|
$22.130
|
$22.000
|
$21.950
|
$41.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
102.000
|
$15.950
|
$22.000
|
$21.950
|
$41.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
2,621.000
|
$0.870
|
$0.700
|
$0.650
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,310.000
|
$0.630
|
$0.530
|
$0.500
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
4,522.000
|
$1.370
|
$0.930
|
$0.880
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
573.000
|
$3.330
|
$5.300
|
$5.000
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
|
EA
|
1.000
|
$60.000
|
$71.000
|
$70.000
|
$77.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
14,420.000
|
$0.660
|
$0.520
|
$0.500
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,198.000
|
$0.890
|
$1.100
|
$1.780
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,450.000
|
$0.760
|
$0.800
|
$0.770
|
$0.900
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,368.000
|
$2.900
|
$3.100
|
$3.000
|
$3.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,755.000
|
$2.140
|
$2.850
|
$2.770
|
$3.100
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$126.380
|
$180.000
|
$175.000
|
$195.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
2.000
|
$500.000
|
$225.000
|
$220.000
|
$245.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$139.610
|
$222.000
|
$220.000
|
$245.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
187.000
|
$6.200
|
$8.250
|
$8.000
|
$9.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
6,020.000
|
$0.400
|
$0.210
|
$0.200
|
$0.200
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
12,656.000
|
$0.400
|
$0.210
|
$0.200
|
$0.200
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
6,450.000
|
$0.650
|
$0.320
|
$0.300
|
$0.300
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
1,368.000
|
$1.000
|
$1.580
|
$1.500
|
$1.700
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
2,755.000
|
$10.670
|
$1.580
|
$1.500
|
$1.700
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
6.000
|
$71.590
|
$58.000
|
$55.000
|
$61.000
|
|
REFL PAV MRK TY II (W) (NUMBER)
|
EA
|
2.000
|
$110.000
|
$105.000
|
$100.000
|
$110.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
6.000
|
$75.170
|
$58.000
|
$55.000
|
$61.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
14,388.000
|
$0.350
|
$0.210
|
$0.200
|
$0.200
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
187.000
|
$3.000
|
$3.150
|
$3.000
|
$3.400
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,045.000
|
$0.430
|
$0.470
|
$0.450
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,736.000
|
$0.360
|
$0.420
|
$0.400
|
$0.450
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
6,020.000
|
$0.700
|
$0.650
|
$0.590
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,907.000
|
$0.390
|
$0.420
|
$0.400
|
$0.450
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
12,656.000
|
$1.000
|
$1.100
|
$1.050
|
$1.200
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
14,388.000
|
$1.000
|
$1.100
|
$1.050
|
$1.200
|
|
REFL PAV MRKR TY I-R
|
EA
|
42.000
|
$8.940
|
$8.500
|
$8.000
|
$8.900
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
835.000
|
$3.510
|
$4.300
|
$4.000
|
$4.450
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,543.000
|
$0.360
|
$0.460
|
$0.450
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
400.000
|
$1.410
|
$0.950
|
$0.900
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
200.000
|
$2.530
|
$1.080
|
$1.000
|
$1.100
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
3.000
|
$1,056.420
|
$1,520.000
|
$3,675.000
|
$1,700.000
