TITUS US 271 (0221-05-065)

Items: 114

County: TITUS
Length: N/A
Highway: US 271
District: ATLANTA
Control Number: 0221-05-065
DBE Goal: N/A
Project: BR 2020(451)
Guaranty: N/A
Time: 602 WORKING DAYS
Engineer's Estimate: $22,253,190.36
Date: 11/04/2021 (4 years ago)
Contract Number: N/A
Type: REPLACE BRIDGES AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$22,253,190.36
$22,227,359.03
Over/Under Est: -0.12% -$25,831.33
Over/Under Est: 1.14% $253,139.73
Amt Left: 1.26% $278,971.06
$24,247,277.05
Over/Under Est: 8.96% $1,994,086.69
Amt Left: 9.09% $2,019,918.02
Delta: -7.74% -$1,740,946.96
$25,300,501.92
Over/Under Est: 13.69% $3,047,311.56
Amt Left: 13.83% $3,073,142.89
Delta: -4.34% -$1,053,224.87
$26,341,341.00
Over/Under Est: 18.37% $4,088,150.64
Amt Left: 18.51% $4,113,981.97
Delta: -4.11% -$1,040,839.08
Over/Under Est: 26.18% $5,825,397.08
Amt Left: 26.32% $5,851,228.41
Delta: -6.60% -$1,737,246.44
Subcontractor Percentage Amount
TORO BRAVO CONSTRUCTION, LLC 2.93% $673,755.71
ISAACS CONSTRUCTION SERVICES LLC 1.11% $255,245.34
MORRIS COUNTY CONTRACTORS, L.L.C. 1.00% $229,950.75
STRIPING TECHNOLOGY, L.P. 0.72% $165,564.54
FARR FOUNDATION, INC. 0.62% $142,569.47
CAP RIVER LLC 0.59% $135,670.95
JB PINNACLE GROUP, LLC 0.43% $98,878.82
KITECO PROPERTY SOLUTIONS INC. 0.39% $89,680.79
EMERY SAPP & SON'S INC. 0.16% $36,792.12
PANOLA SIGN & BARRICADE, INC. 0.15% $34,492.61
SCOUT 5 CONSTRUCTION LLC 0.12% $27,594.09
INNOVATIVE ROADWAY SOLUTIONS, LLC 0.11% $25,294.58
HX FARMS, INC. 0.11% $25,294.58
SOUTHWEST ENVIRONMENT SERVICES LLC 0.04% $9,198.03
FLEX SUPPLY, LLC 0.03% $6,898.52
TORO BRAVO CONSTRUCTION, LLC 0.03% $6,898.52
HODGES AND SON CONSTRUCTION COMPANY, INC. 0.00% $0.00
Total: 8.54% $1,963,779.42

Bid Items & Bid Tabulations

114 Total 0 of 114
TITUS  |  US 271  |  ATLANTA  |  0221-05-065  |  11/04/2021  |  $22,253,190.36  |  BR 2020(451)  |  REPLACE BRIDGES AND APPROACHES  |  602 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
HIGHWAY 19 CONSTRUCTION LLC
EAST TEXAS BRIDGE, INC.
COPASA INC
WEBBER, LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 88.500 $1,800.000 $3,400.000 $1,000.000 $5,000.000 $5,100.000 $23,585.000 $26,800.000
REMOVING CONC (DRIVEWAYS)
SY 313.000 $16.000 $22.000 $25.000 $12.000 $20.000 $7.200 $10.000
REMOVING CONC (MISC)
SY 41.000 $51.000 $32.000 $20.000 $15.000 $20.000 $20.750 $20.000
REMOVING CONCRETE(MOW STRIP)
LF 2,084.000 $10.000 $13.500 $5.000 $6.000 $8.670 $7.000 $4.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 977.000 $3.000 $5.900 $5.000 $5.000 $3.330 $3.250 $5.000
REMOVING STAB BASE & ASPH PAV (18"-22")
SY 36,748.000 $3.000 $11.250 $5.000 $11.000 $5.000 $6.900 $7.500
EXCAVATION (ROADWAY)
CY 36,986.000 $6.000 $6.250 $6.000 $6.000 $9.000 $5.850 $20.000
EXCAVATION (CHANNEL)
CY 43,345.000 $9.000 $6.250 $6.000 $6.000 $15.000 $5.150 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 19,514.000 $10.000 $9.750 $8.000 $11.000 $10.160 $17.700 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 90,710.000 $8.000 $8.000 $9.220 $8.000 $14.160 $6.000 $20.000
FURNISHING AND PLACING TOPSOIL (4")
SY 128,669.000 $1.000 $1.750 $1.000 $1.750 $1.150 $0.500 $1.100
BROADCAST SEED (TEMP) (WARM)
SY 64,337.000 $0.120 $0.110 $0.080 $0.120 $0.110 $0.150 $0.110
BROADCAST SEED (TEMP) (COOL)
SY 64,337.000 $0.120 $0.080 $0.080 $0.120 $0.110 $0.150 $0.110
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 128,669.000 $0.650 $0.650 $0.630 $0.630 $0.700 $0.600 $0.700
VEGETATIVE WATERING
