PREPARING ROW
|
STA
|
88.500
|
$1,800.000
|
$3,400.000
|
$1,000.000
|
$5,000.000
|
$5,100.000
|
$23,585.000
|
$26,800.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
313.000
|
$16.000
|
$22.000
|
$25.000
|
$12.000
|
$20.000
|
$7.200
|
$10.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
41.000
|
$51.000
|
$32.000
|
$20.000
|
$15.000
|
$20.000
|
$20.750
|
$20.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,084.000
|
$10.000
|
$13.500
|
$5.000
|
$6.000
|
$8.670
|
$7.000
|
$4.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
977.000
|
$3.000
|
$5.900
|
$5.000
|
$5.000
|
$3.330
|
$3.250
|
$5.000
|
|
|
REMOVING STAB BASE & ASPH PAV (18"-22")
|
SY
|
36,748.000
|
$3.000
|
$11.250
|
$5.000
|
$11.000
|
$5.000
|
$6.900
|
$7.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
36,986.000
|
$6.000
|
$6.250
|
$6.000
|
$6.000
|
$9.000
|
$5.850
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
43,345.000
|
$9.000
|
$6.250
|
$6.000
|
$6.000
|
$15.000
|
$5.150
|
$8.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
19,514.000
|
$10.000
|
$9.750
|
$8.000
|
$11.000
|
$10.160
|
$17.700
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
90,710.000
|
$8.000
|
$8.000
|
$9.220
|
$8.000
|
$14.160
|
$6.000
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
128,669.000
|
$1.000
|
$1.750
|
$1.000
|
$1.750
|
$1.150
|
$0.500
|
$1.100
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
64,337.000
|
$0.120
|
$0.110
|
$0.080
|
$0.120
|
$0.110
|
$0.150
|
$0.110
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
64,337.000
|
$0.120
|
$0.080
|
$0.080
|
$0.120
|
$0.110
|
$0.150
|
$0.110
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
128,669.000
|
$0.650
|
$0.650
|
$0.630
|
$0.630
|
$0.700
|
$0.600
|
$0.700
|
|
|
VEGETATIVE WATERING
|
MG
|
2,060.000
|
$6.000
|
$2.500
|
$10.000
|
$5.000
|
$15.000
|
$20.200
|
$10.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
17,917.000
|
$1.000
|
$0.820
|
$0.850
|
$0.950
|
$2.000
|
$0.850
|
$2.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
17,013.000
|
$13.000
|
$21.750
|
$16.000
|
$22.000
|
$14.850
|
$16.400
|
$20.000
|
|
|
CEMENT
|
TON
|
1,116.000
|
$163.000
|
$180.000
|
$186.000
|
$180.000
|
$200.000
|
$164.200
|
$165.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
53,160.000
|
$2.500
|
$2.350
|
$3.390
|
$2.350
|
$2.960
|
$3.500
|
$2.500
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
17,013.000
|
$3.000
|
$2.650
|
$3.390
|
$2.350
|
$3.960
|
$3.800
|
$2.000
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
13,293.000
|
$4.500
|
$4.250
|
$5.000
|
$5.000
|
$3.860
|
$8.050
|
$8.050
|
|
|
ASPH (TIER I)
|
GAL
|
6,559.000
|
$4.000
|
$4.350
|
$7.000
|
$4.850
|
$5.000
|
$6.100
|
$6.100
|
|
|
AGGR (TY-B GR-3)
|
CY
|
166.000
|
$122.000
|
$155.000
|
$250.000
|
$130.000
|
$580.000
|
$580.000
|
$500.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
7,955.000
|
$125.000
|
$110.000
|
$97.450
|
$108.000
|
$97.450
|
$145.000
|
$126.500
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
32,830.000
|
$1.700
|
$2.200
|
$1.000
|
$2.000
|
$2.000
|
$0.950
|
$0.520
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
36,164.000
|
$49.000
|
$80.000
|
$80.000
|
$82.000
|
$74.810
|
$79.000
|
$85.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,815.000
|
$165.000
|
$145.000
|
$180.000
|
$150.000
|
$150.000
|
$111.000
|
$80.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
9,958.000
|
$20.000
|
$30.000
|
$36.000
|
$25.000
|
$19.000
|
$17.800
|
$10.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
456.000
|
$92.000
|
$100.000
|
$65.000
|
$65.000
|
$155.220
|
$99.000
|