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
290.000
|
$250.000
|
$35.000
|
$150.000
|
$220.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
2,488.000
|
$207.000
|
$185.000
|
$207.000
|
$207.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
5,957.000
|
$65.120
|
$70.000
|
$89.670
|
$80.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
2,343.000
|
$84.480
|
$85.000
|
$100.350
|
$97.000
|
|
|
TACK COAT
|
GAL
|
6,076.000
|
$4.000
|
$4.000
|
$3.610
|
$5.000
|
|
|
BONDING COURSE
|
GAL
|
1,593.000
|
$5.000
|
$4.050
|
$3.610
|
$5.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
16,087.000
|
$5.000
|
$4.100
|
$3.610
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
93.000
|
$106.640
|
$135.000
|
$255.630
|
$84.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
7,230.000
|
$2.220
|
$3.050
|
$3.130
|
$4.000
|
|
|
FIBER OPTIC PATCH PANEL (12 POSITION)
|
EA
|
3.000
|
$1,440.020
|
$3,050.000
|
$3,133.100
|
$3,700.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
2.000
|
$7,315.370
|
$10,200.000
|
$10,443.680
|
$12,300.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
5,900.000
|
$3.900
|
$2.050
|
$2.090
|
$2.500
|
|
|
GROUND BOX (PREPARE)
|
EA
|
18.000
|
$121.000
|
$770.000
|
$783.280
|
$920.000
|
|
|
INSTALL DMS (FOUNDATION MTD CABINET)
|
EA
|
1.000
|
$16,615.620
|
$12,250.000
|
$12,532.420
|
$15,000.000
|
|
|
RELOCATE EXISTING OVERHEAD SIGNS
|
EA
|
3.000
|
$906.380
|
$910.000
|
$939.930
|
$1,100.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
2.000
|
$14,560.000
|
$14,150.000
|
$14,621.150
|
$17,000.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
2.000
|
$5,675.000
|
$10,000.000
|
$10,339.240
|
$12,100.000
|
|
|
MODIFY EXISTING ELECTRICAL SERVICE
|
EA
|
2.000
|
$2,500.000
|
$1,020.000
|
$1,044.370
|
$1,300.000
|
|
|
ETHERNET SWITCH (INSTALL ONLY)
|
EA
|
3.000
|
$676.490
|
$510.000
|
$522.180
|
$610.000
|
|
|
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
|
EA
|
2.000
|
$576.000
|
$510.000
|
$522.180
|
$610.000
|
|
|
TERMINAL SERVER (INSTALL ONLY)
|
EA
|
3.000
|
$1,390.170
|
$510.000
|
$522.180
|
$610.000
|
|
|
LED HI MST IL AM(6 FIXT)ASYM(TY A)SHLD
|
EA
|
17.000
|
$9,200.000
|
$23,400.000
|
$24,020.470
|
$28,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
137.000
|
$220.410
|
$405.000
|
$357.880
|
$167.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
520.000
|
$85.300
|
$90.000
|
$102.250
|
$56.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
|
EA
|
2.000
|
$5,215.810
|
$6,000.000
|
$6,161.770
|
$7,200.000
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
3.000
|
$775.400
|
$970.000
|
$1,002.590
|
$1,200.000
|
|
|
TEMP Q-DETECT (TY1) (1 SYS)
|
DAY
|
10.000
|
$1,300.000
|
$360.000
|
$373.460
|
$415.000
|
|
|
TEMP Q-DETECT (TY2) (1 SYS)
|
DAY
|
15.000
|
$800.000
|
$430.000
|
$460.060
|
$510.000
|
|
|
ITS RVSD (DC ONLY) (INSTALL ONLY)
|
EA
|
5.000
|
$11,000.000
|
$820.000
|
$835.490
|
$980.000
|
|
|
EMP SPEED MONITOR (1 SYS)
|
DAY
|
780.000
|
$48.000
|
$122.000
|
$129.900
|
$145.000
|
|
|
REMOVE EXISTING LANE CONTROL SYSTEM
|
EA
|
3.000
|
$4,430.830
|
$3,550.000
|
$3,655.290
|
$4,300.000
|
|
|
REMOVE EXISTING COMMUNICATION CABINET
|
EA
|
3.000
|
$886.170
|
$260.000
|
$261.090
|
$306.000
|
|
|
REMOVE EXISTING CCTV FIELD EQUIPMENT
|
EA
|
1.000
|
$2,500.000
|
$420.000
|
$426.100
|
$500.000
|
|
|
REMOVE EXIST FIB OPT DMS SYS(TY-3)
|
EA
|
1.000
|
$7,000.000
|
$3,550.000
|
$3,655.290
|
$4,300.000
|
|
|
REMOVE EXIST RVSD
|
EA
|
1.000
|
$1,250.000
|
$255.000
|
$261.090
|
$360.000
|
|
Totals: |
$8,794,190.430
|
$8,674,931.350
|
$9,856,892.610
|
$9,896,585.700
|