MG 2,060.000 $6.000 $2.500 $10.000 $5.000 $15.000 $20.200 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 17,917.000 $1.000 $0.820 $0.850 $0.950 $2.000 $0.850 $2.000
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
SY 17,013.000 $13.000 $21.750 $16.000 $22.000 $14.850 $16.400 $20.000
CEMENT
TON 1,116.000 $163.000 $180.000 $186.000 $180.000 $200.000 $164.200 $165.000
CEMENT TREAT (SUBGRADE) (8")
SY 53,160.000 $2.500 $2.350 $3.390 $2.350 $2.960 $3.500 $2.500
CEMENT TREAT (NEW BASE) (10")
SY 17,013.000 $3.000 $2.650 $3.390 $2.350 $3.960 $3.800 $2.000
PRIME COAT & BLOTTER (MC-30)
GAL 13,293.000 $4.500 $4.250 $5.000 $5.000 $3.860 $8.050 $8.050
ASPH (TIER I)
GAL 6,559.000 $4.000 $4.350 $7.000 $4.850 $5.000 $6.100 $6.100
AGGR (TY-B GR-3)
CY 166.000 $122.000 $155.000 $250.000 $130.000 $580.000 $580.000 $500.000
D-GR HMA(SQ) TY-D PG64-22
TON 7,955.000 $125.000 $110.000 $97.450 $108.000 $97.450 $145.000 $126.500
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 32,830.000 $1.700 $2.200 $1.000 $2.000 $2.000 $0.950 $0.520
CONC PVMT (CONT REINF - CRCP) (10")
SY 36,164.000 $49.000 $80.000 $80.000 $82.000 $74.810 $79.000 $85.000
CEM STABIL BKFL
CY 1,815.000 $165.000 $145.000 $180.000 $150.000 $150.000 $111.000 $80.000
TEMPORARY SPL SHORING
SF 9,958.000 $20.000 $30.000 $36.000 $25.000 $19.000 $17.800 $10.000
DRILL SHAFT (18 IN)
LF 456.000 $92.000 $100.000 $65.000 $65.000 $155.220 $99.000 $98.000
DRILL SHAFT (36 IN)
LF 5,623.000 $240.000 $150.000 $136.000 $186.000 $208.330 $150.000 $160.000
CL C CONC (ABUT)(HPC)
CY 343.200 $950.000 $815.000 $800.000 $925.000 $967.820 $973.000 $1,000.000
CL C CONC (CAP)(HPC)
CY 498.400 $950.000 $815.000 $900.000 $950.000 $1,206.710 $1,441.000 $900.000
CL C CONC (COLUMN)(HPC)
CY 160.300 $1,000.000 $850.000 $600.000 $1,000.000 $1,224.360 $1,380.000 $1,100.000
REINF CONC SLAB (HPC)
SF 178,450.000 $21.000 $16.000 $19.640 $20.000 $18.270 $21.000 $18.000
APPROACH SLAB (HPC)
CY 795.000 $450.000 $510.000 $500.000 $575.000 $573.470 $592.000 $500.000
PRESTR CONC GIRDER (TX54)
LF 22,731.500 $130.000 $160.000 $167.270 $188.000 $155.120 $149.000 $190.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 15.000 $143.000 $285.000 $180.000 $140.000 $144.790 $267.500 $500.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,296.000 $200.000 $165.000 $110.000 $140.000 $141.090 $168.400 $175.000
RIPRAP (MOW STRIP)(4 IN)
CY 141.000 $425.000 $525.000 $450.000 $500.000 $450.000 $429.000 $475.000
RAIL (TY SSTR)(HPC)
LF 4,366.000 $95.000 $74.000 $110.000 $90.000 $81.390 $60.000 $50.000
ARMOR JOINT
LF 168.000 $61.000 $75.000 $100.000 $65.000 $75.000 $123.000 $90.000
ARMOR JOINT (SEALED)
LF 820.000 $95.000 $86.000 $100.000 $85.000 $80.000 $130.000 $95.000
CONC BOX CULV (3 FT X 3 FT)
LF 27.000 $250.000 $455.000 $350.000 $400.000 $194.460 $542.000 $450.000
RC PIPE (CL III)(18 IN)
LF 81.000 $50.000 $46.000 $48.000 $54.000 $35.810 $80.500 $110.000
RC PIPE (CL III)(24 IN)
LF 144.000 $67.000 $55.000 $65.000 $78.000 $55.260 $84.100 $125.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $9,500.000 $11,000.000 $7,000.000 $15,000.000 $14,000.000 $9,657.000 $10,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $12,750.000 $14,000.000 $11,000.000 $15,000.000 $15,000.000 $9,520.000 $12,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $712.000 $850.000 $668.000 $800.000 $523.250 $1,082.000 $1,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $1,550.000 $865.000 $824.000 $1,050.000 $1,366.620 $1,226.000 $2,000.000