$98.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
5,623.000
|
$240.000
|
$150.000
|
$136.000
|
$186.000
|
$208.330
|
$150.000
|
$160.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
343.200
|
$950.000
|
$815.000
|
$800.000
|
$925.000
|
$967.820
|
$973.000
|
$1,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
498.400
|
$950.000
|
$815.000
|
$900.000
|
$950.000
|
$1,206.710
|
$1,441.000
|
$900.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
160.300
|
$1,000.000
|
$850.000
|
$600.000
|
$1,000.000
|
$1,224.360
|
$1,380.000
|
$1,100.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
178,450.000
|
$21.000
|
$16.000
|
$19.640
|
$20.000
|
$18.270
|
$21.000
|
$18.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
795.000
|
$450.000
|
$510.000
|
$500.000
|
$575.000
|
$573.470
|
$592.000
|
$500.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
22,731.500
|
$130.000
|
$160.000
|
$167.270
|
$188.000
|
$155.120
|
$149.000
|
$190.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
15.000
|
$143.000
|
$285.000
|
$180.000
|
$140.000
|
$144.790
|
$267.500
|
$500.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,296.000
|
$200.000
|
$165.000
|
$110.000
|
$140.000
|
$141.090
|
$168.400
|
$175.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
141.000
|
$425.000
|
$525.000
|
$450.000
|
$500.000
|
$450.000
|
$429.000
|
$475.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
4,366.000
|
$95.000
|
$74.000
|
$110.000
|
$90.000
|
$81.390
|
$60.000
|
$50.000
|
|
|
ARMOR JOINT
|
LF
|
168.000
|
$61.000
|
$75.000
|
$100.000
|
$65.000
|
$75.000
|
$123.000
|
$90.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
820.000
|
$95.000
|
$86.000
|
$100.000
|
$85.000
|
$80.000
|
$130.000
|
$95.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
27.000
|
$250.000
|
$455.000
|
$350.000
|
$400.000
|
$194.460
|
$542.000
|
$450.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
81.000
|
$50.000
|
$46.000
|
$48.000
|
$54.000
|
$35.810
|
$80.500
|
$110.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
144.000
|
$67.000
|
$55.000
|
$65.000
|
$78.000
|
$55.260
|
$84.100
|
$125.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$9,500.000
|
$11,000.000
|
$7,000.000
|
$15,000.000
|
$14,000.000
|
$9,657.000
|
$10,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$12,750.000
|
$14,000.000
|
$11,000.000
|
$15,000.000
|
$15,000.000
|
$9,520.000
|
$12,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$712.000
|
$850.000
|
$668.000
|
$800.000
|
$523.250
|
$1,082.000
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,550.000
|
$865.000
|
$824.000
|
$1,050.000
|
$1,366.620
|
$1,226.000
|
$2,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
3.000
|
$1,424.000
|
$900.000
|
$1,500.000
|
$2,000.000
|
$4,000.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$229.000
|
$275.000
|
$200.000
|
$500.000
|
$100.000
|
$677.000
|
$450.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,300.000
|
$275.000
|
$500.000
|
$2,000.000
|
$1,459.600
|
$1,850.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
72.000
|
$12.000
|
$18.000
|
$10.000
|
$15.000
|
$6.280
|
$18.800
|
$5.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
4.000
|
$71,167.000
|
$40,000.000
|
$60,000.000
|
$55,000.000
|
$47,000.000
|
$36,000.000
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,000,000.000
|
$1,750,000.000
|
$2,200,000.000
|
$1,700,000.000
|
$2,825,000.000
|
$2,630,000.000
|
$2,700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
33.000
|
$6,100.000
|
$5,000.000
|
$1,290.000
|
$2,500.000
|
$1,000.000
|
$2,930.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
1,388.000