CLEAN EXIST CULVERTS
EA 3.000 $1,424.000 $900.000 $1,500.000 $2,000.000 $4,000.000 $1,500.000 $2,000.000
REMOV STR (SET)
EA 4.000 $229.000 $275.000 $200.000 $500.000 $100.000 $677.000 $450.000
REMOV STR (HEADWALL)
EA 1.000 $1,300.000 $275.000 $500.000 $2,000.000 $1,459.600 $1,850.000 $1,000.000
REMOV STR (PIPE)
LF 72.000 $12.000 $18.000 $10.000 $15.000 $6.280 $18.800 $5.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 4.000 $71,167.000 $40,000.000 $60,000.000 $55,000.000 $47,000.000 $36,000.000 $50,000.000
MOBILIZATION
LS 1.000 $2,000,000.000 $1,750,000.000 $2,200,000.000 $1,700,000.000 $2,825,000.000 $2,630,000.000 $2,700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 33.000 $6,100.000 $5,000.000 $1,290.000 $2,500.000 $1,000.000 $2,930.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,388.000 $51.000 $50.000 $48.000 $48.000 $45.000 $43.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 1,388.000 $11.000 $9.500 $5.000 $10.000 $8.500 $10.000 $8.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 234.000 $26.000 $27.000 $25.000 $30.000 $24.500 $26.000 $24.500
CONSTRUCTION EXITS (REMOVE)
SY 234.000 $6.000 $9.500 $5.000 $6.000 $8.500 $6.000 $8.500
CONSTRUCTION PERIMETER FENCE
LF 1,111.000 $4.000 $4.500 $15.000 $4.400 $10.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 18,157.000 $2.750 $3.000 $2.750 $3.100 $2.750 $2.800 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 18,157.000 $1.000 $0.850 $0.500 $0.120 $0.800 $0.100 $0.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 254.000 $8.000 $4.500 $5.000 $6.600 $4.000 $6.000 $4.000
CONSTRUCTING DETOURS
SY 13,486.000 $92.000 $50.000 $40.000 $65.000 $70.130 $108.000 $50.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 9,090.000 $50.000 $55.000 $30.000 $65.000 $57.000 $31.000 $20.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 9,090.000 $7.000 $8.000 $25.000 $8.000 $12.000 $9.000 $10.000
DRIVEWAYS (CONC)
SY 439.000 $70.000 $105.000 $100.000 $100.000 $110.000 $80.000 $80.000
DRIVEWAYS (ACP)
SY 1,974.000 $41.000 $40.000 $36.500 $50.000 $85.000 $73.250 $61.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,565.000 $21.000 $28.000 $24.000 $27.000 $29.750 $25.000 $29.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,550.000 $1,870.000 $1,650.000 $1,850.000 $1,975.000 $1,700.000 $1,975.000
REMOVE METAL BEAM GUARD FENCE
LF 1,640.000 $2.500 $2.250 $1.000 $2.200 $3.500 $2.000 $3.500
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $255.000 $165.000 $150.000 $165.000 $150.000 $150.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,644.000 $3,700.000 $3,100.000 $3,600.000 $3,250.000 $3,350.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $234.000 $220.000 $150.000 $220.000 $250.000 $200.000 $250.000
CRASH CUSH ATTEN (STKPL)
EA 12.000 $763.000 $880.000 $1,000.000 $875.000 $1,000.000 $800.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 12.000 $8,000.000 $10,100.000 $8,500.000 $10,000.000 $8,000.000 $9,200.000 $10,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 15.000 $407.000 $510.000 $850.000 $510.000 $389.530 $463.000 $650.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $509.000 $1,050.000 $800.000 $1,025.000 $554.550 $931.000 $1,000.000
REMOVE SM RD SN SUP&AM
EA 9.000 $82.000 $110.000 $100.000 $50.000 $62.950 $97.000 $200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 48.000 $19.000 $17.000 $35.000 $20.000 $28.000 $15.000 $28.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 21.000 $37.000 $37.000 $35.000 $40.000 $50.000 $33.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $41.000 $37.000 $35.000 $40.000 $50.000 $33.000 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000 $30.000 $110.000 $100.000 $110.000 $110.000 $100.000 $110.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 17,191.000 $0.500 $0.250 $0.180 $0.220 $0.180 $0.200 $0.400
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 44,290.000 $0.500 $0.250 $0.180 $0.220 $0.180 $0.200 $0.400
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 12,139.000 $1.000 $1.100 $0.700 $1.100 $0.700 $0.700 $0.500
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 12,139.000 $0.750 $1.100 $0.700 $1.100 $0.700 $0.700 $0.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 10,080.000 $0.700 $1.100 $1.100 $1.100 $1.100 $1.100 $0.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,139.000 $0.700 $1.100 $1.100 $1.100 $1.100 $1.100 $0.400
PAVEMENT SEALER 10"
LF 1,416.000 $1.500 $1.100 $2.000 $1.100 $2.000 $2.000 $0.250
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
LF 1,416.000 $11.000 $16.500 $12.850 $16.000 $12.850 $12.850 $0.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $200.000 $215.000 $235.000 $215.000 $235.000 $235.000 $150.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 46.000 $14.000 $16.500 $18.000 $16.000 $18.000 $18.000 $18.000
REFL PAV MRKR TY I-C
EA 144.000 $4.000 $4.500 $5.000 $4.300 $5.000 $5.000 $5.000
REFL PAV MRKR TY II-A-A
EA 305.000 $4.000 $4.500 $5.000 $4.300 $5.000 $5.000 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 32,130.000 $0.400 $0.720 $0.450 $0.700 $0.450 $0.450 $0.250
PAV SURF PREP FOR MRK (6")
LF 62,547.000 $0.400 $0.170 $0.120 $0.160 $0.120 $0.150 $0.100
PAV SURF PREP FOR MRK (10")
LF 1,416.000 $0.300 $2.250 $1.200 $2.200 $1.200 $1.200 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 8.000 $51.000 $90.000 $25.000 $85.000 $25.000 $25.000 $25.000
SP MIXES SP-D SAC-A PG76-22
TON 5,553.000 $90.000 $130.000 $107.000 $115.000 $106.950 $150.000 $152.000
TACK COAT
GAL 12,620.000 $3.000 $3.500 $5.000 $4.000 $4.800 $5.200 $5.200
THERMOPLASTIC PIPE (SIZE)(HDPE)
LF 1,600.000 $138.000 $30.000 $21.000 $55.000 $96.520 $34.000 $35.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 6.000 $255.000 $400.000 $350.000 $500.000 $360.000 $200.000 $500.000
INSTALL FTB
LF 148.000 $40.000 $33.000 $30.000 $40.000 $55.000 $32.000 $40.000
REMOVE FTB
LF 148.000 $12.000 $5.500 $10.000 $11.000 $55.000 $7.850 $20.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $18,000.000 $10,000.000 $20,000.000 $10,000.000 $17,212.000 $10,000.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 29,594.000 $0.520 $0.720 $0.610 $0.720 $0.610 $0.650 $0.500
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 1,415.000 $0.600 $1.100 $0.710 $1.100 $0.710 $0.750 $0.500
REFL PAV MRK AWT (W) 6" (DOT) (100MIL)
LF 392.000 $1.000 $1.100 $1.000 $1.100 $1.000 $1.000 $0.500
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 26,358.000 $0.550 $0.720 $0.610 $0.720 $0.610 $0.650 $0.500
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 4,789.000 $0.550 $0.720 $0.710 $0.720 $0.710 $0.750 $0.500
TMA (STATIONARY)
DAY 1,706.000 $100.000 $100.000 $100.000 $60.000 $220.000 $88.000 $40.000
TMA (MOBILE OPERATION)
DAY 2.000 $82.000 $200.000 $500.000 $300.000 $500.000 $765.000 $500.000
Totals: $22,253,190.360 $22,227,359.030 $22,506,330.095 $24,247,277.050 $25,300,501.936 $26,341,341.000 $28,078,587.440