|
$51.000
|
$50.000
|
$48.000
|
$48.000
|
$45.000
|
$43.000
|
$45.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,388.000
|
$11.000
|
$9.500
|
$5.000
|
$10.000
|
$8.500
|
$10.000
|
$8.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
234.000
|
$26.000
|
$27.000
|
$25.000
|
$30.000
|
$24.500
|
$26.000
|
$24.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$6.000
|
$9.500
|
$5.000
|
$6.000
|
$8.500
|
$6.000
|
$8.500
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
1,111.000
|
$4.000
|
$4.500
|
$15.000
|
$4.400
|
$10.000
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
18,157.000
|
$2.750
|
$3.000
|
$2.750
|
$3.100
|
$2.750
|
$2.800
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
18,157.000
|
$1.000
|
$0.850
|
$0.500
|
$0.120
|
$0.800
|
$0.100
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
254.000
|
$8.000
|
$4.500
|
$5.000
|
$6.600
|
$4.000
|
$6.000
|
$4.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
13,486.000
|
$92.000
|
$50.000
|
$40.000
|
$65.000
|
$70.130
|
$108.000
|
$50.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
9,090.000
|
$50.000
|
$55.000
|
$30.000
|
$65.000
|
$57.000
|
$31.000
|
$20.000
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
9,090.000
|
$7.000
|
$8.000
|
$25.000
|
$8.000
|
$12.000
|
$9.000
|
$10.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
439.000
|
$70.000
|
$105.000
|
$100.000
|
$100.000
|
$110.000
|
$80.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,974.000
|
$41.000
|
$40.000
|
$36.500
|
$50.000
|
$85.000
|
$73.250
|
$61.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,565.000
|
$21.000
|
$28.000
|
$24.000
|
$27.000
|
$29.750
|
$25.000
|
$29.750
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,550.000
|
$1,870.000
|
$1,650.000
|
$1,850.000
|
$1,975.000
|
$1,700.000
|
$1,975.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,640.000
|
$2.500
|
$2.250
|
$1.000
|
$2.200
|
$3.500
|
$2.000
|
$3.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$255.000
|
$165.000
|
$150.000
|
$165.000
|
$150.000
|
$150.000
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,644.000
|
$3,700.000
|
$3,100.000
|
$3,600.000
|
$3,250.000
|
$3,350.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$234.000
|
$220.000
|
$150.000
|
$220.000
|
$250.000
|
$200.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
12.000
|
$763.000
|
$880.000
|
$1,000.000
|
$875.000
|
$1,000.000
|
$800.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
12.000
|
$8,000.000
|
$10,100.000
|
$8,500.000
|
$10,000.000
|
$8,000.000
|
$9,200.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
15.000
|
$407.000
|
$510.000
|
$850.000
|
$510.000
|
$389.530
|
$463.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$509.000
|
$1,050.000
|
$800.000
|
$1,025.000
|
$554.550
|
$931.000
|
$1,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
9.000
|
$82.000
|
$110.000
|
$100.000
|
$50.000
|
$62.950
|
$97.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
48.000
|
$19.000
|
$17.000
|
$35.000
|
$20.000
|
$28.000
|
$15.000
|
$28.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
21.000
|
$37.000
|
$37.000
|
$35.000
|
$40.000
|
$50.000
|
$33.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
9.000
|
$41.000
|
$37.000
|
$35.000
|
$40.000
|
$50.000
|
$33.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$30.000
|
$110.000
|
$100.000
|
$110.000
|
$110.000
|
$100.000
|
$110.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
17,191.000
|
$0.500
|
$0.250
|
$0.180
|
$0.220
|
$0.180
|
$0.200
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
44,290.000
|
$0.500
|
$0.250
|
$0.180
|
$0.220
|
$0.180
|
$0.200
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
12,139.000
|
$1.000
|
$1.100
|
$0.700
|
$1.100
|
$0.700
|
$0.700
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
12,139.000
|
$0.750
|
$1.100
|
$0.700
|
$1.100
|
$0.700
|
$0.700
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,080.000
|
$0.700
|
$1.100
|
$1.100
|
$1.100
|
$1.100
|
$1.100
|
$0.400
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
16,139.000
|
$0.700
|
$1.100
|
$1.100
|
$1.100
|
$1.100
|
$1.100
|
$0.400
|
|
|
PAVEMENT SEALER 10"
|
LF
|
1,416.000
|
$1.500
|
$1.100
|
$2.000
|
$1.100
|
$2.000
|
$2.000
|
$0.250
|
|
PREFAB PAV MRK TY B (W)(6")(BRK)CNTST
|
LF
|
1,416.000
|
$11.000
|
$16.500
|
$12.850
|
$16.000
|
$12.850
|
$12.850
|
$0.250
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$200.000
|
$215.000
|
$235.000
|
$215.000
|
$235.000
|
$235.000
|
$150.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
46.000
|
$14.000
|
$16.500
|
$18.000
|
$16.000
|
$18.000
|
$18.000
|
$18.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
144.000
|
$4.000
|
$4.500
|
$5.000
|
$4.300
|
$5.000
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
305.000
|
$4.000
|
$4.500
|
$5.000
|
$4.300
|
$5.000
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
32,130.000
|
$0.400
|
$0.720
|
$0.450
|
$0.700
|
$0.450
|
$0.450
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
62,547.000
|
$0.400
|
$0.170
|
$0.120
|
$0.160
|
$0.120
|
$0.150
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (10")
|
LF
|
1,416.000
|
$0.300
|
$2.250
|
$1.200
|
$2.200
|
$1.200
|
$1.200
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
8.000
|
$51.000
|
$90.000
|
$25.000
|
$85.000
|
$25.000
|
$25.000
|
$25.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
5,553.000
|
$90.000
|
$130.000
|
$107.000
|
$115.000
|
$106.950
|
$150.000
|
$152.000
|
|
|
TACK COAT
|
GAL
|
12,620.000
|
$3.000
|
$3.500
|
$5.000
|
$4.000
|
$4.800
|
$5.200
|
$5.200
|
|
|
THERMOPLASTIC PIPE (SIZE)(HDPE)
|
LF
|
1,600.000
|
$138.000
|
$30.000
|
$21.000
|
$55.000
|
$96.520
|
$34.000
|
$35.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
6.000
|
$255.000
|
$400.000
|
$350.000
|
$500.000
|
$360.000
|
$200.000
|
$500.000
|
|
|
INSTALL FTB
|
LF
|
148.000
|
$40.000
|
$33.000
|
$30.000
|
$40.000
|
$55.000
|
$32.000
|
$40.000
|
|
|
REMOVE FTB
|
LF
|
148.000
|
$12.000
|
$5.500
|
$10.000
|
$11.000
|
$55.000
|
$7.850
|
$20.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$18,000.000
|
$10,000.000
|
$20,000.000
|
$10,000.000
|
$17,212.000
|
$10,000.000
|
|
|
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
|
LF
|
29,594.000
|
$0.520
|
$0.720
|
$0.610
|
$0.720
|
$0.610
|
$0.650
|
$0.500
|
|
|
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
|
LF
|
1,415.000
|
$0.600
|
$1.100
|
$0.710
|
$1.100
|
$0.710
|
$0.750
|
$0.500
|
|
|
REFL PAV MRK AWT (W) 6" (DOT) (100MIL)
|
LF
|
392.000
|
$1.000
|
$1.100
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$0.500
|
|
|
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
|
LF
|
26,358.000
|
$0.550
|
$0.720
|
$0.610
|
$0.720
|
$0.610
|
$0.650
|
$0.500
|
|
|
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
|
LF
|
4,789.000
|
$0.550
|
$0.720
|
$0.710
|
$0.720
|
$0.710
|
$0.750
|
$0.500
|
|
|
TMA (STATIONARY)
|
DAY
|
1,706.000
|
$100.000
|
$100.000
|
$100.000
|
$60.000
|
$220.000
|
$88.000
|
$40.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$82.000
|
$200.000
|
$500.000
|
$300.000
|
$500.000
|
$765.000
|
$500.000
|
|
Totals: |
$22,253,190.360
|
$22,227,359.030
|
$22,506,330.095
|
$24,247,277.050
|
$25,300,501.936
|
$26,341,341.000
|
$28,078,587.440
|